South America Data Center Transformer Market Trends and Insights
Hyperscale and Artificial Intelligence Data Center Expansion
Ascenty announced a USD 1.2 billion plan in 2026 for 4 AI-dedicated data centers in São Paulo state. The Sumaré 3 facility alone represents USD 720 million of the planned investment and is intended for hyperscale AI workloads, illustrating the move from general cloud capacity toward facilities designed around computing-intensive AI applications and their associated electrical systems. AI training clusters can require high rack densities, which increases the electrical capacity needed at each campus and raises the need for coordinated transformer, substation, protection, and distribution design. Terranova contracted Siemens Energy in March 2026 for 2 transformers rated at 150 MVA and a 300 MW gas-insulated substation for its Campinas campus. The contract shows how a data center development can require equipment more commonly associated with a transmission project, which increases the importance of proven manufacturing capacity and detailed commissioning plans. These purchases can favor suppliers that can provide high-capacity equipment and secure production slots before construction begins, because late electrical equipment can affect the timing of the entire facility.Cloud, Colocation, and Digital Infrastructure Investment
Amazon Web Services confirmed a USD 4 billion investment for its first cloud region in Chile, with 3 availability zones scheduled to operate in the second half of 2026. The commitment adds demand for switchgear, step-down equipment, and distribution transformers across the main grid connection as well as the internal power architecture of each availability zone. BNDES approved a BRL 180 million (USD 34 million) credit line for Scala Data Centers in March 2025 to support equipment acquisition and installation, demonstrating that financing for digital infrastructure can support power equipment purchases in addition to the building work itself. Colocation operators can build AI-ready power capacity before they have a signed tenant for every portion of a site, allowing them to respond more quickly when cloud customers need capacity. This approach moves transformer procurement earlier in the development cycle and gives manufacturers more visibility before a facility begins full construction. It also extends demand beyond projects that hyperscalers own directly.Long Utility Interconnection and Transmission-Upgrade Lead Times
Grid access is an immediate constraint on the pace of data center development in Brazil. ONS introduced fixed application windows known as Access Seasons, which lengthened the access-opinion process for some applicants and made connection timing a more visible part of project planning for developers, utilities, and equipment providers. Ascenty submitted an application in January 2025 and faced an estimated additional 16-month wait beyond the standard review period. Renewable projects can reach operation within 2 years, while transmission reinforcement can require up to 5 years. Developers in the Barueri, Campinas, and Vinhedo cluster can need dedicated high-voltage equipment where the existing network cannot absorb additional load, increasing both the upfront engineering requirement and the financing need. This timing gap can defer transformer orders even when the underlying project pipeline remains active, because manufacturers cannot fully convert interest into firm orders without a clear connection schedule.Other drivers and restraints analyzed in the detailed report include:
- Renewable-Energy Procurement and Green Data Center Development
- Data Localization and In-Country Processing Requirements
- High Transformer, Switchgear, and Substation Capital Costs
Segment Analysis
Liquid-immersed units held 63.31% of the South America data center transformer market share in 2026. Their thermal capacity makes them suitable for high-MVA outdoor substations that serve large data center campuses, where equipment must operate reliably under sustained electrical loads. Their cost per MVA can also be lower than dry-type alternatives in transmission-level applications, making them a practical choice where developers need large electrical capacity and have sufficient land for outdoor equipment. WEG supplied transformers for Elea's 50 MW high-voltage site in São Paulo, with units manufactured at the company's Gravataí facility and delivered in mid-2025. The supply arrangement shows how local production can support equipment procurement for large projects, especially when developers need equipment that matches local standards, construction schedules, site conditions, technical documentation needs, reliable long-term maintenance access, and ongoing service expectations.Dry-type transformers are projected to expand at a 7.68% CAGR through 2032. They are suited to indoor electrical rooms and modular data center layouts where fire safety requirements influence equipment selection. Operators building phased sites can integrate dry-type units into prefabricated power modules. This approach can reduce site assembly time and allow developers to commit capital in stages, a consideration for operators expanding capacity in response to tenant demand. Large direct grid connections are more likely to use liquid-immersed units at the interconnection point. Indoor installations can therefore support dry-type demand even as large outdoor substations retain their central role, because space constraints, fire requirements, and modular building designs differ materially from one development to another.
Within the South America data center transformer market, the above-10-to-30-MVA band accounted for 35.43% of the South America data center transformer market size in 2026. It remains relevant to colocation and mid-scale cloud facilities that have shaped regional demand to date, where capacity additions can be more gradual than at a hyperscale campus. These units can also be deployed in multiples where a developer needs redundancy and staged expansion, allowing the power system to be expanded as more data halls are brought online. The middle tier can provide steady order volumes for suppliers with established production lines, complementing the less frequent but larger orders for transmission-class equipment. It is therefore important, even as individual campus requirements become much larger.
Above-30-MVA units are projected to expand at a 7.53% CAGR through 2032. Terranova ordered 2 transformers rated at 150 MVA for its Campinas site, showing how one AI campus can create several large-format orders. The equipment was ordered before the start of construction to secure delivery capacity, underlining how purchasing decisions can be made well before a developer begins visible work on the data center site. Sub-10-MVA units continue to serve enterprise and edge facilities in secondary cities and in earlier-stage national markets. The South America data center transformer market will need both high-capacity units for large campuses and smaller units for distributed installations, with product availability shaped by the differing needs of each project type.
Complete Report Scope:
- By Transformer Type
- Liquid-Immersed Transformers
- Dry-Type Transformers
- By Power Rating
- Up to 10 MVA
- Above 10 MVA to 30 MVA
- Above 30 MVA
- By Voltage Level
- Low Voltage
- Medium Voltage
- High Voltage
- By Installation
- Indoor Installation
- Outdoor Installation
- By Data Center Size
- Small
- Medium
- Large
- Hyperscale
- By Data Center Type
- Colocation
- Cloud Service Provider
- Enterprise Data Centers/Edge
- By Geography
- Brazil
- Argentina
- Chile
- Rest of South America
List of Companies Covered in this Report:
- ABB Ltd
- Eaton Corporation plc
- General Electric Company
- Hitachi Energy Ltd
- Siemens Energy AG
- Schneider Electric SE
- WEG S.A.
- Toshiba Energy Systems and Solutions Corporation
- Mitsubishi Electric Corporation
- SGB-SMIT Group
- Hyosung Heavy Industries Corporation
- Virginia Transformer Corp.
- Hammond Power Solutions Inc.
- Legrand SA
- TBEA Co., Ltd.
- Efacec
- Celme S.r.l.
- Fuji Electric Co., Ltd.
- Trafomec Equipamentos Elétricos Ltda.
- Trafo Equipamentos Elétricos S.A.
- RMV Transformadores Ltda.
Additional Benefits:
- The market estimate (ME) sheet in Excel format
- 3 months of analyst support
Table of Contents
Companies Mentioned (Partial List)
A selection of companies mentioned in this report includes, but is not limited to:
- ABB Ltd
- Eaton Corporation plc
- General Electric Company
- Hitachi Energy Ltd
- Siemens Energy AG
- Schneider Electric SE
- WEG S.A.
- Toshiba Energy Systems and Solutions Corporation
- Mitsubishi Electric Corporation
- SGB-SMIT Group
- Hyosung Heavy Industries Corporation
- Virginia Transformer Corp.
- Hammond Power Solutions Inc.
- Legrand SA
- TBEA Co., Ltd.
- Efacec
- Celme S.r.l.
- Fuji Electric Co., Ltd.
- Trafomec Equipamentos Elétricos Ltda.
- Trafo Equipamentos Elétricos S.A.
- RMV Transformadores Ltda.