North America Data Center Construction Market - Industry Outlook & Forecast 2026-2031

  • PDF Icon

    Report

  • 283 Pages
  • July 2026
  • Region: North America
  • Arizton
  • ID: 6273748
1h Free Analyst Time
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

The North America Data Center Construction Market was valued at USD 85.23 Billion in 2025, and is projected to reach USD 158.20 Billion by 2031, rising at a CAGR of 10.86%.

NORTH AMERICA DATA CENTER CONSTRUCTION MARKET TRENDS

Sustainability Initiatives and Renewable Energy

  • The North America data center industry is increasingly aligning with renewable energy adoption as hyperscale operators scale AI and cloud infrastructure. Companies are prioritizing long-term clean power procurement strategies, including wind, solar, and emerging firm renewable technologies, to reduce carbon intensity while meeting the rapidly growing electricity demand.
  • In May 2026, Meta signed an agreement with DESRI for solar PPAs worth 850 MW across Oklahoma, Texas, and Mississippi to expand its contracted renewable energy portfolio to over 2.5 GW, reinforcing a sustainability strategy that directly links large-scale data center growth in the US with utility-scale solar and storage deployment across multiple regional grids.
  • Sustainability and renewable energy have become central to North America's data center construction market, with operators increasingly integrating renewable power procurement, energy-efficient cooling technologies, water conservation measures, and low-carbon building designs to meet corporate net-zero commitments while supporting the rapid growth of AI and cloud infrastructure.

AI-driven Expansion of Hyperscale and Mega Data Centers

  • North America continues to strengthen its position as the global hub for hyperscale infrastructure, supported by sustained investments from major hyperscale operators such as Amazon Web Services, Microsoft, Google, Meta, and Apple. These investments are driving the construction of larger campuses, expansion in power capacity, and the deployment of advanced AI computing resources.
  • The market is rapidly transitioning toward purpose-built AI campuses equipped with high-density GPU clusters, liquid cooling, and multi-hundred-megawatt power infrastructure. For example, Microsoft unveiled its Fairwater AI data center in Wisconsin in September 2025, designed to support hundreds of thousands of NVIDIA GPUs.
  • Long-term hyperscale capacity commitments and multi-gigawatt campus developments are accelerating data center construction across North America, reinforcing the region's position as the world's largest hub for AI and cloud infrastructure.

SEGMENTATION INSIGHTS

  • The electrical infrastructure is witnessing several innovations in UPS systems, generators, transfer switches & switchgear, and other electrical equipment. Some such innovations include HVO fuel for generator sets, which reduces emissions as a measure to curb emissions.
  • Additionally, several innovative UPS batteries such as Nickel-Zinc (NiZn) and Sodium-Ion batteries are gaining traction in the market due to their high power density, safety, sustainability, and other factors.
  • Liquid cooling is emerging as a key technology in North America's data center construction market, with hyperscale and colocation operators increasingly integrating direct-to-chip and immersion cooling systems into new facilities to support high-density AI and GPU workloads while improving energy efficiency.

GEOGRAPHICAL ANALYSIS

  • The US dominates the North America data center construction market, accounting for the majority of regional investments, supported by the presence of leading hyperscale cloud providers, robust digital infrastructure, and strong demand for AI, cloud computing, and colocation services.
  • Data center development is expanding beyond established hubs into secondary markets as operators seek locations with lower land costs, greater power availability, and favorable regulatory environments. For example, in May 2026, Tract announced three large-scale developments in the Austin-San Antonio corridor, representing up to 5.2 GW of planned capacity.
  • Canada is emerging as a strategic growth market, supported by abundant renewable energy, cooler climatic conditions, and increasing AI infrastructure investments. For example, in January 2026, Synapse Data Center Inc. proposed a 1 GW data center campus in Olds, Alberta, highlighting the province's growing role in hyperscale development.
  • Geographic diversification is becoming a key market trend across North America, as operators move beyond traditional hubs to develop hyperscale campuses in emerging locations with scalable power infrastructure, ample land availability, and lower development costs, supporting long-term AI and cloud capacity expansion.

NORTH AMERICA DATA CENTER CONSTRUCTION MARKET VENDORS

  • The North America data center construction market is characterized by the presence of major hyperscale cloud providers, colocation operators, and infrastructure developers, including Amazon Web Services (AWS), Apple, Applied Digital, Bell, Cologix, Compass Datacenters, CyrusOne, DataBank, Digital Realty, Equinix, eStruxture Data Centers, Google, Meta, Microsoft, NTT DATA, QScale, STACK Infrastructure, Urbacon Data Centre Solutions, Vantage Data Centers, and others.
  • The North America data center construction market continues to attract large-scale investments from major operators. For example, in May 2026, Google announced a $15 billion investment to develop a new hyperscale data center campus in New Florence, Missouri. The project includes the addition of 500 MW of new power capacity in collaboration with Ameren to support growing AI and cloud computing demand.
  • New Entrants include Ada Infrastructure, Ardent Data Centers, Beacon AI Centers, CleanArc Data Centers, Fleet Data Centers, Metrobloks, Prometheus Hyperscale, Quantum Loophole, Related Digital, Rowan Digital Infrastructure, Tract, and Yondr Group. These companies are expanding the market by developing hyperscale- and AI-ready campuses in emerging locations, increasing competition and supporting the region's growing demand for cloud and AI infrastructure.

Segmentation by Facility Type

  • Hyperscale Data Centers
  • Colocation Data Centers
  • Enterprise Data Centers

Segmentation by Infrastructure

  • IT Infrastructure
  • Electrical Infrastructure
  • Mechanical Infrastructure
  • General Construction

Segmentation by IT Infrastructure

  • Server Infrastructure
  • Storage Infrastructure
  • Network Infrastructure

Segmentation by Electrical Infrastructure

  • UPS Systems
  • Generators
  • Transfer Switches & Switchgear
  • PDUs
  • Other Electrical Infrastructure

Segmentation by Mechanical Infrastructure

  • Cooling Systems
  • Racks
  • Other Mechanical Infrastructure

Segmentation by Cooling Systems

  • CRAC & CRAH Units
  • Chiller Units
  • Cooling Towers, Condensers, and Dry Coolers
  • Other Cooling Units

Segmentation by Cooling Techniques

  • Air-based
  • Liquid-based

Segmentation by General Construction

  • Core & Shell Development
  • Installation & Commissioning Services
  • Engineering & Building Design
  • Physical Security
  • Fire Detection & Suppression
  • DCIM

Segmentation by Tier Standard

  • Tier I & II
  • Tier III
  • Tier IV

Segmentation by Geography

  • North America
    • US
    • Cananda

Key Data Center Support Infrastructure Providers

  • ABB
  • Alfa Laval
  • Caterpillar
  • Cummins
  • Dataprobe
  • Eaton
  • Generac Power Systems
  • Johnson Controls
  • KyotoCooling
  • Legrand
  • Mitsubishi Electric
  • Panduit
  • Rittal
  • Rolls-Royce
  • Schneider Electric
  • Siemens
  • STULZ
  • Toshiba
  • Vertiv

Other Data Center Support Infrastructure Providers

  • Accelsius
  • Airedale
  • Asetek
  • Bloom Energy
  • Carrier
  • Chatsworth Products
  • ClimateWorx
  • CoolIT Systems
  • Condair
  • Cormant
  • Cyber Power Systems
  • Delta Electronics
  • Enlogic
  • FNT Software
  • Green Revolution Cooling (GRC)
  • HIMOINSA (Yanmar)
  • HITEC Power Protection
  • KOHLER (Rehlko)
  • NetZoom
  • Nlyte Software
  • Piller Power Systems
  • Trane
  • ZincFive

Key Data Center Contractors & Subcontractors

  • AECOM
  • Ames Construction
  • Arup
  • Barge Design Solutions
  • Black & Veatch
  • Burns & McDonnell
  • Computer Room Services Corporation (CRSC)
  • Construction Dinamo
  • Corgan
  • Domaco Encocorp Construction
  • DPR Construction
  • EllisDon
  • First Gulf
  • Fortis Construction
  • Haydon
  • HDR
  • Holder Construction
  • Jacobs
  • KDC
  • Kiewit Corporation
  • Lewis Michael Consultants
  • Morgan Construction
  • Morgan Corp
  • Page
  • Revenco
  • Rogers-O’Brien Construction
  • Rosendin Electric
  • Salas O’Brien
  • Salute
  • Stantec
  • Syska Hennessy Group
  • Turner Construction
  • Urbacon

Other Data Center Contractors & Subcontractors

  • AlfaTech
  • Aplena
  • Bird Construction
  • BlueScope Construction
  • Brasfield & Gorrie
  • CallisonRTKL
  • Clark Construction Group
  • Clayco
  • Climatec
  • Clune Construction
  • EMCOR Group
  • Fluor Corporation
  • Gensler
  • Gilbane Building Company
  • Gray
  • Hensel Phelps
  • HITT Contracting
  • Hoffman Construction
  • JE Dunn Construction
  • JHET Architects
  • JTM Construction
  • Karbon Engineering
  • kW Engineering
  • Linesight
  • M+W Group (Exyte)
  • McCarthy Building Companies
  • Morrison Hershfield
  • Mortenson
  • PCL Construction
  • Pepper Construction
  • Pomerleau
  • Rider Levett Bucknall (RLB)
  • Ryan Companies
  • Sheehan Nagle Hartray Architects
  • Skanska
  • Southland Industries
  • STO Building Group
  • Sturgeon Electric Company
  • Suffolk Construction
  • Sundt Construction
  • TAG Engineering
  • The Mulhern Group
  • The Walsh Group
  • The Weitz Company
  • The Whiting-Turner Contracting Co.
  • TRINITY Group Construction
  • Walbridge
  • WSP
  • WZMH Architects

Key Data Center Investors

  • Amazon Web Services
  • Apple
  • Applied Digital
  • Cologix
  • Compass Datacenters
  • CyrusOne
  • DataBank
  • Digital Realty
  • Equinix
  • eStruxture Data Centers
  • Google
  • Meta
  • Microsoft
  • NTT DATA
  • QScale
  • STACK Infrastructure
  • Urbacon Data Centre Solutions
  • Vantage Data Centers

Other Data Center Investors

  • AAIM DataCenters
  • Aligned Data Centers
  • American Tower
  • AUBix
  • Bell
  • Csquare
  • CloudHQ
  • Corscale Data Centers
  • COPT Defense Properties
  • Core Scientific
  • CENTRA
  • Crusoe
  • DartPoints
  • DC BLOX
  • EdgeConneX
  • Edged
  • EdgeCore Digital Infrastructure
  • Element Critical
  • fifteenfortyseven Critical Systems Realty (1547)
  • Flexential
  • H5 Data Centers
  • HostDime
  • Hut 8
  • Iron Mountain
  • Netrality Data Centers
  • Novva Data Centers
  • PowerHouse Data Centers
  • Prime Data Centers
  • QTS Data Centers
  • RadiusDC
  • Sabey Data Centers
  • Skybox Datacenters
  • Stream Data Centers
  • Switch
  • T5 Data Centers
  • TierPoint
  • WhiteFiber
  • Yondr Group
  • 365 Data Centers
  • 5C Data Centers

New Entrants

  • Ada Infrastructure
  • Ardent Data Centers
  • Beacon Data Centers
  • Beale Infrastructure
  • Big Sky Digital Infrastructure
  • CleanArc Data Centers
  • CloudBurst Data Centers
  • Colovore
  • Crane Data Centers
  • Data District
  • Fleet Data Centers
  • Lambda
  • LightHouse Data Centers
  • Metroblocks
  • NE Edge
  • Penzance
  • Prometheus Hyperscale
  • Related digital
  • Rowan Digital Infrastructure
  • Tract

KEY QESTIONS ANSWERED

1. How big is the North America data center construction market?
2. What is the growth rate of the North America data center construction market?
3. What is the estimated market size in terms of area in the North America data center construction market by 2031?
4. What are the key trends in the North America data center construction market?
5. How much MW of power capacity is expected to reach the North America data center construction market by 2031?

Table of Contents

1. About the Analyst2. Data Center Capabilities3. What's Included4. Segments Included5. Research Methodology6. Market at Glance7. Premium Insights8. Introduction
9. Investment Opportunities
9.1. Investment: Market Size & Forecast
9.2. Area: Market Size & Forecast
9.3. Power Capacity: Market Size & Forecast
10. Market Dynamics
10.1. Market Opportunities & Trends
10.2. Market Growth Enablers
10.3. Market Restraints
10.4. Site Selection Criteria
11. Facility Type Segmentation
11.1. Hyperscale Data Centers
11.2. Colocation Data Centers
11.3. Enterprise Data Centers
12. Infrastructure Segmentation
12.1. Electrical Infrastructure
12.2. Mechanical Infrastructure
12.3. Cooling Systems
12.4. Cooling Techniques
12.5. General Construction
13. Tier Standards Segmentation14. Geography Segmentation
15. North America
15.1. Market Snapshot & Key Highlights
15.2. Data Center Market by Support Infrastructure
15.3. List of Upcoming Data Center Projects in the North America
16. Us
16.1. Impact of Ai on the Data Center Industry in US
16.2. Government Rule and Regulation for Data Center
16.3. Market by Investment
16.4. Market by Area
16.5. Market by Power Capacity
16.6. Key Support Infrastructure Adoption
17. Canada
17.1. Impact of Ai on the Data Center Industry in Canada
17.2. Government Rule and Regulation for Data Center
17.3. Market by Investment
17.4. Market by Area
17.5. Market by Power Capacity
17.6. Key Support Infrastructure Adoption
18. Market Participants
18.1. Key Data Center Support Infrastructure Providers
18.2. Other Data Center Support Infrastructure Providers
18.3. Key Data Center Contractors & Subcontractors
18.4. Other Data Center Contractors & Subcontractors
18.5. Key Data Center Investors
18.6. Other Data Center Investors
18.7. New Entrants
19. Quantitative Summary
20. Appendix
20.1. Abbreviations
20.2. Definitions
20.3. Segmental Coverage

Companies Mentioned

  • ABB
  • Alfa Laval
  • Caterpillar
  • Cummins
  • Dataprobe
  • Eaton
  • Generac Power Systems
  • Johnson Controls
  • KyotoCooling
  • Legrand
  • Mitsubishi Electric
  • Panduit
  • Rittal
  • Rolls-Royce
  • Schneider Electric
  • Siemens
  • STULZ
  • Toshiba
  • Vertiv
  • Accelsius
  • Airedale
  • Asetek
  • Bloom Energy
  • Carrier
  • Chatsworth Products
  • ClimateWorx
  • CoolIT Systems
  • Condair
  • Cormant
  • Cyber Power Systems
  • Delta Electronics
  • Enlogic
  • FNT Software
  • Green Revolution Cooling (GRC)
  • HIMOINSA (Yanmar)
  • HITEC Power Protection
  • KOHLER (Rehlko)
  • NetZoom
  • Nlyte Software
  • Piller Power Systems
  • Trane
  • ZincFive
  • AECOM
  • Ames Construction
  • Arup
  • Barge Design Solutions
  • Black & Veatch
  • Burns & McDonnell
  • Computer Room Services Corporation (CRSC)
  • Construction Dinamo
  • Corgan
  • Domaco Encocorp Construction
  • DPR Construction
  • EllisDon
  • First Gulf
  • Fortis Construction
  • Haydon
  • HDR
  • Holder Construction
  • Jacobs
  • KDC
  • Kiewit Corporation
  • Lewis Michael Consultants
  • Morgan Construction
  • Morgan Corp
  • Page
  • Revenco
  • Rogers-O’Brien Construction
  • Rosendin Electric
  • Salas O’Brien
  • Salute
  • Stantec
  • Syska Hennessy Group
  • Turner Construction
  • Urbacon
  • AlfaTech
  • Aplena
  • Bird Construction
  • BlueScope Construction
  • Brasfield & Gorrie
  • CallisonRTKL
  • Clark Construction Group
  • Clayco
  • Climatec
  • Clune Construction
  • EMCOR Group
  • Fluor Corporation
  • Gensler
  • Gilbane Building Company
  • Gray
  • Hensel Phelps
  • HITT Contracting
  • Hoffman Construction
  • JE Dunn Construction
  • JHET Architects
  • JTM Construction
  • Karbon Engineering
  • kW Engineering
  • Linesight
  • M+W Group (Exyte)
  • McCarthy Building Companies
  • Morrison Hershfield
  • Mortenson
  • PCL Construction
  • Pepper Construction
  • Pomerleau
  • Rider Levett Bucknall (RLB)
  • Ryan Companies
  • Sheehan Nagle Hartray Architects
  • Skanska
  • Southland Industries
  • STO Building Group
  • Sturgeon Electric Company
  • Suffolk Construction
  • Sundt Construction
  • TAG Engineering
  • The Mulhern Group
  • The Walsh Group
  • The Weitz Company
  • The Whiting-Turner Contracting Co.
  • TRINITY Group Construction
  • Walbridge
  • WSP
  • WZMH Architects
  • Amazon Web Services
  • Apple
  • Applied Digital
  • Cologix
  • Compass Datacenters
  • CyrusOne
  • DataBank
  • Digital Realty
  • Equinix
  • eStruxture Data Centers
  • Google
  • Meta
  • Microsoft
  • NTT DATA
  • QScale
  • STACK Infrastructure
  • Urbacon Data Centre Solutions
  • Vantage Data Centers
  • AAIM DataCenters
  • Aligned Data Centers
  • American Tower
  • AUBix
  • Bell
  • Csquare
  • CloudHQ
  • Corscale Data Centers
  • COPT Defense Properties
  • Core Scientific
  • CENTRA
  • Crusoe
  • DartPoints
  • DC BLOX
  • EdgeConneX
  • Edged
  • EdgeCore Digital Infrastructure
  • Element Critical
  • fifteenfortyseven Critical Systems Realty (1547)
  • Flexential
  • H5 Data Centers
  • HostDime
  • Hut 8
  • Iron Mountain
  • Netrality Data Centers
  • Novva Data Centers
  • PowerHouse Data Centers
  • Prime Data Centers
  • QTS Data Centers
  • RadiusDC
  • Sabey Data Centers
  • Skybox Datacenters
  • Stream Data Centers
  • Switch
  • T5 Data Centers
  • TierPoint
  • WhiteFiber
  • Yondr Group
  • 365 Data Centers
  • 5C Data Centers
  • Ada Infrastructure
  • Ardent Data Centers
  • Beacon Data Centers
  • Beale Infrastructure
  • Big Sky Digital Infrastructure
  • CleanArc Data Centers
  • CloudBurst Data Centers
  • Colovore
  • Crane Data Centers
  • Data District
  • Fleet Data Centers
  • Lambda
  • LightHouse Data Centers
  • Metroblocks
  • NE Edge
  • Penzance
  • Prometheus Hyperscale
  • Related digital
  • Rowan Digital Infrastructure
  • Tract

Methodology


Our research comprises a mix of primary and secondary research. The secondary research sources that are typically referred to include, but are not limited to, company websites, annual reports, financial reports, company pipeline charts, broker reports, investor presentations and SEC filings, journals and conferences, internal proprietary databases, news articles, press releases, and webcasts specific to the companies operating in any given market.

Primary research involves email interactions with the industry participants across major geographies. The participants who typically take part in such a process include, but are not limited to, CEOs, VPs, business development managers, market intelligence managers, and national sales managers. We primarily rely on internal research work and internal databases that we have populated over the years. We cross-verify our secondary research findings with the primary respondents participating in the study.



 

Loading
LOADING...

Table Information