+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)
New

Norway Data Center Networking Market Size and Share - Growth Analysis Report and Forecast Trends (2026-2035)

  • PDF Icon

    Report

  • 103 Pages
  • November 2026
  • Region: Norway
  • Expert Market Research
  • ID: 6296777
The Norway data center networking market covers Ethernet switches, routers, optical interconnects, network software and automation, and the professional and managed services used to link servers, storage and accelerators inside data halls and to connect sites across the country. Norway is unusual because abundant hydropower and a cool climate attract colocation, sovereign cloud and large AI campuses far from the capital, so networks must span long fibre routes as well as dense leaf and spine fabrics.

In 2025, the market is valued at USD 285.00 million and is forecast to grow at a CAGR of 14.0%, reaching USD 1.05 billion by 2035. Growth is driven by 104 data centres on the telecoms regulator's register in March 2026, 794 MW of capacity in use in April 2026 and a build-out of AI clusters that needs 800 gigabit and faster fabrics.

Market Overview

The Norway data center networking market is expanding from a colocation base into AI infrastructure. Established operators in Oslo continue to refresh fabrics, while new campuses in the north and south order high-radix Ethernet switches, optics and interconnects for GPU clusters that did not exist in the country before 2025.

Three forces are shaping the market: power access, with 4,350 MW allocated to existing data centres in April 2026 and a further 6,833 MW waiting in the grid queue; sovereign and hyperscale AI demand, led by Stargate Norway and the Telenor AI Factory; and tighter regulation, as amended data centre rules took effect on 1 July 2026.

In July 2025 OpenAI, Aker and Nscale announced Stargate Norway near Narvik with about 100,000 NVIDIA GPUs targeted by the end of 2026. In June 2026 Nscale secured a further USD 790 million of committed financing, and in November 2025 Bulk Infrastructure raised EUR 410 million for its Kristiansand campus.

Key Market Trends and Insights
  • Registered data centre base: The telecoms regulator Nkom listed 104 registered data centres on 20 March 2026, of which 78 are standalone sites run by 55 operators.
  • Capacity already allocated: Statistics Norway reported in April 2026 that 4,350 MW is allocated to existing data centres, although only 794 MW is in use so far.
  • AI cluster demand: Stargate Norway, announced in July 2025, targets about 100,000 NVIDIA GPUs by the end of 2026 at the Kvandal site near Narvik.
  • Grid queue constraint: A further 6,833 MW sat in the Statnett connection queue in April 2026, so network orders follow power allocation rather than demand alone.
Norway Data Center Networking Market Size and Forecast

The market is moving from conventional 100 gigabit colocation fabrics towards 400 and 800 gigabit Ethernet designed for AI training and inference. Ethernet switches lead in value, while routers and optical interconnects advance fastest as sites multiply and distances grow. Colocation providers remain the largest buyers, yet AI and HPC operators grow quickest. Eastern Norway around Oslo stays the largest region, and Northern Norway grows quickest as Narvik-area campuses are fitted out. Registration duties, grid allocation rules and heat reuse point to a durable shift towards larger, better documented and more automated networks rather than a short investment cycle, even if power queues delay individual projects.

Key Metrics
  • Market Size 2025: USD 285.00 million
  • Projected Market Size 2035: USD 1.05 billion
  • CAGR 2026 to 2035: 14.0%
  • Fastest-Growing Component: Routers and Optical Interconnects: 16.5% CAGR
  • Fastest-Growing Data Rate: 1.6 TbE and Above: 28.0% CAGR
  • Largest Revenue Segment 2025: Ethernet Switches
  • Dominant Region: Eastern Norway (Oslo)
  • Highest CAGR by Region: Northern Norway: 19.0%
  • Data centres on the Nkom register, March 2026: 104 sites
  • Base Market Amount 2025: USD 285.00 million
Key Takeaways: Norway Data Center Networking Market

Power Allocation Sets the Pace of Network Orders

Revenue is on course to rise nearly fourfold across the decade, from USD 285.00 million in 2025 to USD 1.05 billion in 2035 at a 14.0% CAGR. With 4,350 MW allocated but only 794 MW in use in April 2026, installed capacity has long runway for fabric builds as energised halls are fitted out.

AI Clusters Pull Optics and Faster Ethernet Forward

Ethernet Switches hold the largest share, but Routers and Optical Interconnects grow at an estimated 16.5% CAGR and 1.6 TbE and Above at an estimated 28.0% through 2035. Cisco announced 102.4 Tbps switching silicon in February 2026, and AI and HPC Operators rise at an estimated 22.0% as Narvik and Oslo clusters scale.

Regulation and Sovereignty Reshape Buying Criteria

Amended rules from 1 July 2026 require operators to keep customer records and a physical representative in Norway, and sovereign AI offers keep data inside the country. Buyers now weigh documentation, automation and local support alongside raw port speed.
  • Telenor AI Factory runs on Skygard halls in Oslo, announced March 2026
  • Skygard bought two Oslo data centres in January 2026
  • Nscale added 115 MW of Narvik expansion financing in June 2026
Norway Data Center Networking Market Report Summary
  • Base Year: 2025
  • Historical Period: 2019 to 2025
  • Forecast Period: 2026 to 2035
  • Market Size 2025 (USD million): 285.00
  • Market Size 2035 (USD million): 1,056.56
  • CAGR 2026 to 2035: 14.0 %
  • CAGR by Component: Routers and Optical Interconnects: 16.5 %
  • CAGR by Data Rate: 1.6 TbE and Above: 28.0 %
  • CAGR by End User: AI and HPC Operators: 22.0 %
  • CAGR by Region: Northern Norway: 19.0 %
  • Registered Data Centres, March 2026 (Number): 104
  • Capacity In Use, April 2026 (Megawatts): 794
  • Market Share by Region 2025: Eastern Norway (Oslo) (Dominant Share)
Key Insight

Demand is shifting from conventional colocation fabrics towards high-speed Ethernet built for AI clusters, backed by hydropower. Eastern Norway leads, while Northern Norway grows fastest.

Key Trends in the Norway Data Center Networking Market

The Norway data center networking market is being reshaped by new registration duties, grid allocation limits, heat reuse projects and a growing register of operators.

1. July 2026 - Amended Energy Act and Data Centre Regulation Take Effect
  • Changes to the Norwegian Energy Act and the Data Centre Regulation took effect on 1 July 2026.
  • Operators must register the building owner, name a physical representative in Norway and keep customer and equipment location records current.
  • Documentation duties favour suppliers that offer inventory, telemetry and audit tooling in their management platforms.
2. April 2026 - Statistics Norway Reports 4,350 MW Allocated to Data Centres
  • Statistics Norway published its data centre analysis on 28 April 2026, with 794 MW in use against 4,350 MW allocated.
  • A further 6,833 MW was waiting in the Statnett connection queue, and data centres used about 2% of national electricity in 2025.
  • Network spending follows energised capacity, so projects with secured power are first in line for fabric orders.
3. March 2026 - Nkom Register Lists 104 Data Centres, Including One AI Site
  • Statistics Norway cited the Nkom register as of 20 March 2026, with 26 internal sites and 78 standalone sites run by 55 operators.
  • Of the standalone sites, 46 offer traditional commercial services, 8 focus on crypto mining and 1 is mainly for AI.
  • A fragmented base of small operators favours channel-led sales of compact switches and managed services.
4. February 2026 - Green Mountain and Hima Seafood Open Rjukan Heat Reuse Project
  • Green Mountain announced on 4 February 2026 that waste heat from its Rjukan data centre now supports land-based trout farming.
  • Norway's Minister of Digitalisation and Public Governance officiated at the opening.
  • Heat reuse raises the value of monitoring and automation, which supports demand for network software and telemetry.
Key Insight

Registration duties, grid allocation limits and heat reuse are shaping where and how networks are built, while connection queues remain the main constraint on capacity coming online.

Recent Market Developments in the Norway Data Center Networking Market

Recent developments, presented from the most recent, show large financings, sovereign AI factories, operator acquisitions and long-reach optical upgrades.

1. June 2026 - Nscale Secures USD 790 Million for Narvik Expansion
  • Nscale announced on 15 June 2026 an additional USD 790 million of committed financing, with a separate uncommitted accordion of the same size.
  • The lenders were ABN AMRO, DNB, Eksfin, Nordea and SEB, and the funds support a further 115 MW at the Narvik campus.
  • Each added megawatt of GPU capacity needs large scale-out fabrics, which favours 800 gigabit Ethernet and optics suppliers.
2. March 2026 - Telenor AI Factory and Red Hat Launch Sovereign Norway AI Platform
  • The two companies unveiled the collaboration at MWC 2026 on 3 March 2026, using Red Hat OpenShift AI on NVIDIA DGX H100 systems.
  • Compute runs in Skygard halls in Oslo, where the cluster will support up to 40 MW when complete.
  • Keeping customer data inside Norway ties networking demand to domestic data centres rather than foreign cloud regions.
3. January 2026 - Skygard Acquires Two Oslo Data Centres from Orange Business
  • Skygard bought the OSL3 and OSL5 sites in Oslo, reported on 12 January 2026, with terms undisclosed.
  • Skygard is owned by Telenor, Hafslund and HitecVision, and its OSL1 site in Hovinbyen is planned at 20 MW.
  • Consolidating older Oslo halls under one owner creates a refresh opportunity for switching vendors.
4. November 2025 - Bulk Infrastructure Raises EUR 410 Million for N01 Campus
  • Bulk Infrastructure announced the senior secured loan on 3 November 2025, with ABN Amro, Citibank Europe and Nordea as arrangers.
  • The funds cover continued expansion of the N01 campus and refinancing of existing debt.
  • A southern campus with carrier-neutral connectivity supports demand for routers, optical transport and interconnects.
Key Insight

Large financings, sovereign AI factories and operator acquisitions show buyers committing to high-speed fabrics and long-reach interconnects rather than waiting for demand to be proven.

Norway Data Center Networking Industry Segmentation

The Expert Market Research’s report on the Norway Data Center Networking Market offers a detailed analysis of the market based on the following segments.

Market Breakup by Component
  • Ethernet Switches
  • Routers and Optical Interconnects
  • Network Software and Automation
  • Professional and Managed Services
  • Others
Ethernet Switches lead on value, in our estimate, because every hall needs leaf, spine and management layers, as shown by Cisco's February 2026 launch of 102.4 Tbps switching silicon for AI clusters. Routers and Optical Interconnects grow fastest at an estimated 16.5% CAGR through 2035, helped by the 1.6 Tb/s single-channel transmission Telia Norge demonstrated with Ciena between Oslo and Trondheim, reported in February 2025. Network Software and Automation gains from the July 2026 documentation duties. Professional and Managed Services follow the pace of campus openings and acquisitions such as Skygard's January 2026 Oslo purchase.

Market Breakup by Data Rate
  • Up to 100 GbE
  • 200 GbE and 400 GbE
  • 800 GbE
  • 1.6 TbE and Above
  • Others
200 GbE and 400 GbE lead on value, in our estimate, as colocation and cloud halls in Oslo and Hamar standardise on these speeds for leaf-to-spine links. Up to 100 GbE remains in enterprise and public sector rooms and edge sites, but its share declines. 800 GbE is the scale-out choice for GPU clusters such as the NVIDIA-based Stargate Norway build announced in July 2025. 1.6 TbE and Above grows fastest at an estimated 28.0% CAGR through 2035 from a very small base, since Cisco announced 1.6T optics in February 2026 and the Narvik campus targets about 100,000 GPUs.

Market Breakup by End User
  • Colocation Providers
  • Hyperscale and Cloud Operators
  • AI and HPC Operators
  • Telecom Operators
  • Enterprise and Public Sector
  • Others
Colocation Providers lead, in our estimate, because 46 standalone commercial operators were on the Nkom register in March 2026 and Green Mountain runs large campuses at Hamar and Enebakk. Hyperscale and Cloud Operators grow steadily, with Google's Skien campus due to go live in 2026. AI and HPC Operators grow fastest at an estimated 22.0% CAGR through 2035, led by Nscale and the Telenor AI Factory. Telecom Operators invest in transport and edge, as Telia Norge did in its Ciena trial. Enterprise and Public Sector buyers move more slowly, with sovereign hosting rules supporting domestic demand.

Market Breakup by Region
  • Eastern Norway (Oslo)
  • Western Norway
  • Central Norway (Trondelag)
  • Northern Norway
  • Southern Norway
  • Others
Eastern Norway dominates, in our estimate, as Oslo hosts Skygard's Hovinbyen site, Orange's former OSL3 and OSL5 halls and Green Mountain's campuses, and it grows at an estimated 12.2% CAGR through 2035 from a large, mature base. Northern Norway is the fastest-growing region at an estimated 19.0%, led by Nscale's Narvik campus and the 250 MW site planned near Korgen in October 2025. Southern Norway grows at 15.6%, supported by Bulk's Kristiansand campus and Google's Skien project. Western Norway grows at 13.4%, helped by atNorth's Haugaland campus, and Central Norway at 14.2%. Others, covering Svalbard and offshore sites, grow at 10.5%.

CAGR 2026 to 2035, Market by Region
  • Eastern Norway (Oslo): 12.2 %
  • Western Norway: 13.4 %
  • Central Norway (Trondelag): 14.2 %
  • Northern Norway: 19.0 %
  • Southern Norway: 15.6 %
  • Others (incl. Svalbard and offshore sites): 10.5 %
Competitive Landscape in the Norway Data Center Networking Market

Competition combines global switching and optical vendors, AI infrastructure specialists and local integrators selling through colocation operators, telecoms groups and cloud builders. Entry barriers include switch silicon access, optics supply, cluster validation, security certification and local support reach.

Cisco Systems

Cisco Systems, headquartered in San Jose, California, supplies Nexus and Cisco 8000 data centre switches, routers, optics and fabric management software. At Cisco Live in Amsterdam on 10 February 2026 it announced the Silicon One G300, a 102.4 Tbps chip, with 1.6T optics and liquid-cooled systems for AI clusters, targeting the 800 gigabit and faster fabrics now specified in Norwegian campuses.

Arista Networks

Arista Networks, headquartered in Santa Clara, California, sells cloud and AI Ethernet switches and the EOS operating system to cloud, colocation and AI builders. On 5 May 2026 it reported first-quarter revenue of USD 2.709 billion, up 35.1% year on year. Its 400 and 800 gigabit platforms suit large GPU back-end networks, though its Norwegian project wins are not publicly itemised.

NVIDIA

NVIDIA, headquartered in Santa Clara, California, supplies GPUs together with Spectrum-X Ethernet and InfiniBand networking for AI factories. Stargate Norway, announced in July 2025, targets about 100,000 NVIDIA GPUs at Kvandal near Narvik by the end of 2026. In March 2026 Telenor AI Factory said it offers NVIDIA H100 GPUs in DGX H100 systems, hosted in Skygard halls in Oslo with a cluster of up to 40 MW.

Ciena

Ciena, headquartered in Hanover, Maryland, makes optical transport and coherent modules that link data centres across long distances. Telia Norge and Ciena reported 1.6 Tb/s over a single channel on a 656 km Oslo to Trondheim route using WaveLogic 6 Extreme, a Nordic first, in coverage dated February 2025. Such links connect Oslo colocation hubs with Trondelag and northern AI campuses, supporting demand for optical interconnects.

Other players operating in the Norway data center networking market include Nokia, Juniper Networks, Dell Technologies, Extreme Networks, and Broadcom, alongside local integrators, managed network providers, cabling and optics distributors and telecom carriers supplying connectivity to colocation, cloud and AI campuses across Norway.

Key Insight

Competition turns on switch silicon, optics supply, cluster validation and local integrator support, while hyperscale and AI buyers increasingly specify networking at the design stage.

Frequently Asked Questions: Norway Data Center Networking Market

What is the size of the Norway data center networking market in 2025?

The Norway data center networking market is valued at USD 285.00 million in 2025, supported by hydropower-backed colocation growth, sovereign and hyperscale AI clusters, a large grid allocation for data centres and a steady shift towards 400 and 800 gigabit Ethernet, with Eastern Norway as the largest region.

What is the forecast for the Norway data center networking market by 2035?

The market is forecast to reach USD 1.05 billion by 2035, growing at a CAGR of 14.0 % over the 2026 to 2035 period, driven by AI campus build-outs in northern and southern Norway, power allocation to existing sites, fabric refreshes in Oslo and stricter data centre documentation rules.

Which component has the highest CAGR in the Norway data center networking market?

Routers and Optical Interconnects record the highest CAGR among components at an estimated 16.5% through 2035, as multi-site campuses, long-reach transport and 1.6T optics raise demand for interconnect capacity.

Which region dominates the Norway data center networking market?

Eastern Norway (Oslo) dominates, as it hosts the densest cluster of colocation halls and Skygard's Oslo sites. Northern Norway is the fastest-growing region at an estimated 19.0% CAGR, led by the Narvik AI campus.

Who are the key players in the Norway data center networking market?

Key players include Cisco Systems, Arista Networks, NVIDIA, Ciena, Nokia, Juniper Networks, Dell Technologies, Extreme Networks, and Broadcom.

What is Stargate Norway?

Stargate Norway is an AI data centre at Kvandal near Narvik, announced in July 2025 by OpenAI, Aker and Nscale. It targets about 100,000 NVIDIA GPUs by the end of 2026 on renewable hydropower.

What changed in Norwegian data centre regulation in 2026?

Changes to the Energy Act and the Data Centre Regulation took effect on 1 July 2026. Operators must name a physical representative in Norway and keep customer and equipment location records accessible to authorities.

Table of Contents

Executive Summary
  • Market Size 2025-2026
  • Market Growth 2026-2035
  • Key Demand Drivers
  • Key Players and Competitive Structure
  • Industry Best Practices
  • Recent Trends and Developments
  • Industry Outlook
Market Overview and Stakeholder Insights
  • Market Trends
  • Key Verticals
  • Key Regions
  • Supplier Power
  • Buyer Power
  • Key Market Opportunities and Risks
  • Key Initiatives by Stakeholders
Economic Summary
  • GDP Outlook
  • GDP Per Capita Growth
  • Inflation Trends
  • Democracy Index
  • Gross Public Debt Ratios
  • Balance of Payment (BoP) Position
  • Population Outlook
  • Urbanisation Trends
Country Risk Profiles
  • Country Risk
  • Business Climate
Norway Data Center Networking Market Analysis
  • Key Industry Highlights
  • Norway Data Center Networking Historical Market (2019-2025)
  • Norway Data Center Networking Market Forecast (2026-2035)
Norway Data Center Networking Market by Component
  • Ethernet Switches
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Routers and Optical Interconnects
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Network Software and Automation
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Professional and Managed Services
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
Norway Data Center Networking Market by Data Rate
  • Up to 100 GbE
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • 200 GbE and 400 GbE
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • 800 GbE
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • 1.6 TbE and Above
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
Norway Data Center Networking Market by End User
  • Colocation Providers
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Hyperscale and Cloud Operators
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • AI and HPC Operators
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Telecom Operators
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Enterprise and Public Sector
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
Norway Data Center Networking Market by Region
  • Eastern Norway (Oslo)
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Western Norway
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Central Norway (Trondelag)
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Northern Norway
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Southern Norway
  • Historical Trend (2019-2025)
  • Forecast Trend (2026-2035)
  • Others
Market Dynamics
  • SWOT Analysis
  • Strengths
  • Weaknesses
  • Opportunities
  • Threats
  • Porter’s Five Forces Analysis
  • Supplier’s Power
  • Buyer’s Power
  • Threat of New Entrants
  • Degree of Rivalry
  • Threat of Substitutes
  • Key Indicators of Demand
  • Key Indicators of Price
Competitive Landscape
  • Supplier Selection
  • Key Norway Players
  • Key Player Strategies
Company Profiles
  • Cisco Systems
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Arista Networks
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • NVIDIA
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Ciena
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Nokia
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Juniper Networks
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Dell Technologies
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Extreme Networks
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Broadcom
  • Company Overview
  • Product Portfolio
  • Demographic Reach and Achievements
  • Certifications
  • Others
List of Key Figures and Tables
  • Norway Data Center Networking Market: Key Industry Highlights, 2019 and 2035
  • Norway Data Center Networking Historical Market: Breakup by Component (USD million), 2019-2025
  • Norway Data Center Networking Market Forecast: Breakup by Component (USD million), 2026-2035
  • Norway Data Center Networking Historical Market: Breakup by Data Rate (USD million), 2019-2025
  • Norway Data Center Networking Market Forecast: Breakup by Data Rate (USD million), 2026-2035
  • Norway Data Center Networking Historical Market: Breakup by End User (USD million), 2019-2025
  • Norway Data Center Networking Market Forecast: Breakup by End User (USD million), 2026-2035
  • Norway Data Center Networking Historical Market: Breakup by Region (USD million), 2019-2025
  • Norway Data Center Networking Market Forecast: Breakup by Region (USD million), 2026-2035
  • Norway Data Center Networking Market Supplier Selection
  • Norway Data Center Networking Market Supplier Strategies

Companies Mentioned

  • Cisco Systems
  • Arista Networks
  • NVIDIA
  • Ciena
  • Nokia
  • Juniper Networks
  • Dell Technologies
  • Extreme Networks
  • Broadcom