+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)
New

Hong Kong Data Center Storage Market Size and Share - Growth Analysis Report and Forecast Trends (2026-2035)

  • PDF Icon

    Report

  • 128 Pages
  • November 2026
  • Region: Hong Kong
  • Expert Market Research
  • ID: 6296218
The Hong Kong data center storage market covers all-flash and hybrid arrays, software-defined storage, and backup and archive systems installed inside colocation, hyperscale, enterprise and telecom facilities in Hong Kong to hold, protect and serve data for finance, cloud, government and artificial intelligence workloads. Land and grid power are scarce, so buyers prize storage density per rack and per kilowatt.

In 2025, the market is valued at USD 780.00 million and is forecast to grow at a CAGR of 10.5%, reaching USD 2.11 billion by 2035. Growth is driven by hall openings such as Equinix HK6 in June 2026, a government-backed Sandy Ridge campus planned for 250,000 square meters of floor area, and rising artificial intelligence data needs.

Market Overview

The Hong Kong data center storage market is moving from steady replacement buying towards capacity-led expansion. New halls, hyperscale purchases and artificial intelligence projects are lifting demand for dense flash, scalable file and object storage and stronger cyber-recovery tools.

Three forces are shaping the market: new capacity, with SUNeVision planning to lift its Hong Kong power from 150MW towards 280MW; government-backed artificial intelligence compute, including a 3,000 PFLOPS Cyberport supercomputing centre; and tenant concentration, as hyperscale customers take large blocks of space and drive bulk storage orders.

In March 2026 the Hong Kong Government awarded the Sandy Ridge Data Facility Cluster site, and in June 2026 Equinix opened its sixth Hong Kong site. In September 2026 Grand Ming Group announced the sale of two data center projects for up to HK$2.445 billion.

Key Market Trends and Insights
  • New hall supply: Equinix opened HK6 in Tsuen Wan in June 2026 with 1,000 cabinets in the first phase, rising to 3,550 cabinets at full build-out.
  • Government-led compute: The Sandy Ridge campus, awarded in March 2026, targets 180,000 PFLOPS by 2032, about 36 times the current level, and will need very large data lakes.
  • Operator momentum: SUNeVision reported recurring data center revenue of HK$2,856 million for the year to June 2026, up 8%, with several campuses effectively full.
  • Hyperscale entry: Grand Ming Group announced in September 2026 the sale of two data center projects for up to HK$2.445 billion, with completion targeted for February 2027.
Hong Kong Data Center Storage Market Size and Forecast

The market is shifting from mixed-media arrays towards flash-first and software-defined designs that pack more capacity into each rack. Hybrid and hard disk arrays still lead in value, in our estimate, because bulk cloud and backup tiers favour low cost per terabyte, while software-defined storage advances fastest. Colocation remains the main buying channel, and hyperscale and cloud facilities gain share quickest. Financial services stay the largest user group, while information technology, telecom and cloud customers grow faster on artificial intelligence data. New Territories hosts the newest campuses and expands fastest.

Key Metrics
  • Market Size 2025: USD 780.00 million
  • Projected Market Size 2035: USD 2.11 billion
  • CAGR 2026 to 2035: 10.5%
  • Fastest-Growing Storage Type: Software-Defined Storage: 14.0% CAGR
  • Fastest-Growing Data Center Type: Hyperscale and Cloud Data Centers: 13.1% CAGR
  • Largest Revenue Segment 2025: Hybrid and Hard Disk Arrays
  • Dominant Region: New Territories
  • Highest CAGR by Region: New Territories: 11.6%
  • SUNeVision Hong Kong power capacity plan: 150MW to 280MW
  • Base Market Amount 2025: USD 780.00 million
Key Takeaways: Hong Kong Data Center Storage Market

Capacity Build-Out Anchors Long-Term Demand

Revenue is on course to expand by about 171% across the decade, from USD 780.00 million in 2025 to USD 2.11 billion in 2035 at a 10.5% CAGR. SUNeVision plans to lift Hong Kong capacity from 150MW towards 280MW, and Equinix opened HK6 in June 2026, so new halls will need storage on arrival.

Software-Defined and Hyperscale Segments Lead Growth

Hybrid and Hard Disk Arrays hold the largest share, but Software-Defined Storage grows at an estimated 14.0% CAGR and Hyperscale and Cloud Data Centers at an estimated 13.1% CAGR through 2035. Dell launched PowerStore Elite in May 2026 with up to 5.8PB of effective capacity in a 3U appliance.

Power Scarcity and Artificial Intelligence Reset Buying Criteria

Sandy Ridge is expected to start operating by 2029 or earlier, and buyers now weigh density, energy use and recovery speed alongside price. Storage choices increasingly follow these tests.
  • Cyberport's supercomputing centre offers 3,000 PFLOPS
  • Sandy Ridge targets 180,000 PFLOPS by 2032
  • SUNeVision's newest MEGA campus is due to add Phase Two in 2028
Hong Kong Data Center Storage Market Report Summary
  • Base Year: 2025
  • Historical Period: 2019 to 2025
  • Forecast Period: 2026 to 2035
  • Market Size 2025 (USD million): 780.00
  • Market Size 2035 (USD million): 2,116.98
  • CAGR 2026 to 2035: 10.5 %
  • CAGR by Storage Type: Software-Defined Storage: 14.0 %
  • CAGR by Data Center Type: Hyperscale and Cloud Data Centers: 13.1 %
  • CAGR by End User: IT, Telecom and Cloud Services: 12.3 %
  • CAGR by Region: New Territories: 11.6 %
  • Cyberport AI Supercomputing Centre Capacity (PFLOPS): 3000
  • SUNeVision Hong Kong Power Capacity Plan (Megawatt): 280
  • Market Share by Region 2025: New Territories (Dominant Share)
Key Insight

Demand is shifting towards flash-first and software-defined designs as new halls open and artificial intelligence data grows, while power limits favour dense systems. New Territories leads and grows fastest.

Key Trends in the Hong Kong Data Center Storage Market

The Hong Kong data center storage market is being reshaped by hyperscale site purchases, government-backed compute campuses, new carrier-neutral halls and liquid-cooled, high-density designs.

1. September 2026 - Grand Ming Group Announces Sale of Two Data Center Projects
  • Grand Ming Group announced on 18 September 2026 a sale of two data center development properties for a minimum of HK$2.179 billion, up to HK$2.445 billion.
  • Trade press named Amazon Data Services Hong Kong as buyer, with completion targeted for February 2027, and the first two phases of one property were handed over in December 2025.
  • Hyperscale ownership may pull bulk storage purchases into the local market.
2. September 2026 - Policy Address Sets Sandy Ridge Operation for 2029 or Earlier
  • The Policy Address of 16 September 2026 stated that the Sandy Ridge Data Facility Cluster is under construction and targeted to operate by 2029 or earlier.
  • Computing power at the site is projected to reach 180,000 PFLOPS by 2032, about 36 times the present level.
  • Such compute needs matching high-throughput file and object storage inside the campus, a clear opening for scale-out vendors.
3. June 2026 - Equinix Opens HK6 Liquid-Cooled Data Center in Tsuen Wan
  • Equinix opened HK6 on 16 June 2026 with an initial investment of USD 124 million and 1,000 cabinets, scaling to 3,550.
  • The site links to the Hong Kong-Shenzhen Innovation and Technology Park through Equinix Fabric for Greater Bay Area tenants.
  • Liquid cooling and dense racks raise the value of compact all-flash systems that save space and power.
4. March 2026 - Government Awards Sandy Ridge Site to Range Intelligent Computing
  • The Hong Kong Government announced on 2 March 2026 that Hong Kong Range Intelligent Computing Technology Company Limited won the site, over 110,000 square meters on a 50-year grant.
  • Planned gross floor area is 250,000 square meters, about 88% for high-tier data centers, with estimated investment of HK$23.8 billion.
  • Operations are expected within 42 months of award.
Key Insight

Hyperscale site purchases, government-backed compute campuses and liquid-cooled halls are the main structural forces, while grid access and land supply remain the main constraint on speed of deployment.

Recent Market Developments in the Hong Kong Data Center Storage Market

Recent developments, presented from the most recent, show operator results, storage product launches, a new telecom intelligence center and government support for artificial intelligence computing.

1. September 2026 - SUNeVision Reports Higher Data Center Revenue and New Campus Progress
  • SUNeVision announced on 1 September 2026 recurring data center and IT facilities revenue of HK$2,856 million for the year to June 2026, up 8%.
  • The newest MEGA campus has a Phase One of about 50MW, about 30% occupied and expected to reach about 70% on a single major customer commitment.
  • Phase Two of about 700,000 square feet is targeted for service in 2028, which supports storage demand through the middle of the forecast period.
2. May 2026 - Dell Launches PowerStore Elite With Up to 5.8PB in 3U
  • Dell announced PowerStore Elite on 19 May 2026 at Dell Technologies World, claiming up to 3x better performance and density.
  • A single 3U appliance offers up to 5.8PB of effective capacity, and Dell cites a 6:1 data reduction guarantee.
  • Density gains matter in Hong Kong, where floor space and power per rack are limited.
3. March 2026 - China Mobile Opens Global Intelligence Center in Fo Tan
  • China Mobile held the opening ceremony on 26 March 2026 for its Global Intelligence Center in Fo Tan, Sha Tin.
  • The company already runs data centers in Tseung Kwan O and Fo Tan.
  • Large-model training creates demand for fast shared file storage alongside long-term archives.
4. February 2026 - Budget Backs Cyberport AI Supercomputing and Subsidy Scheme
  • The 2026-27 Budget of 25 February 2026 was accompanied by Cyberport's statement that its supercomputing centre provides 3,000 PFLOPS.
  • The Artificial Intelligence Subsidy Scheme has approved about 30 research and development projects, including large language models and medical models.
  • Subsidised projects generate dataset storage demand.
Key Insight

Operator results, denser storage launches, a new intelligence center and supported artificial intelligence computing show suppliers positioning for flash-first and scale-out designs through the forecast period.

Hong Kong Data Center Storage Industry Segmentation

The Expert Market Research’s report on the Hong Kong Data Center Storage Market offers a detailed analysis of the market based on the following segments.

Market Breakup by Storage Type
  • All-Flash Arrays
  • Hybrid and Hard Disk Arrays
  • Software-Defined Storage
  • Backup and Archive Storage
  • Others
Hybrid and Hard Disk Arrays lead on value, in our estimate, because cloud tiers and backup pools favour low cost per terabyte. All-Flash Arrays grow at an estimated 13.0% CAGR through 2035, helped by Dell's PowerStore Elite of May 2026 with up to 5.8PB in 3U. Software-Defined Storage grows fastest at an estimated 14.0%, as hyperscale and artificial intelligence buyers favour scale-out designs on standard servers, including shared file systems for the Cyberport supercomputing centre of 3,000 PFLOPS. Backup and Archive Storage grows at 10.0% as Dell linked ransomware detection to its arrays in May 2026.

Market Breakup by Data Center Type
  • Colocation Data Centers
  • Hyperscale and Cloud Data Centers
  • Enterprise Data Centers
  • Edge and Telecom Data Centers
  • Others
Colocation Data Centers lead, in our estimate, with SUNeVision reporting in September 2026 that MEGA Plus, MEGA Two and MEGA Fanling were full or effectively full, and Equinix adding HK6 in June 2026. Hyperscale and Cloud Data Centers grow fastest at an estimated 13.1% CAGR through 2035, as Grand Ming Group agreed a sale of two projects to Amazon in September 2026. Enterprise Data Centers grow slowest at 6.2% as banks and public bodies move workloads to shared halls. Edge and Telecom Data Centers grow at 9.8%, anchored by China Mobile's Fo Tan intelligence center of March 2026.

Market Breakup by End User
  • Banking, Financial Services and Insurance
  • IT, Telecom and Cloud Services
  • Government and Public Sector
  • Healthcare, Media and Others
  • Others
Banking, Financial Services and Insurance lead, in our estimate, as Hong Kong's connectivity-dense campuses, such as SUNeVision's MEGA-i with about 15,000 cross-connects in September 2026, suit trading and payment firms. IT, Telecom and Cloud Services grow fastest at an estimated 12.3% CAGR through 2035, driven by the Sandy Ridge campus awarded in March 2026. Government and Public Sector grows at 10.8%, supported by the Artificial Intelligence Subsidy Scheme with about 30 approved projects in February 2026. Healthcare, Media and Others grow at 9.6% on medical model projects and growing video archives.

Market Breakup by Region
  • Kowloon
  • New Territories
  • Hong Kong Island
  • Others
New Territories dominates, in our estimate, and is also the fastest-growing region at an estimated 11.6% CAGR through 2035, with Equinix HK6 in Tsuen Wan from June 2026, MEGA Fanling, the Fanling projects sold in September 2026, China Mobile's Fo Tan center and the Sandy Ridge campus. Kowloon grows at 8.9%, supported by older industrial-building conversions close to financial and media users. Hong Kong Island grows at 8.2%, limited by land and power. Others, covering outlying islands, grow at 9.1%.

CAGR 2026 to 2035, Market by Region
  • Kowloon: 8.9 %
  • New Territories: 11.6 %
  • Hong Kong Island: 8.2 %
  • Others (incl. outlying islands): 9.1 %
Competitive Landscape in the Hong Kong Data Center Storage Market

Competition combines storage hardware vendors, facility operators that shape what buyers can deploy, and cloud providers building their own platforms. Entry barriers include power and floor-space access, channel reach among local integrators, certification for finance and public sector use, and support coverage.

SUNeVision Holdings

SUNeVision Holdings, headquartered in Hong Kong and the technology arm of Sun Hung Kai Properties, operates the MEGA campuses, including MEGA Plus, MEGA Two, MEGA Fanling, MEGA Gateway and MEGA-i. On 1 September 2026 it reported recurring data center revenue of HK$2,856 million for the year to June 2026, and said the newest MEGA campus, with a Phase One of about 50MW, should rise from about 30% to about 70% occupied, with Phase Two due in 2028.

Equinix

Equinix, headquartered in Redwood City, California, runs interconnection data centers in Hong Kong and opened its sixth site, HK6, in Tsuen Wan on 16 June 2026. The facility is liquid-cooled, with an initial investment of USD 124 million and 1,000 cabinets rising to 3,550, and links to the Hong Kong-Shenzhen Innovation and Technology Park.

Huawei

Huawei, headquartered in Shenzhen, sells OceanStor all-flash, data lake and OceanProtect backup systems, and its Hong Kong business covers enterprise and telecom customers. At a May 2026 forum it introduced the OceanStor A800 AI data platform and Pacific 9926 models offering 11PB in 2U, and said 122TB solid-state drives were available. It also said it shipped roughly 30EB globally in 2025.

Dell Technologies

Dell Technologies, headquartered in Round Rock, Texas, sells PowerStore, PowerScale, PowerMax and ObjectScale storage through its Hong Kong office. On 19 May 2026 it announced PowerStore Elite, offering up to 5.8PB of effective capacity in a 3U appliance and a 6:1 data reduction guarantee. Its Hong Kong blog published PowerScale pieces on AI data efficiency in January 2026.

Other players operating in the Hong Kong data center storage market include Range Intelligent Computing, China Mobile Hong Kong, Amazon Web Services, NetApp, and Digital Realty, alongside local integrators, regional cloud providers, independent data center operators and managed backup providers supplying storage to banks, telecom firms, public bodies and enterprises across Hong Kong.

Key Insight

Competition rests on density, power efficiency, channel reach and security credentials rather than price alone, while operator expansion and hyperscale entry could reshape positions across the coming years.

Frequently Asked Questions: Hong Kong Data Center Storage Market

What is the size of the Hong Kong data center storage market in 2025?

The Hong Kong data center storage market is valued at USD 780.00 million in 2025, supported by new data center halls, government-backed compute campuses, rising artificial intelligence data needs and a steady shift towards flash-first and software-defined storage, with New Territories as the largest region.

What is the forecast for the Hong Kong data center storage market by 2035?

The market is forecast to reach USD 2.11 billion by 2035, growing at a CAGR of 10.5 % over the 2026 to 2035 period, driven by capacity expansion in Tsuen Wan, Fanling and Sandy Ridge, hyperscale purchasing and the move from hybrid arrays towards dense, energy-efficient designs.

Which storage type has the highest CAGR in the Hong Kong data center storage market?

Software-Defined Storage records the highest CAGR at an estimated 14.0% through 2035, as hyperscale, cloud and artificial intelligence workloads favour scale-out designs on standard servers.

Which region dominates the Hong Kong data center storage market?

New Territories dominates, as Tsuen Wan, Fanling, Fo Tan and Sandy Ridge host the largest and newest campuses. It is also the fastest-growing region at an estimated 11.6% CAGR.

Who are the key players in the Hong Kong data center storage market?

Key players include SUNeVision Holdings, Equinix, Huawei, Dell Technologies, Range Intelligent Computing, China Mobile Hong Kong, Amazon Web Services, NetApp, and Digital Realty.

What is the Sandy Ridge Data Facility Cluster?

It is a government-backed data center campus in North District, awarded on 2 March 2026 to Hong Kong Range Intelligent Computing Technology Company Limited, with 250,000 square meters of planned floor area and operation targeted by 2029 or earlier.

What is SUNeVision's newest MEGA campus?

It is SUNeVision's large Hong Kong development. Phase One has about 50MW and was about 30% occupied in September 2026, while Phase Two of about 700,000 square feet is targeted for service in 2028.

Table of Contents

Executive Summary
  • Market Size 2025-2026
  • Market Growth 2026-2035
  • Key Demand Drivers
  • Key Players and Competitive Structure
  • Industry Best Practices
  • Recent Trends and Developments
  • Industry Outlook
Market Overview and Stakeholder Insights
  • Market Trends
  • Key Verticals
  • Key Regions
  • Supplier Power
  • Buyer Power
  • Key Market Opportunities and Risks
  • Key Initiatives by Stakeholders
Economic Summary
  • GDP Outlook
  • GDP Per Capita Growth
  • Inflation Trends
  • Democracy Index
  • Gross Public Debt Ratios
  • Balance of Payment (BoP) Position
  • Population Outlook
  • Urbanisation Trends
Country Risk Profiles
  • Country Risk
  • Business Climate
Hong Kong Data Center Storage Market Analysis
  • Key Industry Highlights
  • Hong Kong Data Center Storage Historical Market (2019-2025)
  • Hong Kong Data Center Storage Market Forecast (2026-2035)
Hong Kong Data Center Storage Market by Storage Type
  • All-Flash Arrays
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Hybrid and Hard Disk Arrays
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Software-Defined Storage
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Backup and Archive Storage
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
Hong Kong Data Center Storage Market by Data Center Type
  • Colocation Data Centers
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Hyperscale and Cloud Data Centers
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Enterprise Data Centers
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Edge and Telecom Data Centers
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
Hong Kong Data Center Storage Market by End User
  • Banking, Financial Services and Insurance
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • IT, Telecom and Cloud Services
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Government and Public Sector
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Healthcare, Media and Others
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
Hong Kong Data Center Storage Market by Region
  • Kowloon
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • New Territories
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Hong Kong Island
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Others
Market Dynamics
  • SWOT Analysis
  • Strengths
  • Weaknesses
  • Opportunities
  • Threats
  • Porter’s Five Forces Analysis
  • Supplier’s Power
  • Buyer’s Power
  • Threat of New Entrants
  • Degree of Rivalry
  • Threat of Substitutes
  • Key Indicators of Demand
  • Key Indicators of Price
Competitive Landscape
  • Supplier Selection
  • Key Hong Kong Players
  • Key Player Strategies
Company Profiles
  • SUNeVision Holdings
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Equinix
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Huawei
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Dell Technologies
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Range Intelligent Computing
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • China Mobile Hong Kong
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Amazon Web Services
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • NetApp
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Digital Realty
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Others
List of Key Figures and Tables
  • Hong Kong Data Center Storage Market: Key Industry Highlights, 2019 and 2035
  • Hong Kong Data Center Storage Historical Market: Breakup by Storage Type (USD million), 2019-2025
  • Hong Kong Data Center Storage Market Forecast: Breakup by Storage Type (USD million), 2026-2035
  • Hong Kong Data Center Storage Historical Market: Breakup by Data Center Type (USD million), 2019-2025
  • Hong Kong Data Center Storage Market Forecast: Breakup by Data Center Type (USD million), 2026-2035
  • Hong Kong Data Center Storage Historical Market: Breakup by End User (USD million), 2019-2025
  • Hong Kong Data Center Storage Market Forecast: Breakup by End User (USD million), 2026-2035
  • Hong Kong Data Center Storage Historical Market: Breakup by Region (USD million), 2019-2025
  • Hong Kong Data Center Storage Market Forecast: Breakup by Region (USD million), 2026-2035
  • Hong Kong Data Center Storage Market Supplier Selection
  • Hong Kong Data Center Storage Market Supplier Strategies

Companies Mentioned

  • SUNeVision Holdings
  • Equinix
  • Huawei
  • Dell Technologies
  • Range Intelligent Computing
  • China Mobile Hong Kong
  • Amazon Web Services
  • NetApp
  • Digital Realty