Key Market Trends and Insights
- The Northern and Central Region dominated the Saudi Arabia Data Center Construction market in 2025, holding 48.2% of market share through Riyadh's established ICT ecosystem, concentration of government institutions requiring sovereign cloud infrastructure, and the largest single-city concentration of hyperscaler and colocation data center construction projects in the Kingdom.
- By Data Center Type, Colocation held 56.40% revenue share in 2025 while Self-Built Hyperscalers are projected to grow at the fastest CAGR of 31.75% over the 2026 to 2035 forecast period, driven by AWS, Microsoft, Google Cloud, and Oracle constructing dedicated AI-optimised cloud infrastructure within Saudi Arabia to serve the Kingdom's cloud sovereignty requirements and AI workload demand.
- By Infrastructure, Electrical Infrastructure power-backup systems held 52.90% of the construction spending in 2025, while power-distribution solutions are forecast to grow at 31.12% CAGR. Mechanical Infrastructure cooling systems represented 41.30% of mechanical spending in 2025, as extreme Saudi climate conditions require significant investment in advanced liquid and adiabatic cooling solutions.
- Market Size in 2025: USD 1.61 Billion
- Projected Market Size in 2035: USD 18.5 Billion
- CAGR from 2026 to 2035: 22.0%
- Fastest-Growing Data Center Type: Self-Built Hyperscalers (31.75% CAGR, AI cloud infrastructure build-out)
Market growth is also driven by the National Data Center Strategy targeting 1.5 GW of total IT load capacity by 2030 and NDMO data sovereignty regulations. Government agency data localization requirements generate USD 450 million or more in annual data center demand, creating a stable public sector construction pipeline independent of hyperscaler commercial investment decisions that provides the market's resilient demand baseline.
Key Takeaways
- AWS, Microsoft, Google Cloud, and Oracle have collectively committed over USD 15 billion to Saudi infrastructure between 2023 and 2027, making Saudi Arabia the single largest hyperscaler capital commitment destination in the Middle East and among the highest globally per capita.
- The Saudi National Data Center Strategy targets 1.5 GW of IT load capacity by 2030, implying roughly tripling of current capacity from a starting base of approximately 0.41 thousand MW in 2025, across hyperscale, colocation, and sovereign cloud infrastructure construction projects.
- Cooling system investment represents 41.30 percent of mechanical infrastructure construction spending in 2025, reflecting the critical technical challenge of operating high-density AI compute infrastructure in Saudi Arabia's extreme climate where cooling accounts for over 40 percent of operational costs.
- Base Year: 2025
- Historical Period: 2019-2025
- Forecast Period: 2026-2035
- Market Size 2025: USD 1.61 Billion
- Market Size 2035: USD 18.5 Billion
- CAGR 2026-2035: 22.0%
- Largest Data Center Type: Colocation (56.40% share in 2025)
- Fastest-Growing Type: Self-Built Hyperscalers (31.75% CAGR, AI cloud build-out)
Four forces are reshaping Saudi Arabia's data center construction market through 2035: hyperscaler AI infrastructure commitments totalling USD 15 billion-plus, sovereign cloud data localisation driving government construction, net-zero sustainability mandates shaping construction design, and extreme-climate liquid cooling adoption at AI-dense facilities.
1. Extreme-Climate Liquid Cooling Adoption at AI Data Centres Drives Mechanical Construction Spend (April 2025)
AI-optimised data centers are driving liquid cooling and immersion cooling adoption to handle GPU heat loads in an ambient climate where summer temperatures exceed 45 degrees Celsius. Conventional air cooling cannot manage the combination of high outdoor temperatures and rack densities above 30 kW per rack. Schneider Electric AI-ready cooling, Vertiv liquid cooling systems, and modular prefabricated assemblies with integrated liquid cooling are the fastest-growing mechanical infrastructure specification in Saudi data center builds.
2. Data Sovereignty Requirements Create Sovereign Cloud Infrastructure Construction Demand (March 2025)
The NDMO data sovereignty regulations require government agencies and regulated entities in financial services, healthcare, and telecoms to host data in Saudi-domiciled facilities. This creates a mandatory sovereign cloud construction pipeline as agencies migrate workloads to NDMO-compliant Saudi data centers. Sovereign cloud demand is determined by regulatory mandate rather than commercial economics, providing a resilient baseline procurement layer for vendors including Schneider Electric, Vertiv, Eaton, and Siemens.
3. Net-Zero Construction Mandates Drive Sustainable Data Center Design Across Saudi AI Campuses (February 2025)
Vision 2030 renewable energy targets and NEOM's sustainability framework are driving net-zero construction design at new hyperscale campuses embedded within Vision 2030 projects. DataVolt's NEOM partnership targets the region's first net-zero AI factory campus, incorporating renewable energy supply, liquid cooling, circular economy materials, and PUE targets below 1.3. Saudi Arabia's world-competitive solar economics make on-site renewable PPAs financially viable at the land areas available within Vision 2030 development zones.
4. USD 15 Billion Hyperscaler AI Infrastructure Commitments Reshape Data Center Construction Scale (January 2025)
Hyperscaler capital commitments have transformed Saudi Arabia's data center construction from a regional colocation business to a global AI infrastructure build-out. AWS committed USD 5.3 billion, Microsoft completed three sites for its Saudi Arabia East region, Google announced a USD 10 billion PIF partnership, and Oracle launched a Riyadh cloud region under its USD 1.5 billion commitment. Each hyperscaler facility requires high-power electrical distribution at 50-100 MW per data hall, advanced liquid cooling, and structures housing GPU racks at 30 to 100 kW per rack.
Recent Developments in Saudi Arabia Data Center Construction Market
1. Khazna Data Centers Expands Saudi Arabia Operations With AI-Optimised Colocation Facility (May 2025)
Khazna Data Centers expanded its Saudi Arabia colocation operations in May 2025 with a new AI-optimised facility targeting cloud providers, financial institutions, and enterprises requiring Tier 3 and Tier 4 colocation with liquid cooling for GPU workloads. The Saudi expansion positions Khazna alongside DataVolt and center3 as a leading domestic colocation operator serving Vision 2030 digital economy participants.
2. Schneider Electric Expands AI-Ready Data Center Solutions Across Multiple Saudi Arabia MoUs (April 2025)
Schneider Electric advanced its AI-ready data center solutions portfolio in Saudi Arabia in April 2025, following its Motivair liquid cooling technology acquisition, signing multiple MoUs with Saudi partners for digital transformation, energy management, and sustainable data center infrastructure. The company's AI-ready EcoStruxure data center platform, integrating advanced cooling, modular power distribution, and AI-powered infrastructure management, positions it as the primary electrical and mechanical infrastructure vendor for Saudi Arabia's net-zero AI data center construction pipeline.
3. AWS Announces USD 5.3 Billion Investment to Launch Saudi Arabia Cloud Region in 2026 (March 2025)
Amazon Web Services announced on March 20, 2025 that it would launch the Saudi Arabia cloud region in 2026, backed by USD 5.3 billion in investment representing one of the largest single-country hyperscaler commitments in the Middle East. The investment will fund the construction and equipping of multiple Availability Zones within Saudi Arabia, providing the physical data center infrastructure for AWS cloud, AI, and sovereign cloud services for Saudi government agencies, enterprises, and regional customers requiring in-Kingdom data residency.
4. DataVolt and NEOM Sign USD 5 Billion Agreement for Net-Zero AI Factory Campus in Oxagon (February 2025)
DataVolt and NEOM signed a landmark agreement on February 10, 2025 to develop the region's first truly sustainable net-zero AI factory campus in NEOM's Oxagon industrial and innovation hub in northwest Saudi Arabia. The project is backed by an initial USD 5 billion investment and targets 1.5 GW total capacity, incorporating total liquid cooling, 100 percent renewable energy supply, and circular economy construction principles. The campus will serve hyperscalers, cloud service providers, and AI model developers requiring low-carbon AI compute infrastructure.
5. DataVolt Secures MODON Land Lease for AI-Ready Data Center in Riyadh First Technology Park (February 2025)
DataVolt secured a land lease agreement with MODON, the Saudi Authority for Industrial Cities and Technology Zones, in February 2025 to develop an AI-ready data center on a 55,000 square metre plot within the First Technology Park in eastern Riyadh. The facility will support advanced AI processing for hyperscalers, cloud service providers, and enterprise clients, incorporating energy-efficient cooling systems and AI-optimised power infrastructure within Saudi Arabia's primary industrial and technology zone.
Saudi Arabia Data Center Construction Industry Segmentation
The report "Saudi Arabia Data Center Construction Market Report and Forecast 2026-2035" offers a detailed analysis based on the following segments:
Market Breakup by Tier Type
- Tier 1 and 2
- Tier 3
- Tier 4
Market Breakup by Data Center Type
- Colocation
- Self-Built Hyperscalers (CSPs)
- Enterprise
- Edge
Market Breakup by Infrastructure
- Electrical Infrastructure
- Mechanical Infrastructure
Saudi Arabia Data Center Construction Market Share
Colocation holds 56.40 percent market share through carrier-neutral facilities serving cloud providers, enterprises, and telecoms from shared infrastructure. center3, Gulf Data Hub, and DataVolt are the primary operators driving construction activity, with Riyadh and Jeddah as the two primary cluster locations based on submarine cable connectivity and proximity to the Kingdom's largest enterprise client concentrations.
Self-Built Hyperscaler construction is the fastest-growing segment as AWS, Microsoft, Google, and Oracle construct dedicated Saudi Arabia cloud region facilities at the power density and cooling specifications required for AI model training. Each project encompasses multiple data halls across separate Availability Zones with 18 to 36 month construction timelines, generating sustained Schneider Electric, Vertiv, Eaton, and Caterpillar procurement across multi-year builds.
Supporting data is drawn from DataVolt-NEOM agreement announcement, AWS Saudi Arabia investment disclosure of March 20, 2025, Schneider Electric Saudi MoU communications, Khazna Data Centers expansion announcements, National Data Center Strategy capacity targets, and CST registered data center market capacity data.
Competitive Landscape
Saudi Arabia's data center construction market is growing rapidly, drawing global infrastructure vendors alongside domestic specialists. Schneider Electric, Vertiv, Eaton, Siemens, and Caterpillar compete for electrical and mechanical infrastructure contracts at hyperscaler campuses and colocation facilities.
Huawei Technologies Co., Ltd. (China)
Huawei competes through modular data center solutions, prefabricated buildings, and data center management software for Saudi telecom and enterprise clients. Its modular construction capability addresses the rapid deployment timelines that Vision 2030 digital infrastructure projects demand.
Schneider Electric SE (France)
Schneider Electric competes through EcoStruxure data center infrastructure, APC UPS and power distribution, and Motivair liquid cooling for high-density AI racks. Its April 2025 Saudi Arabia MoU signings and AI-ready cooling solutions position it as the primary electrical and mechanical infrastructure vendor for the Kingdom's net-zero AI data center construction pipeline.
DataVolt (Saudi Arabia)
DataVolt is one of Saudi Arabia's most active domestic data center developers with two major 2025 projects: the USD 5 billion net-zero NEOM Oxagon AI campus and the Riyadh First Technology Park data center under MODON lease. Its sustainability-first design and Saudi track record position it as the Kingdom's leading domestic hyperscale developer.
Vertiv Holdings Co. (US)
Vertiv competes through thermal management, UPS, and power distribution solutions for data centers, with its liquid cooling platforms addressing the extreme ambient temperature challenge at Saudi AI data centers. Its modular containerised cooling and precision air systems serve both hyperscale new-build and existing facility retrofit projects across the Kingdom.
Other key players in the Saudi Arabia Data Center Construction market report include Caterpillar Inc., Khazna Data Centers, Eaton Corporation plc, Cummins Inc., and Siemens AG.
Key Highlights of the Saudi Arabia Data Center Construction Market Report
- Comprehensive analysis spanning 2019 to 2035 across tier type, data center type, and electrical and mechanical infrastructure in the Saudi Arabia data center construction market
- Assessment of DataVolt-NEOM USD 5 billion Oxagon net-zero campus, DataVolt Riyadh MODON data center, AWS USD 5.3 billion Saudi region investment, Schneider Electric MoU programme, and Khazna Data Centers expansion
- Analysis of USD 15 billion-plus hyperscaler AI infrastructure commitments, 1.5 GW national data center capacity target by 2030, sovereign cloud data localisation, and liquid cooling adoption at extreme-climate AI facilities
- Competitive profiles of Huawei, Schneider Electric, DataVolt, and Vertiv alongside Caterpillar, Khazna Data Centers, Eaton, Cummins, and Siemens in the Saudi Arabia data center construction market
Why Choose This Market Research?
- Trusted by data center construction contractors, electrical and mechanical infrastructure vendors, colocation and hyperscale data center operators, and digital infrastructure investors for accurate Saudi Arabia market intelligence.
- Authored by analysts with expertise in Saudi Arabia Vision 2030 data sovereignty regulations, hyperscaler AI infrastructure construction specifications, net-zero data center design, and liquid cooling adoption in extreme-climate environments.
- Findings designed for data center project planning, infrastructure vendor positioning, hyperscaler partnership strategy, sovereign cloud procurement targeting, and investment underwriting in Saudi Arabia's data center construction market.
Table of Contents
Companies Mentioned
- Huawei Technologies Co., Ltd. (China)
- Schneider Electric SE (France)
- Caterpillar Inc. (US)
- DataVolt (Saudi Arabia)
- Khazna Data Centers (Saudi Arabia)
- Eaton Corporation plc (Ireland)
- Vertiv Holdings Co. (US)
- Cummins Inc. (US)
- Siemens AG (Germany)

