+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

PRINTER FRIENDLY

Data Center Construction Market: Global Industry Trends, Share, Size, Growth, Opportunity and Forecast 2022-2027

  • PDF Icon

    Report

  • 146 Pages
  • February 2022
  • Region: Global
  • IMARC Group
  • ID: 5547182

FEATURED COMPANIES

  • AECOM
  • DPR construction Inc.
  • Eaton Corporation Inc.
  • Fujitsu Limited
  • Legrand SA
  • Rittal GmbH & Co. KG
The global data center construction market reached a value of US$ 47.2 Billion in 2021. Looking forward, the publisher expects the market to reach US$ 75.3 Billion by 2027, exhibiting a CAGR of 9% during 2022-2027. Keeping in mind the uncertainties of COVID-19, we are continuously tracking and evaluating the direct as well as the indirect influence of the pandemic on different end use industries. These insights are included in the report as a major market contributor.

Data center construction refers to the collective process of physically constructing a data center facility. The primary focus is on designing and building a data center with the required capacity, disaster tolerance systems and efficient design to perform all the necessary functions. The infrastructure usually consists of backup power supplies, data communication connections, security devices and air conditioning and fire suppression systems. This ensures that all the resources are optimally utilized, and all the environmental factors are taken into consideration.

Significant growth in the IT industry is one of the key factors creating a positive outlook for the market. The rising penetration of connected devices and convenient access to the Internet have increased the demand for data storage systems across the globe. Furthermore, widespread utilization of big data analytics, cloud-based systems and the Internet of Things (IoT) for computing videos, audio and other formats of data is also driving the market growth. Large data centers are increasingly being constructed across various sectors for enhancing computing ability, memory, networking infrastructure and storage resources. Additionally, increasing emphasis on the construction of green data centers is acting as another growth-inducing factor. Green data centers use low-emission building materials that aid in creating sustainable ecosystems and ensure efficient waste recycling. Other factors, including the increasing adoption of liquid cooling technology and direct-to-chip cooling server racks to prevent overheating in data centers, along with extensive infrastructural developments, are expected to drive the market further.

Key Market Segmentation:

The publisher provides an analysis of the key trends in each sub-segment of the global data center construction market, along with forecasts at the global, regional and country level from 2022-2027. Our report has categorized the market based on construction type, data center type, tier standards and vertical.

Breakup by Construction Type:

  • Electrical Construction
  • UPS
  • Rack PDU (Power Distribution Unit)
  • Generators
  • Transfer Switches and Switchgears
  • Others
  • Mechanical Construction
  • Cooling Systems
  • Racks
  • Others

Breakup by Data Center Type:

  • Mid-Size Data Centers
  • Enterprise Data Centers
  • Large Data Centers

Breakup by Tier Standards:

  • Tier I & II
  • Tier III
  • Tier IV

Breakup by Vertical:

  • Public Sector
  • Oil & Energy
  • Media & Entertainment
  • IT & Telecommunication
  • Banking, Financial Services and Insurance (BFSI)
  • Healthcare
  • Retail
  • Others

Breakup by Region:

  • North America
  • United States
  • Canada
  • Asia Pacific
  • China
  • Japan
  • India
  • South Korea
  • Australia
  • Indonesia
  • Others
  • Europe
  • Germany
  • France
  • United Kingdom
  • Italy
  • Spain
  • Russia
  • Others
  • Latin America
  • Brazil
  • Mexico
  • Others
  • Middle East and Africa
  • Turkey
  • Saudi Arabia
  • Others

Competitive Landscape:

The competitive landscape of the industry has also been examined with some of the key players being AECOM, DPR construction Inc., Eaton Corporation Inc., Fujitsu Limited, Holder Construction Company, Legrand SA, Rittal GmbH & Co. KG, Schneider Electric SE, Tripp Lite, Turner Construction and Vertiv Group Corporation.

Key Questions Answered in this Report

1. What is the size of the global data center construction market?
2. What is the expected growth rate of the global data center construction market?
3. What are the key factors driving the global data center construction market?
4. What has been the impact of COVID-19 on the global data center construction market?
5. What is the breakup of the global data center construction market based on the tier standards?
6. What is the breakup of the global data center construction market based on the vertical?
7. What are the key regions in the global data center construction market?
8. Who are the key companies/players in the global data center construction market?
Frequently Asked Questions about the Global Data Center Construction Market

What is the estimated value of the Global Data Center Construction Market?

The Global Data Center Construction Market was estimated to be valued at $47.2 Billion in 2021.

What is the growth rate of the Global Data Center Construction Market?

The growth rate of the Global Data Center Construction Market is 8.1%, with an estimated value of $75.3 Billion by 2027.

What is the forecasted size of the Global Data Center Construction Market?

The Global Data Center Construction Market is estimated to be worth $75.3 Billion by 2027.

Who are the key companies in the Global Data Center Construction Market?

Key companies in the Global Data Center Construction Market include AECOM, DPR construction Inc., Eaton Corporation Inc., Fujitsu Limited, Holder Construction Company, Legrand SA, Rittal GmbH & Co. KG, Schneider Electric SE and Turner Construction.

FEATURED COMPANIES

  • AECOM
  • DPR construction Inc.
  • Eaton Corporation Inc.
  • Fujitsu Limited
  • Legrand SA
  • Rittal GmbH & Co. KG

1 Preface
2 Scope and Methodology
2.1 Objectives of the Study
2.2 Stakeholders
2.3 Data Sources
2.3.1 Primary Sources
2.3.2 Secondary Sources
2.4 Market Estimation
2.4.1 Bottom-Up Approach
2.4.2 Top-Down Approach
2.5 Forecasting Methodology
3 Executive Summary
4 Introduction
4.1 Overview
4.2 Key Industry Trends
5 Global Data Center Construction Market
5.1 Market Overview
5.2 Market Performance
5.3 Impact of COVID-19
5.4 Market Forecast
6 Market Breakup by Construction Type
6.1 Electrical Construction
6.1.1 Market Trends
6.1.2 Market Breakup by Component Type
6.1.3 Market Forecast
6.2 Mechanical Construction
6.2.1 Market Trends
6.2.2 Market Breakup by Component Type
6.2.3 Market Forecast
7 Market Breakup by Data Center Type
7.1 Mid-Size Data Centers
7.1.1 Market Trends
7.1.2 Market Forecast
7.2 Enterprise Data Centers
7.2.1 Market Trends
7.2.2 Market Forecast
7.3 Large Data Centers
7.3.1 Market Trends
7.3.2 Market Forecast
8 Market Breakup by Tier Standards
8.1 Tier I & II
8.1.1 Market Trends
8.1.2 Market Forecast
8.2 Tier III
8.2.1 Market Trends
8.2.2 Market Forecast
8.3 Tier IV
8.3.1 Market Trends
8.3.2 Market Forecast
9 Market Breakup by Vertical
9.1 Public Sector
9.1.1 Market Trends
9.1.2 Market Forecast
9.2 Oil & Energy
9.2.1 Market Trends
9.2.2 Market Forecast
9.3 Media & Entertainment
9.3.1 Market Trends
9.3.2 Market Forecast
9.4 IT & Telecommunication
9.4.1 Market Trends
9.4.2 Market Forecast
9.5 Banking, Financial Services and Insurance (BFSI)
9.5.1 Market Trends
9.5.2 Market Forecast
9.6 Healthcare
9.6.1 Market Trends
9.6.2 Market Forecast
9.7 Retail
9.7.1 Market Trends
9.7.2 Market Forecast
9.8 Others
9.8.1 Market Trends
9.8.2 Market Forecast
10 Market Breakup by Region
10.1 North America
10.1.1 United States
10.1.1.1 Market Trends
10.1.1.2 Market Forecast
10.1.2 Canada
10.1.2.1 Market Trends
10.1.2.2 Market Forecast
10.2 Asia Pacific
10.2.1 China
10.2.1.1 Market Trends
10.2.1.2 Market Forecast
10.2.2 Japan
10.2.2.1 Market Trends
10.2.2.2 Market Forecast
10.2.3 India
10.2.3.1 Market Trends
10.2.3.2 Market Forecast
10.2.4 South Korea
10.2.4.1 Market Trends
10.2.4.2 Market Forecast
10.2.5 Australia
10.2.5.1 Market Trends
10.2.5.2 Market Forecast
10.2.6 Indonesia
10.2.6.1 Market Trends
10.2.6.2 Market Forecast
10.2.7 Others
10.2.7.1 Market Trends
10.2.7.2 Market Forecast
10.3 Europe
10.3.1 Germany
10.3.1.1 Market Trends
10.3.1.2 Market Forecast
10.3.2 France
10.3.2.1 Market Trends
10.3.2.2 Market Forecast
10.3.3 United Kingdom
10.3.3.1 Market Trends
10.3.3.2 Market Forecast
10.3.4 Italy
10.3.4.1 Market Trends
10.3.4.2 Market Forecast
10.3.5 Spain
10.3.5.1 Market Trends
10.3.5.2 Market Forecast
10.3.6 Russia
10.3.6.1 Market Trends
10.3.6.2 Market Forecast
10.3.7 Others
10.3.7.1 Market Trends
10.3.7.2 Market Forecast
10.4 Latin America
10.4.1 Brazil
10.4.1.1 Market Trends
10.4.1.2 Market Forecast
10.4.2 Mexico
10.4.2.1 Market Trends
10.4.2.2 Market Forecast
10.4.3 Others
10.4.3.1 Market Trends
10.4.3.2 Market Forecast
10.5 Middle East and Africa
10.5.1 Turkey
10.5.1.1 Market Trends
10.5.1.2 Market Forecast
10.5.2 Saudi Arabia
10.5.2.1 Market Trends
10.5.2.2 Market Forecast
10.5.3 Others
10.5.3.1 Market Trends
10.5.3.2 Market Forecast
11 SWOT Analysis
11.1 Overview
11.2 Strengths
11.3 Weaknesses
11.4 Opportunities
11.5 Threats
12 Value Chain Analysis
13 Porters Five Forces Analysis
13.1 Overview
13.2 Bargaining Power of Buyers
13.3 Bargaining Power of Suppliers
13.4 Degree of Competition
13.5 Threat of New Entrants
13.6 Threat of Substitutes
14 Price Analysis
15 Competitive Landscape
15.1 Market Structure
15.2 Key Players
15.3 Profiles of Key Players
15.3.1 AECOM
15.3.1.1 Company Overview
15.3.1.2 Product Portfolio
15.3.1.3 Financials
15.3.1.4 SWOT Analysis
15.3.2 DPR construction Inc.
15.3.2.1 Company Overview
15.3.2.2 Product Portfolio
15.3.2.3 SWOT Analysis
15.3.3 Eaton Corporation Inc.
15.3.3.1 Company Overview
15.3.3.2 Product Portfolio
15.3.4 Fujitsu Limited
15.3.4.1 Company Overview
15.3.4.2 Product Portfolio
15.3.5 Holder Construction Company
15.3.5.1 Company Overview
15.3.5.2 Product Portfolio
15.3.6 Legrand SA
15.3.6.1 Company Overview
15.3.6.2 Product Portfolio
15.3.7 Rittal GmbH & Co. KG
15.3.7.1 Company Overview
15.3.7.2 Product Portfolio
15.3.8 Schneider Electric SE
15.3.8.1 Company Overview
15.3.8.2 Product Portfolio
15.3.8.3 Financials
15.3.9 Tripp Lite
15.3.9.1 Company Overview
15.3.9.2 Product Portfolio
15.3.10 Turner Construction
15.3.10.1 Company Overview
15.3.10.2 Product Portfolio
15.3.11 Vertiv Group Corporation
15.3.11.1 Company Overview
15.3.11.2 Product Portfolio
List of Figures
Figure 1: Global: Data Center Construction Market: Major Drivers and Challenges
Figure 2: Global: Data Center Construction Market: Sales Value (in Billion US$), 2016-2021
Figure 3: Global: Data Center Construction Market Forecast: Sales Value (in Billion US$), 2022-2027
Figure 4: Global: Data Center Construction Market: Breakup by Construction Type (in %), 2021
Figure 5: Global: Data Center Construction Market: Breakup by Data Center Type (in %), 2021
Figure 6: Global: Data Center Construction Market: Breakup by Tier Standards (in %), 2021
Figure 7: Global: Data Center Construction Market: Breakup by Vertical (in %), 2021
Figure 8: Global: Data Center Construction Market: Breakup by Region (in %), 2021
Figure 9: Global: Data Center Construction (Electrical Construction) Market: Sales Value (in Million US$), 2016 & 2021
Figure 10: Global: Data Center Construction Market (Electrical Construction): Breakup by Component Type (in %), 2021
Figure 11: Global: Data Center Construction (Electrical Construction) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 12: Global: Data Center Construction (Mechanical Construction) Market: Sales Value (in Million US$), 2016 & 2021
Figure 13: Global: Data Center Construction Market (Mechanical Construction): Breakup by Component Type (in %), 2021
Figure 14: Global: Data Center Construction (Mechanical Construction) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 15: Global: Data Center Construction (Mid-Size Data Centers) Market: Sales Value (in Million US$), 2016 & 2021
Figure 16: Global: Data Center Construction (Mid-Size Data Centers) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 17: Global: Data Center Construction (Enterprise Data Centers) Market: Sales Value (in Million US$), 2016 & 2021
Figure 18: Global: Data Center Construction (Enterprise Data Centers) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 19: Global: Data Center Construction (Large Data Centers) Market: Sales Value (in Million US$), 2016 & 2021
Figure 20: Global: Data Center Construction (Large Data Centers) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 21: Global: Data Center Construction (Tier I & II) Market: Sales Value (in Million US$), 2016 & 2021
Figure 22: Global: Data Center Construction (Tier I & II) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 23: Global: Data Center Construction (Tier III) Market: Sales Value (in Million US$), 2016 & 2021
Figure 24: Global: Data Center Construction (Tier III) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 25: Global: Data Center Construction (Tier IV) Market: Sales Value (in Million US$), 2016 & 2021
Figure 26: Global: Data Center Construction (Tier IV) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 27: Global: Data Center Construction (Public Sector) Market: Sales Value (in Million US$), 2016 & 2021
Figure 28: Global: Data Center Construction (Public Sector) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 29: Global: Data Center Construction (Oil & Energy) Market: Sales Value (in Million US$), 2016 & 2021
Figure 30: Global: Data Center Construction (Oil & Energy) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 31: Global: Data Center Construction (Media & Entertainment) Market: Sales Value (in Million US$), 2016 & 2021
Figure 32: Global: Data Center Construction (Media & Entertainment) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 33: Global: Data Center Construction (IT & Telecommunication) Market: Sales Value (in Million US$), 2016 & 2021
Figure 34: Global: Data Center Construction (IT & Telecommunication) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 35: Global: Data Center Construction (Banking, Financial Services, Insurance-BFSI) Market: Sales Value (in Million US$), 2016 & 2021
Figure 36: Global: Data Center Construction (Banking, Financial Services, Insurance-BFSI) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 37: Global: Data Center Construction (Healthcare) Market: Sales Value (in Million US$), 2016 & 2021
Figure 38: Global: Data Center Construction (Healthcare) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 39: Global: Data Center Construction (Retail) Market: Sales Value (in Million US$), 2016 & 2021
Figure 40: Global: Data Center Construction (Retail) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 41: Global: Data Center Construction (Other Verticals) Market: Sales Value (in Million US$), 2016 & 2021
Figure 42: Global: Data Center Construction (Other Verticals) Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 43: North America: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 44: North America: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 45: United States: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 46: United States: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 47: Canada: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 48: Canada: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 49: Asia Pacific: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 50: Asia Pacific: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 51: China: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 52: China: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 53: Japan: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 54: Japan: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 55: India: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 56: India: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 57: South Korea: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 58: South Korea: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 59: Australia: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 60: Australia: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 61: Indonesia: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 62: Indonesia: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 63: Others: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 64: Others: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 65: Europe: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 66: Europe: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 67: Germany: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 68: Germany: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 69: France: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 70: France: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 71: United Kingdom: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 72: United Kingdom: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 73: Italy: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 74: Italy: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 75: Spain: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 76: Spain: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 77: Russia: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 78: Russia: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 79: Others: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 80: Others: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 81: Latin America: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 82: Latin America: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 83: Brazil: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 84: Brazil: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 85: Mexico: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 86: Mexico: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 87: Others: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 88: Others: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 89: Middle East and Africa: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 90: Middle East and Africa: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 91: Turkey: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 92: Turkey: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 93: Saudi Arabia: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 94: Saudi Arabia: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 95: Others: Data Center Construction Market: Sales Value (in Million US$), 2016 & 2021
Figure 96: Others: Data Center Construction Market Forecast: Sales Value (in Million US$), 2022-2027
Figure 97: Global: Data Center Construction Industry: SWOT Analysis
Figure 98: Global: Data Center Construction Industry: Value Chain Analysis
Figure 99: Global: Data Center Construction Industry: Porter’s Five Forces Analysis
List of Tables
Table 1: Global: Data Center Construction Market: Key Industry Highlights, 2021 and 2027
Table 2: Global: Data Center Construction Market Forecast: Breakup by Construction Type (in Million US$), 2022-2027
Table 3: Global: Data Center Construction Market Forecast: Breakup by Data Center Type (in Million US$), 2022-2027
Table 4: Global: Data Center Construction Market Forecast: Breakup by Tier Standards (in Million US$), 2022-2027
Table 5: Global: Data Center Construction Market Forecast: Breakup by Vertical (in Million US$), 2022-2027
Table 6: Global: Data Center Construction Market Forecast: Breakup by Region (in Million US$), 2022-2027
Table 7: Global: Data Center Construction Market: Competitive Structure
Table 8: Global: Data Center Construction Market: Key Players
  • AECOM
  • DPR construction Inc.
  • Eaton Corporation Inc.
  • Fujitsu Limited
  • Holder Construction Company
  • Legrand SA
  • Rittal GmbH & Co. KG
  • Schneider Electric SE
  • Tripp Lite
  • Turner Construction
  • Vertiv Group Corporation.

Loading
LOADING...