In 2025, the market is valued at USD 300.00 million and is forecast to grow at a CAGR of 22.0%, reaching USD 2.19 billion by 2035. Growth is driven by 279 MW of installed data center capacity in April 2026, a further 205 MW under construction, cloud region launches and the arrival of AI campuses sized above 100 MW.
Market Overview
The Mexico hyperscale data center market is moving from cloud regions towards purpose-built AI campuses. Capacity is still small against Brazil, yet announced projects are large, and the limiting factor has shifted from land and capital to electricity.
Three forces are shaping the market: nearshoring and data residency rules that keep workloads in-country; generative AI, which pushes campuses from tens to hundreds of megawatts; and grid access, since more than 60% of the transmission network runs near maximum capacity according to MEXDC in June 2026.
In February 2026 ODATA energized the first 72 MW building of its QR03 campus. In September 2026 the Federal Electricity Commission and MEXDC agreed a weekly planning scheme, and in October 2026 CloudHQ lifted its Querétaro plan to nearly USD 6 billion.
Key Market Trends and Insights
- Installed base: MEXDC reported installed data center capacity of 279 MW in April 2026, with another 205 MW under construction, so the sector is roughly doubling its footprint within a few years.
- Power requirement: The Federal Electricity Commission and MEXDC said in September 2026 that the sector will need about 1.73 GW by 2031, roughly six times what can be supplied today.
- Geographic concentration: Querétaro holds 72% of existing capacity, followed by the Mexico City area at 10% and Nuevo León at 9%, according to MEXDC in June 2026.
- Investment outlook: MEXDC projects USD 82.5 billion of data center construction and equipment spending from 2026 to 2031, supported by about 98,366 construction jobs.
The market is shifting from enterprise colocation towards hyperscale wholesale leasing and build-to-suit campuses designed for dense graphics processor racks. Wholesale colocation leads in value because operators with grid connections already serve cloud customers, while build-to-suit and powered shell structures advance fastest as developers pre-secure substations. Cloud services remain the largest workload, yet artificial intelligence and high-performance computing grow quickest as GPU clusters arrive. Facilities above 100 MW grow fastest from a small base, while mid-sized buildings carry most current revenue. Bajio remains the largest region on the strength of Querétaro, and Northern Mexico grows quickest as Nuevo León and Durango attract new projects. Power planning, self-supply generation and campus-scale substations point to a lasting structural build-out rather than a short cycle.
Key Metrics
- Market Size 2025: USD 300.00 million
- Projected Market Size 2035: USD 2.19 billion
- CAGR 2026 to 2035: 22.0%
- Fastest-Growing Deployment Model: Build-to-Suit and Powered Shell: 26.0% CAGR
- Fastest-Growing Workload: AI and High-Performance Computing: 29.0% CAGR
- Largest Revenue Segment 2025: Wholesale Colocation
- Dominant Region: Bajio
- Highest CAGR by Region: Northern Mexico: 24.5%
- Installed data center capacity, April 2026: 279 MW
- Base Market Amount 2025: USD 300.00 million
Campus-Scale Projects Drive a Sevenfold Revenue Expansion
Revenue is on course to rise from USD 300.00 million in 2025 to USD 2.19 billion in 2035 at a 22.0% CAGR. Installed capacity of 279 MW in April 2026 and 205 MW under construction supply the first leg, with campuses such as ODATA's QR03 and CloudHQ's Querétaro site supplying the rest.
AI Workloads and Build-to-Suit Structures Lead Growth
Wholesale Colocation holds the largest share, but Build-to-Suit and Powered Shell grows at an estimated 26.0% CAGR and AI and High-Performance Computing at an estimated 29.0% CAGR through 2035. CloudHQ's October 2026 plan for close to 1,000 MW of power and a USD 1 billion green AI project in Nuevo León announced in November 2025 show where growth is heading.
Electricity Access Decides Where Capacity Is Built
MEXDC says about 1.7 GW of extra power is needed for announced projects, and operators are using self-supply generation and dedicated substations while the grid catches up.
- The Federal Electricity Commission and MEXDC agreed weekly technical planning in September 2026
- Amazon Data Services MX filed for 15 MW of temporary diesel generation near Querétaro in November 2025
- About USD 340 million of electrical works in El Bajio has been stuck in procedures, MEXDC said in May 2026
- Base Year: 2025
- Historical Period: 2019 to 2025
- Forecast Period: 2026 to 2035
- Market Size 2025 (USD million): 300.00
- Market Size 2035 (USD million): 2,191.39
- CAGR 2026 to 2035: 22.0 %
- CAGR by Deployment Model: Build-to-Suit and Powered Shell: 26.0 %
- CAGR by Workload: AI and High-Performance Computing: 29.0 %
- CAGR by Facility Size: Above 100 MW: 27.5 %
- CAGR by Region: Northern Mexico: 24.5 %
- Installed Capacity April 2026 (Megawatts): 279
- Capacity Under Construction 2026 (Megawatts): 205
- Market Share by Region 2025: Bajio (Dominant Share)
Hyperscale demand is shifting from cloud regions to AI campuses as power access becomes the gating factor. Bajio leads, while Northern Mexico grows fastest on border proximity and new projects.
Key Trends in the Mexico Hyperscale Data Center Market
The Mexico hyperscale data center market is being reshaped by campus-scale expansions, formal grid planning, operator investment pledges and a national spending outlook.
1. October 2026 - CloudHQ Raises Querétaro Campus Investment to Nearly USD 6 Billion
- Trade press reported on 13 October 2026 that CloudHQ lifted its planned investment from USD 4.8 billion to nearly USD 6 billion for six facilities.
- Planned power capacity rises from 250 MW to close to 1,000 MW, with CloudHQ covering the cost of the grid expansion.
- The change shows developers funding their own power infrastructure to secure delivery dates.
- Trade press reported in September 2026 that the Federal Electricity Commission and MEXDC will hold weekly technical meetings on new projects.
- MEXDC will share consolidated project data so generation, transmission, distribution and storage can be planned together with CENACE.
- A structured channel may shorten connection timelines, which MEXDC estimates at about five years from permit to operation.
- At a ceremony in Querétaro on 13 August 2026, KIO said cumulative investment passed USD 900 million.
- It completed phases two and three of QRO2 for USD 170 million and is weighing a QRO3 of about 100 MW, worth up to USD 1.3 billion.
- More than 90% of its energy comes from renewable sources, which supports hyperscale tenants with sustainability targets.
- MEXDC said in June 2026 that construction and equipment spending could reach USD 82.5 billion from 2026 to 2031.
- It expects 98,366 construction jobs and 35,430 operations jobs, and says AI-scale operations need above 250 MW.
- More than 60% of the transmission network runs near maximum capacity, with bottlenecks in Bajio, Nuevo León and northern border states.
Developers are funding their own substations, the utility is formalizing grid planning with the industry, and spending outlooks keep rising, while transmission congestion remains the main constraint on delivery timelines.
Recent Market Developments in the Mexico Hyperscale Data Center Market
Recent developments, presented from the most recent, show new northern investment, an AI-scale campus entering service, generation workarounds and a border-state power-and-compute project.
1. October 2026 - Nuevo León Announces USD 600 Million Data Center Investment
- Governor Samuel García announced on 7 October 2026 a USD 600 million investment centred on data center infrastructure in Apodaca and Pesquería.
- The investor was not disclosed, and no capacity figure was given.
- The announcement adds to the northern pipeline, where Nuevo León holds about 9% of existing capacity.
- Trade press reported on 23 February 2026 that the first QR03 building offers 72 MW of IT power for cloud and AI workloads.
- The campus is valued above USD 3 billion and is planned at up to 300 MW across five buildings.
- The first phase energized 200 MW of electrical infrastructure, with expansion to 400 MW planned.
- Trade press reported on 20 November 2025 an investment of 340 million pesos in six Rolls-Royce generators totalling 15 MW.
- The temporary systems at industrial parks in Colón and El Marqués are designed to run continuously for one year during construction.
- The filing shows hyperscalers bridging grid delays with self-supply power while the region is built out.
- Fermaca announced on 20 March 2025 a USD 2.7 billion Digital City in the city of Durango, designed for 250 MW.
- The package includes a 350 MW combined-cycle plant, a gas pipeline from Texas and more than 190 strands of dark fiber to Querétaro.
- It is the clearest attempt to pair generation with hyperscale capacity in northern Mexico.
New northern announcements, an AI-scale campus entering service and self-supply generation show operators positioning for large clusters while working around grid delays through the forecast period.
Mexico Hyperscale Data Center Industry Segmentation
The Expert Market Research’s report on the Mexico Hyperscale Data Center Market offers a detailed analysis of the market based on the following segments.
Market Breakup by Deployment Model
- Wholesale Colocation
- Hyperscaler-Owned Cloud Regions
- Build-to-Suit and Powered Shell
- Others
Market Breakup by Workload
- Cloud Services
- AI and High-Performance Computing
- Content and Digital Platforms
- Others
Market Breakup by Facility Size
- Up to 20 MW
- 20 MW to 50 MW
- 50 MW to 100 MW
- Above 100 MW
- Others
Market Breakup by Region
- Central Mexico
- Northern Mexico
- Bajio
- Southern and Southeast Mexico
- Others
CAGR 2026 to 2035, Market by Region
- Central Mexico: 19.5 %
- Northern Mexico: 24.5 %
- Bajio: 21.5 %
- Southern and Southeast Mexico: 20.5 %
- Others (incl. Jalisco and Western Mexico): 22.5 %
Competition combines specialist developers, regional colocation operators, global interconnection platforms and hyperscalers that build their own regions. Entry barriers include energized land, substation access, tenant relationships, financing for campuses worth billions and permitting timelines of about five years.
ODATA
ODATA, a subsidiary of Aligned Data Centers headquartered in Plano, Texas, operates hyperscale campuses in Mexico, including QR02 and QR03 in Querétaro and QR04 in San Miguel de Allende. In February 2026 the first QR03 building entered service with 72 MW of IT power, within a campus planned at up to 300 MW and valued above USD 3 billion. Aligned agreed to an investor-group acquisition in October 2025.
CloudHQ
CloudHQ, headquartered in Washington, D.C., develops hyperscale campuses and is building a six-facility campus near Querétaro airport. In September 2025 it announced USD 4.8 billion for the project, with a substation of up to 900 MW built with the Federal Electricity Commission and CENACE. Trade press reported in October 2026 that the investment had risen to nearly USD 6 billion, with power capacity close to 1,000 MW.
KIO Data Centers
KIO Data Centers, a Mexican operator with a Mexico City base and sites across Latin America, runs the QRO2 mega campus in Querétaro. At a ceremony on 13 August 2026 it reported over USD 900 million of cumulative investment, USD 170 million for QRO2 phases two and three, and more than USD 200 million of new commitments for Mexico City, Monterrey and Querétaro. QRO3 would add about 100 MW if approved.
Equinix
Equinix, headquartered in Redwood City, California, operates the MX1 and MX2 data centers in Querétaro and the MO2 facility in Apodaca, Nuevo León, which cost USD 250 million. In March 2025 it said it planned to invest USD 400 million in Mexico over two years. Its Mexico operations head said in 2026 that power availability, not construction, is the main constraint on new capacity.
Other players operating in the Mexico hyperscale data center market include Amazon Web Services, Microsoft, Google Cloud, Telmex, and Grupo Fermaca, alongside regional colocation operators, utility-scale power developers, construction contractors and fiber providers supplying capacity, connectivity and energy to cloud tenants across Mexico.
Key Insight
Competition rests on energized land, substation access, tenant relationships and financing capacity rather than price alone, while self-built cloud regions and powered developers reshape how capacity is supplied.
Frequently Asked Questions: Mexico Hyperscale Data Center Market
What is the size of the Mexico hyperscale data center market in 2025?
The Mexico hyperscale data center market is valued at USD 300.00 million in 2025, supported by cloud region launches, artificial intelligence campuses and nearshoring, with Bajio as the largest region.
What is the forecast for the Mexico hyperscale data center market by 2035?
The market is forecast to reach USD 2.19 billion by 2035, growing at a CAGR of 22.0 % over the 2026 to 2035 period, driven by data residency rules, AI-scale campuses, self-supply power projects and formal grid planning between the utility and the industry.
Which workload has the highest CAGR in the Mexico hyperscale data center market?
AI and High-Performance Computing records the highest CAGR at an estimated 29.0% through 2035, as graphics processor clusters need campuses above 100 MW and dense power.
Which region dominates the Mexico hyperscale data center market?
Bajio dominates, as Querétaro holds 72% of existing capacity according to MEXDC in June 2026. Northern Mexico is the fastest-growing region at an estimated 24.5% CAGR, helped by Nuevo León and Durango projects.
Who are the key players in the Mexico hyperscale data center market?
Key players include ODATA, CloudHQ, KIO Data Centers, Equinix, Amazon Web Services, Microsoft, Google Cloud, Telmex, and Grupo Fermaca.
What is a hyperscale data center?
A hyperscale data center is a very large facility, usually tens to hundreds of megawatts, built for cloud providers and AI clusters. MEXDC says AI-scale operations in Mexico need above 250 MW.
Why is electricity the main constraint on Mexico data centers?
MEXDC says about 1.7 GW is needed for announced projects, and more than 60% of the transmission network runs near maximum capacity. In September 2026 the Federal Electricity Commission agreed weekly planning with the industry.