+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

Data Center Construction Market in the US 2026-2030

  • PDF Icon

    Report

  • 196 Pages
  • August 2026
  • Region: United States
  • TechNavio
  • ID: 5949795
1h Free Analyst Time
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

The data center construction market in the US is forecasted to grow by USD 13.19 billion during 2025-2030, accelerating at a CAGR of 9.6% during the forecast period. The report on the data center construction market in the US provides a holistic analysis, market size and forecast, trends, growth drivers, and challenges, as well as vendor analysis covering around 25 vendors.

The report offers an up-to-date analysis regarding the current market scenario, the latest trends and drivers, and the overall market environment. The market is driven by generative ai cluster growth drives infrastructure investments, adoption of high-density liquid cooling drives mechanical upgrade, private infrastructure partnerships expand power capacity.

The study was conducted using an objective combination of primary and secondary information including inputs from key participants in the industry. The report contains a comprehensive market size data, segment with regional analysis and vendor landscape in addition to an analysis of the key companies. Reports have historic and forecast data.

The data center construction market in the US is segmented as below:

By Application

  • Enterprises
  • Cloud
  • Colocation
  • Hyperscale

By End-User

  • IT and telecom
  • BFSI
  • Government and defense
  • Others

By Type

  • Electrical infrastructure
  • Mechanical infrastructure
  • Networking infrastructure
  • Others

By Region

  • North America
  • US
This study identifies the migration to secondary industrial submarkets lowers utility interconnection costs as one of the prime reasons driving the data center construction market in the US growth during the next few years. Also, standardized prefabricated modular data centers simplify deployment and growing deployment of dedicated on-site behind-the-meter power generation will lead to sizable demand in the market.

The report on the data center construction market in the US covers the following areas:

  • Data center construction market in the US sizing
  • Data center construction market in the US forecast
  • Data center construction market in the US industry analysis
A robust vendor analysis within the report is designed to help clients improve their market position, and in line with this, this report provides a detailed analysis of several leading data center construction market in the US vendors that include AECOM, Arup Group Ltd., Balfour Beatty US, Black and Veatch Holding Co., Brasfield and Gorrie LLC, Clark Construction Group, CORGAN, DPR Construction, Fluor Corp., Gensler. M. Arthur Gensler Jr., Gilbane Inc., Hensel Phelps, HITT Contracting Inc., Hoffman Construction Co., Holder Construction Group LLC, J.E. Dunn Construction Co., Jacobs Solutions Inc., M. A. Mortenson Co., McCarthy Building Companies, Page Southerland Page Inc. Also, the data center construction market in the US analysis report includes information on upcoming trends and challenges that will influence market growth. This is to help companies strategize and leverage all forthcoming growth opportunities.

The report presents a detailed picture of the market by the way of study, synthesis, and summation of data from multiple sources by an analysis of key parameters such as profit, pricing, competition, and promotions. It presents various market facets by identifying the key industry influencers. The data presented is comprehensive, reliable, and a result of extensive primary and secondary research. The market research reports provide a complete competitive landscape and an in-depth vendor selection methodology and analysis using qualitative and quantitative research to forecast accurate market growth.

Table of Contents

1 Executive Summary
1.1 Market overview
  • Executive Summary - Chart on Market Overview
  • Executive Summary - Data Table on Market Overview
  • Executive Summary - Chart on Country Market Characteristics
  • Executive Summary - Chart on Market Segmentation by Application
  • Executive Summary - Chart on Market Segmentation by End-user
  • Executive Summary - Chart on Market Segmentation by Type
  • Executive Summary - Chart on Company Market Positioning
2 Market Analysis
2.1 Analysis of price sensitivity, lifecycle, customer purchase basket, adoption rates, and purchase criteria
  • Analysis of price sensitivity, lifecycle, customer purchase basket, adoption rates, and purchase criteria
2.2 Criticality of inputs and Factors of differentiation
  • Overview on criticality of inputs and factors of differentiation
2.3 Factors of disruption
  • Overview on factors of disruption
2.4 Impact of drivers and challenges
  • Impact of drivers and challenges in 2025 and 2030
3 Market Landscape
3.1 Market ecosystem
  • Chart on Parent Market
  • Data Table on - Parent Market
3.2 Market characteristics
  • Chart on Market characteristics analysis
3.3 Value chain analysis
  • Chart on Value chain analysis
4 Market Sizing
4.1 Market definition
  • Data Table on Offerings of companies included in the market definition
4.2 Market segment analysis
  • Market segments
4.3 Market size 2025
4.4 Market outlook: Forecast for 2025-2030
  • Chart on US - Market size and forecast 2025-2030 ($ million)
  • Data Table on US - Market size and forecast 2025-2030 ($ million)
  • Chart on US: Year-over-year growth 2025-2030 (%)
  • Data Table on US: Year-over-year growth 2025-2030 (%)
5 Historic Market Size
5.1 Data Center Construction Market in US 2020 - 2024
  • Historic Market Size - Data Table on Data Center Construction Market in US 2020 - 2024 ($ million)
5.2 Application segment analysis 2020 - 2024
  • Historic Market Size - Application Segment 2020 - 2024 ($ million)
5.3 End-user segment analysis 2020 - 2024
  • Historic Market Size - End-user Segment 2020 - 2024 ($ million)
5.4 Type segment analysis 2020 - 2024
  • Historic Market Size - Type Segment 2020 - 2024 ($ million)
6 Qualitative Analysis
6.1 Impact of AI on data center construction market in US
6.2 Impact of geopolitical conflicts on data center construction market in US
7 Five Forces Analysis
7.1 Five forces summary
  • Five forces analysis - Comparison between 2025 and 2030
7.2 Bargaining power of buyers
  • Bargaining power of buyers - Impact of key factors 2025 and 2030
7.3 Bargaining power of suppliers
  • Bargaining power of suppliers - Impact of key factors in 2025 and 2030
7.4 Threat of new entrants
  • Threat of new entrants - Impact of key factors in 2025 and 2030
7.5 Threat of substitutes
  • Threat of substitutes - Impact of key factors in 2025 and 2030
7.6 Threat of rivalry
  • Threat of rivalry - Impact of key factors in 2025 and 2030
7.7 Market condition
  • Chart on Market condition - Five forces 2025 and 2030
8 Market Segmentation by Application
8.1 Market segments
  • Chart on Application - Market share 2025-2030 (%)
  • Data Table on Application - Market share 2025-2030 (%)
8.2 Comparison by Application
  • Chart on Comparison by Application
  • Data Table on Comparison by Application
8.3 Enterprises - Market size and forecast 2025-2030
  • Chart on Enterprises - Market size and forecast 2025-2030 ($ million)
  • Data Table on Enterprises - Market size and forecast 2025-2030 ($ million)
  • Chart on Enterprises - Year-over-year growth 2025-2030 (%)
  • Data Table on Enterprises - Year-over-year growth 2025-2030 (%)
8.4 Cloud - Market size and forecast 2025-2030
  • Chart on Cloud - Market size and forecast 2025-2030 ($ million)
  • Data Table on Cloud - Market size and forecast 2025-2030 ($ million)
  • Chart on Cloud - Year-over-year growth 2025-2030 (%)
  • Data Table on Cloud - Year-over-year growth 2025-2030 (%)
8.5 Colocation - Market size and forecast 2025-2030
  • Chart on Colocation - Market size and forecast 2025-2030 ($ million)
  • Data Table on Colocation - Market size and forecast 2025-2030 ($ million)
  • Chart on Colocation - Year-over-year growth 2025-2030 (%)
  • Data Table on Colocation - Year-over-year growth 2025-2030 (%)
8.6 Hyperscale - Market size and forecast 2025-2030
  • Chart on Hyperscale - Market size and forecast 2025-2030 ($ million)
  • Data Table on Hyperscale - Market size and forecast 2025-2030 ($ million)
  • Chart on Hyperscale - Year-over-year growth 2025-2030 (%)
  • Data Table on Hyperscale - Year-over-year growth 2025-2030 (%)
8.7 Market opportunity by Application
  • Market opportunity by Application ($ million)
  • Data Table on Market opportunity by Application ($ million)
9 Market Segmentation by End-user
9.1 Market segments
  • Chart on End-user - Market share 2025-2030 (%)
  • Data Table on End-user - Market share 2025-2030 (%)
9.2 Comparison by End-user
  • Chart on Comparison by End-user
  • Data Table on Comparison by End-user
9.3 IT and telecom - Market size and forecast 2025-2030
  • Chart on IT and telecom - Market size and forecast 2025-2030 ($ million)
  • Data Table on IT and telecom - Market size and forecast 2025-2030 ($ million)
  • Chart on IT and telecom - Year-over-year growth 2025-2030 (%)
  • Data Table on IT and telecom - Year-over-year growth 2025-2030 (%)
9.4 BFSI - Market size and forecast 2025-2030
  • Chart on BFSI - Market size and forecast 2025-2030 ($ million)
  • Data Table on BFSI - Market size and forecast 2025-2030 ($ million)
  • Chart on BFSI - Year-over-year growth 2025-2030 (%)
  • Data Table on BFSI - Year-over-year growth 2025-2030 (%)
9.5 Government and defense - Market size and forecast 2025-2030
  • Chart on Government and defense - Market size and forecast 2025-2030 ($ million)
  • Data Table on Government and defense - Market size and forecast 2025-2030 ($ million)
  • Chart on Government and defense - Year-over-year growth 2025-2030 (%)
  • Data Table on Government and defense - Year-over-year growth 2025-2030 (%)
9.6 Others - Market size and forecast 2025-2030
  • Chart on Others - Market size and forecast 2025-2030 ($ million)
  • Data Table on Others - Market size and forecast 2025-2030 ($ million)
  • Chart on Others - Year-over-year growth 2025-2030 (%)
  • Data Table on Others - Year-over-year growth 2025-2030 (%)
9.7 Market opportunity by End-user
  • Market opportunity by End-user ($ million)
  • Data Table on Market opportunity by End-user ($ million)
10 Market Segmentation by Type
10.1 Market segments
  • Chart on Type - Market share 2025-2030 (%)
  • Data Table on Type - Market share 2025-2030 (%)
10.2 Comparison by Type
  • Chart on Comparison by Type
  • Data Table on Comparison by Type
10.3 Electrical infrastructure - Market size and forecast 2025-2030
  • Chart on Electrical infrastructure - Market size and forecast 2025-2030 ($ million)
  • Data Table on Electrical infrastructure - Market size and forecast 2025-2030 ($ million)
  • Chart on Electrical infrastructure - Year-over-year growth 2025-2030 (%)
  • Data Table on Electrical infrastructure - Year-over-year growth 2025-2030 (%)
10.4 Mechanical infrastructure - Market size and forecast 2025-2030
  • Chart on Mechanical infrastructure - Market size and forecast 2025-2030 ($ million)
  • Data Table on Mechanical infrastructure - Market size and forecast 2025-2030 ($ million)
  • Chart on Mechanical infrastructure - Year-over-year growth 2025-2030 (%)
  • Data Table on Mechanical infrastructure - Year-over-year growth 2025-2030 (%)
10.5 Networking infrastructure - Market size and forecast 2025-2030
  • Chart on Networking infrastructure - Market size and forecast 2025-2030 ($ million)
  • Data Table on Networking infrastructure - Market size and forecast 2025-2030 ($ million)
  • Chart on Networking infrastructure - Year-over-year growth 2025-2030 (%)
  • Data Table on Networking infrastructure - Year-over-year growth 2025-2030 (%)
10.6 Others - Market size and forecast 2025-2030
  • Chart on Others - Market size and forecast 2025-2030 ($ million)
  • Data Table on Others - Market size and forecast 2025-2030 ($ million)
  • Chart on Others - Year-over-year growth 2025-2030 (%)
  • Data Table on Others - Year-over-year growth 2025-2030 (%)
10.7 Market opportunity by Type
  • Market opportunity by Type ($ million)
  • Data Table on Market opportunity by Type ($ million)
11 Customer Landscape
11.1 Customer landscape overview
  • Analysis of price sensitivity, lifecycle, customer purchase basket, adoption rates, and purchase criteria
12 Drivers, Challenges, and Opportunity
12.1 Market drivers
  • Generative AI cluster growth drives infrastructure investments
  • Adoption of high-density liquid cooling drives mechanical upgrade
  • Private infrastructure partnerships expand power capacity
12.2 Market challenges
  • Grid interconnection delays postpone construction timelines
  • Electrical equipment shortages delay facility construction
  • Municipal permitting moratoria disrupt greenfield development
12.3 Impact of drivers and challenges
  • Impact of drivers and challenges in 2025 and 2030
12.4 Market opportunities
  • Migration to secondary industrial submarkets lowers utility interconnection costs
  • Standardized prefabricated modular data centers simplify deployment
  • Growing deployment of dedicated on-site behind-the-meter power generation
13 Competitive Landscape
13.1 Overview
13.2 Competitive Landscape
  • Overview on criticality of inputs and factors of differentiation
13.3 Landscape disruption
  • Overview on factors of disruption
13.4 Industry risks
  • Impact of key risks on business
14 Competitive Analysis
14.1 Companies profiled
  • Companies covered
14.2 Company ranking index
  • Company ranking index
14.3 Market positioning of companies
  • Matrix on companies position and classification
14.4 AECOM
  • AECOM - Overview
  • AECOM - Business segments
  • AECOM - Key offerings
  • AECOM - Segment focus
  • SWOT
14.5 Arup Group Ltd.
  • Arup Group Ltd. - Overview
  • Arup Group Ltd. - Product / Service
  • Arup Group Ltd. - Key offerings
  • SWOT
14.6 Balfour Beatty US
  • Balfour Beatty US - Overview
  • Balfour Beatty US - Business segments
  • Balfour Beatty US - Key offerings
  • Balfour Beatty US - Segment focus
  • SWOT
14.7 Black and Veatch Holding Co.
  • Black and Veatch Holding Co. - Overview
  • Black and Veatch Holding Co. - Product / Service
  • Black and Veatch Holding Co. - Key offerings
  • SWOT
14.8 Brasfield and Gorrie LLC
  • Brasfield and Gorrie LLC - Overview
  • Brasfield and Gorrie LLC - Product / Service
  • Brasfield and Gorrie LLC - Key offerings
  • SWOT
14.9 Clark Construction Group
  • Clark Construction Group - Overview
  • Clark Construction Group - Product / Service
  • Clark Construction Group - Key offerings
  • SWOT
14.10 CORGAN
  • CORGAN - Overview
  • CORGAN - Product / Service
  • CORGAN - Key offerings
  • SWOT
14.11 DPR Construction
  • DPR Construction - Overview
  • DPR Construction - Product / Service
  • DPR Construction - Key offerings
  • SWOT
14.12 Fluor Corp.
  • Fluor Corp. - Overview
  • Fluor Corp. - Business segments
  • Fluor Corp. - Key news
  • Fluor Corp. - Key offerings
  • Fluor Corp. - Segment focus
  • SWOT
14.13 Gensler. M. Arthur Gensler Jr.
  • Gensler. M. Arthur Gensler Jr. - Overview
  • Gensler. M. Arthur Gensler Jr. - Product / Service
  • Gensler. M. Arthur Gensler Jr. - Key offerings
  • SWOT
14.14 Gilbane Inc.
  • Gilbane Inc. - Overview
  • Gilbane Inc. - Product / Service
  • Gilbane Inc. - Key offerings
  • SWOT
14.15 Hensel Phelps
  • Hensel Phelps - Overview
  • Hensel Phelps - Product / Service
  • Hensel Phelps - Key offerings
  • SWOT
14.16 HITT Contracting Inc.
  • HITT Contracting Inc. - Overview
  • HITT Contracting Inc. - Product / Service
  • HITT Contracting Inc. - Key offerings
  • SWOT
14.17 Hoffman Construction Co.
  • Hoffman Construction Co. - Overview
  • Hoffman Construction Co. - Product / Service
  • Hoffman Construction Co. - Key offerings
  • SWOT
14.18 Holder Construction Group LLC
  • Holder Construction Group LLC - Overview
  • Holder Construction Group LLC - Product / Service
  • Holder Construction Group LLC - Key offerings
  • SWOT
15 Appendix
15.1 Scope of the report
  • Market definition
  • Objectives
  • Notes and caveats
15.2 Inclusions and exclusions checklist
  • Inclusions checklist
  • Exclusions checklist
15.3 Currency conversion rates for US$
  • Currency conversion rates for US$
15.4 Research methodology
  • Research methodology
15.5 Data procurement
  • Information sources
15.6 Data validation
  • Data validation
15.7 Validation techniques employed for market sizing
  • Validation techniques employed for market sizing
15.8 Data synthesis
  • Data synthesis
15.9 360 degree market analysis
  • 360 degree market analysis
15.10 List of abbreviations
  • List of abbreviations
List of Exhibits
Exhibit 1: Executive Summary - Chart on Market Overview
Exhibit 2: Executive Summary - Data Table on Market Overview
Exhibit 3: Executive Summary - Chart on Country Market Characteristics
Exhibit 4: Executive Summary - Chart on Market Segmentation by Application
Exhibit 5: Executive Summary - Chart on Market Segmentation by End-user
Exhibit 6: Executive Summary - Chart on Market Segmentation by Type
Exhibit 7: Executive Summary - Chart on Company Market Positioning
Exhibit 8: Analysis of price sensitivity, lifecycle, customer purchase basket, adoption rates, and purchase criteria
Exhibit 9: Overview on criticality of inputs and factors of differentiation
Exhibit 10: Overview on factors of disruption
Exhibit 11: Impact of drivers and challenges in 2025 and 2030
Exhibit 12: Chart on Parent Market
Exhibit 13: Data Table on - Parent Market
Exhibit 14: Chart on Market characteristics analysis
Exhibit 15: Chart on Value chain analysis
Exhibit 16: Data Table on Offerings of companies included in the market definition
Exhibit 17: Market segments
Exhibit 18: Chart on US - Market size and forecast 2025-2030 ($ million)
Exhibit 19: Data Table on US - Market size and forecast 2025-2030 ($ million)
Exhibit 20: Chart on US: Year-over-year growth 2025-2030 (%)
Exhibit 21: Data Table on US: Year-over-year growth 2025-2030 (%)
Exhibit 22: Historic Market Size - Data Table on Data Center Construction Market in US 2020 - 2024 ($ million)
Exhibit 23: Historic Market Size - Application Segment 2020 - 2024 ($ million)
Exhibit 24: Historic Market Size - End-user Segment 2020 - 2024 ($ million)
Exhibit 25: Historic Market Size - Type Segment 2020 - 2024 ($ million)
Exhibit 26: Five forces analysis - Comparison between 2025 and 2030
Exhibit 27: Bargaining power of buyers - Impact of key factors 2025 and 2030
Exhibit 28: Bargaining power of suppliers - Impact of key factors in 2025 and 2030
Exhibit 29: Threat of new entrants - Impact of key factors in 2025 and 2030
Exhibit 30: Threat of substitutes - Impact of key factors in 2025 and 2030
Exhibit 31: Threat of rivalry - Impact of key factors in 2025 and 2030
Exhibit 32: Chart on Market condition - Five forces 2025 and 2030
Exhibit 33: Chart on Application - Market share 2025-2030 (%)
Exhibit 34: Data Table on Application - Market share 2025-2030 (%)
Exhibit 35: Chart on Comparison by Application
Exhibit 36: Data Table on Comparison by Application
Exhibit 37: Chart on Enterprises - Market size and forecast 2025-2030 ($ million)
Exhibit 38: Data Table on Enterprises - Market size and forecast 2025-2030 ($ million)
Exhibit 39: Chart on Enterprises - Year-over-year growth 2025-2030 (%)
Exhibit 40: Data Table on Enterprises - Year-over-year growth 2025-2030 (%)
Exhibit 41: Chart on Cloud - Market size and forecast 2025-2030 ($ million)
Exhibit 42: Data Table on Cloud - Market size and forecast 2025-2030 ($ million)
Exhibit 43: Chart on Cloud - Year-over-year growth 2025-2030 (%)
Exhibit 44: Data Table on Cloud - Year-over-year growth 2025-2030 (%)
Exhibit 45: Chart on Colocation - Market size and forecast 2025-2030 ($ million)
Exhibit 46: Data Table on Colocation - Market size and forecast 2025-2030 ($ million)
Exhibit 47: Chart on Colocation - Year-over-year growth 2025-2030 (%)
Exhibit 48: Data Table on Colocation - Year-over-year growth 2025-2030 (%)
Exhibit 49: Chart on Hyperscale - Market size and forecast 2025-2030 ($ million)
Exhibit 50: Data Table on Hyperscale - Market size and forecast 2025-2030 ($ million)
Exhibit 51: Chart on Hyperscale - Year-over-year growth 2025-2030 (%)
Exhibit 52: Data Table on Hyperscale - Year-over-year growth 2025-2030 (%)
Exhibit 53: Market opportunity by Application ($ million)
Exhibit 54: Data Table on Market opportunity by Application ($ million)
Exhibit 55: Chart on End-user - Market share 2025-2030 (%)
Exhibit 56: Data Table on End-user - Market share 2025-2030 (%)
Exhibit 57: Chart on Comparison by End-user
Exhibit 58: Data Table on Comparison by End-user
Exhibit 59: Chart on IT and telecom - Market size and forecast 2025-2030 ($ million)
Exhibit 60: Data Table on IT and telecom - Market size and forecast 2025-2030 ($ million)
Exhibit 61: Chart on IT and telecom - Year-over-year growth 2025-2030 (%)
Exhibit 62: Data Table on IT and telecom - Year-over-year growth 2025-2030 (%)
Exhibit 63: Chart on BFSI - Market size and forecast 2025-2030 ($ million)
Exhibit 64: Data Table on BFSI - Market size and forecast 2025-2030 ($ million)
Exhibit 65: Chart on BFSI - Year-over-year growth 2025-2030 (%)
Exhibit 66: Data Table on BFSI - Year-over-year growth 2025-2030 (%)
Exhibit 67: Chart on Government and defense - Market size and forecast 2025-2030 ($ million)
Exhibit 68: Data Table on Government and defense - Market size and forecast 2025-2030 ($ million)
Exhibit 69: Chart on Government and defense - Year-over-year growth 2025-2030 (%)
Exhibit 70: Data Table on Government and defense - Year-over-year growth 2025-2030 (%)
Exhibit 71: Chart on Others - Market size and forecast 2025-2030 ($ million)
Exhibit 72: Data Table on Others - Market size and forecast 2025-2030 ($ million)
Exhibit 73: Chart on Others - Year-over-year growth 2025-2030 (%)
Exhibit 74: Data Table on Others - Year-over-year growth 2025-2030 (%)
Exhibit 75: Market opportunity by End-user ($ million)
Exhibit 76: Data Table on Market opportunity by End-user ($ million)
Exhibit 77: Chart on Type - Market share 2025-2030 (%)
Exhibit 78: Data Table on Type - Market share 2025-2030 (%)
Exhibit 79: Chart on Comparison by Type
Exhibit 80: Data Table on Comparison by Type
Exhibit 81: Chart on Electrical infrastructure - Market size and forecast 2025-2030 ($ million)
Exhibit 82: Data Table on Electrical infrastructure - Market size and forecast 2025-2030 ($ million)
Exhibit 83: Chart on Electrical infrastructure - Year-over-year growth 2025-2030 (%)
Exhibit 84: Data Table on Electrical infrastructure - Year-over-year growth 2025-2030 (%)
Exhibit 85: Chart on Mechanical infrastructure - Market size and forecast 2025-2030 ($ million)
Exhibit 86: Data Table on Mechanical infrastructure - Market size and forecast 2025-2030 ($ million)
Exhibit 87: Chart on Mechanical infrastructure - Year-over-year growth 2025-2030 (%)
Exhibit 88: Data Table on Mechanical infrastructure - Year-over-year growth 2025-2030 (%)
Exhibit 89: Chart on Networking infrastructure - Market size and forecast 2025-2030 ($ million)
Exhibit 90: Data Table on Networking infrastructure - Market size and forecast 2025-2030 ($ million)
Exhibit 91: Chart on Networking infrastructure - Year-over-year growth 2025-2030 (%)
Exhibit 92: Data Table on Networking infrastructure - Year-over-year growth 2025-2030 (%)
Exhibit 93: Chart on Others - Market size and forecast 2025-2030 ($ million)
Exhibit 94: Data Table on Others - Market size and forecast 2025-2030 ($ million)
Exhibit 95: Chart on Others - Year-over-year growth 2025-2030 (%)
Exhibit 96: Data Table on Others - Year-over-year growth 2025-2030 (%)
Exhibit 97: Market opportunity by Type ($ million)
Exhibit 98: Data Table on Market opportunity by Type ($ million)
Exhibit 99: Analysis of price sensitivity, lifecycle, customer purchase basket, adoption rates, and purchase criteria
Exhibit 100: Impact of drivers and challenges in 2025 and 2030
Exhibit 101: Overview on criticality of inputs and factors of differentiation
Exhibit 102: Overview on factors of disruption
Exhibit 103: Impact of key risks on business
Exhibit 104: Companies covered
Exhibit 105: Company ranking index
Exhibit 106: Matrix on companies position and classification
Exhibit 107: AECOM - Overview
Exhibit 108: AECOM - Business segments
Exhibit 109: AECOM - Key offerings
Exhibit 110: AECOM - Segment focus
Exhibit 111: SWOT
Exhibit 112: Arup Group Ltd. - Overview
Exhibit 113: Arup Group Ltd. - Product / Service
Exhibit 114: Arup Group Ltd. - Key offerings
Exhibit 115: SWOT
Exhibit 116: Balfour Beatty US - Overview
Exhibit 117: Balfour Beatty US - Business segments
Exhibit 118: Balfour Beatty US - Key offerings
Exhibit 119: Balfour Beatty US - Segment focus
Exhibit 120: SWOT
Exhibit 121: Black and Veatch Holding Co. - Overview
Exhibit 122: Black and Veatch Holding Co. - Product / Service
Exhibit 123: Black and Veatch Holding Co. - Key offerings
Exhibit 124: SWOT
Exhibit 125: Brasfield and Gorrie LLC - Overview
Exhibit 126: Brasfield and Gorrie LLC - Product / Service
Exhibit 127: Brasfield and Gorrie LLC - Key offerings
Exhibit 128: SWOT
Exhibit 129: Clark Construction Group - Overview
Exhibit 130: Clark Construction Group - Product / Service
Exhibit 131: Clark Construction Group - Key offerings
Exhibit 132: SWOT
Exhibit 133: CORGAN - Overview
Exhibit 134: CORGAN - Product / Service
Exhibit 135: CORGAN - Key offerings
Exhibit 136: SWOT
Exhibit 137: DPR Construction - Overview
Exhibit 138: DPR Construction - Product / Service
Exhibit 139: DPR Construction - Key offerings
Exhibit 140: SWOT
Exhibit 141: Fluor Corp. - Overview
Exhibit 142: Fluor Corp. - Business segments
Exhibit 143: Fluor Corp. - Key news
Exhibit 144: Fluor Corp. - Key offerings
Exhibit 145: Fluor Corp. - Segment focus
Exhibit 146: SWOT
Exhibit 147: Gensler. M. Arthur Gensler Jr. - Overview
Exhibit 148: Gensler. M. Arthur Gensler Jr. - Product / Service
Exhibit 149: Gensler. M. Arthur Gensler Jr. - Key offerings
Exhibit 150: SWOT
Exhibit 151: Gilbane Inc. - Overview
Exhibit 152: Gilbane Inc. - Product / Service
Exhibit 153: Gilbane Inc. - Key offerings
Exhibit 154: SWOT
Exhibit 155: Hensel Phelps - Overview
Exhibit 156: Hensel Phelps - Product / Service
Exhibit 157: Hensel Phelps - Key offerings
Exhibit 158: SWOT
Exhibit 159: HITT Contracting Inc. - Overview
Exhibit 160: HITT Contracting Inc. - Product / Service
Exhibit 161: HITT Contracting Inc. - Key offerings
Exhibit 162: SWOT
Exhibit 163: Hoffman Construction Co. - Overview
Exhibit 164: Hoffman Construction Co. - Product / Service
Exhibit 165: Hoffman Construction Co. - Key offerings
Exhibit 166: SWOT
Exhibit 167: Holder Construction Group LLC - Overview
Exhibit 168: Holder Construction Group LLC - Product / Service
Exhibit 169: Holder Construction Group LLC - Key offerings
Exhibit 170: SWOT
Exhibit 171: Inclusions checklist
Exhibit 172: Exclusions checklist
Exhibit 173: Currency conversion rates for US$
Exhibit 174: Research methodology
Exhibit 175: Information sources
Exhibit 176: Data validation
Exhibit 177: Validation techniques employed for market sizing
Exhibit 178: Data synthesis
Exhibit 179: 360 degree market analysis
Exhibit 180: List of abbreviations

Executive Summary

The following companies are recognized as the key players in the global data center construction market in us: AECOM, Arup Group Ltd., Balfour Beatty US, Black and Veatch Holding Co., Brasfield and Gorrie LLC, Clark Construction Group, CORGAN, DPR Construction, Fluor Corp., Gensler. M. Arthur Gensler Jr., Gilbane Inc., Hensel Phelps, HITT Contracting Inc., Hoffman Construction Co., Holder Construction Group LLC, J.E. Dunn Construction Co., Jacobs Solutions Inc., M. A. Mortenson Co., McCarthy Building Companies, Page Southerland Page Inc..

Commenting on the report, an analyst from the research team said: "The latest trend gaining momentum in the market is migration to secondary industrial submarkets lowers utility interconnection costs."

According to the report, one of the major drivers for this market is the generative ai cluster growth drives infrastructure investments.

The study was conducted using an objective combination of primary and secondary information including inputs from key participants in the industry. The report contains a comprehensive market and vendor landscape in addition to a SWOT analysis of the key vendors.

Companies Mentioned (Partial List)

A selection of companies mentioned in this report includes, but is not limited to:

  • AECOM
  • Arup Group Ltd.
  • Balfour Beatty US
  • Black and Veatch Holding Co.
  • Brasfield and Gorrie LLC
  • Clark Construction Group
  • CORGAN
  • DPR Construction
  • Fluor Corp.
  • Gensler. M. Arthur Gensler Jr.
  • Gilbane Inc.
  • Hensel Phelps
  • HITT Contracting Inc.
  • Hoffman Construction Co.
  • Holder Construction Group LLC
  • J.E. Dunn Construction Co.
  • Jacobs Solutions Inc.
  • M. A. Mortenson Co.
  • McCarthy Building Companies
  • Page Southerland Page Inc.