South America Data Center Renewable Energy Market Trends and Insights
Rising Hyperscale and AI Data Center Power Demand
Brazil’s data center energy demand reached 770 MW in 2025, and announced projects could lift demand to 13.2 GW by 2035. This demand profile is changing how the South America data center renewable energy market is supplied, as AI campuses require far more power than conventional enterprise facilities. Chile’s grid coordinator expects data center demand to rise from 325 MW in 2025 to 1,360 MW by 2032. Large campuses also require dependable delivery at all hours, which makes a simple renewable certificate less useful than a physical supply arrangement. The Omnia agreement with Casa dos Ventos showed how long-term wind supply and ownership interests can be combined for a large Brazilian data center project.Expansion of Corporate Renewable PPAs and Self-Production
Corporate PPAs and self-production arrangements are becoming central to project design in Brazil and Chile. Atlas Renewable Energy received BRL 1 billion (USD 179 million) in financing for the Draco Solar Complex, which will deliver 710 GWh of power annually to V.tal and Tecto Data Centers. This structure links the new generation directly to demand for digital infrastructure rather than relying solely on merchant power sales. Brazil’s REDATA framework also makes renewable sourcing relevant to data center tax benefits. These arrangements give operators greater visibility over long-term electricity costs and energy attributes. They also make renewable developers long-term infrastructure partners rather than only electricity suppliers.Grid Congestion and Renewable Transmission Bottlenecks
Transmission shortfalls limit the pace at which renewable capacity can be delivered to major data center clusters. The World Economic Forum reported that renewable curtailment in South America reached 53,000 GWh in 2024, with economic losses estimated at USD 7 billion. In Chile, new transmission is needed to move northern solar generation to demand centers around Santiago. The Kimal-Lo Aguirre high-voltage line is therefore important for the South America data center renewable energy market. The Inter-American Development Bank has also identified grid planning and investment as necessary to improve reliability and the integration of renewables in the region. Operators are addressing this issue through dedicated connections, self-production, and storage-backed contracts.Other drivers and restraints analyzed in the detailed report include:
- Abundant Solar, Wind, and Hydropower Resources
- Data Sovereignty and Regional Cloud Infrastructure Expansion
- Intermittency Risk for Mission-Critical Loads
Segment Analysis
Hydropower held 37.99% of the South America data center renewable energy market share in 2026. Brazil and Colombia have established hydroelectric fleets that can provide renewable baseload power for digital infrastructure. Brazil’s installed power capacity was 219 GW, with renewable sources accounting for 77% of that capacity. This power mix supports hydro-backed PPAs for operators seeking renewable credentials without immediate storage investment. Wind energy is also an important source in Brazil’s northeast, where Scala Data Centers began receiving supply from Serena Energia’s Assuruá 4 and Ventos da Bahia 3 projects in 2025.Solar power is projected to expand at a 21.88% CAGR through 2032 as dedicated solar projects become more practical for data center supply. Chile’s renewable system included 9,031 MW of solar and 4,517 MW of wind capacity by late 2025. Atlas’s Draco project illustrates how solar capacity can be connected to specific data center buyers under a structured contract. Geothermal, biomass, and biogas remain smaller sources, although they can add diversity in locations with suitable resources. IRENA’s capacity outlook suggests that solar and wind will provide an expanding project pipeline through 2030.
Off-site physical PPAs held 45.94% of the South America data center renewable energy market in 2026. These agreements allow operators to secure energy and related attributes from larger renewable plants without owning on-site generation. They can also provide a clearer link between data center consumption and new renewable construction. Atlas and ODATA signed a 2025 agreement to supply I-REC-certifiable renewable energy to ODATA’s ST01 campus in Santiago. On-site generation remains relevant for smaller facilities and locations where grid independence has a high value. Financial PPAs, renewable certificates, and utility green programs offer other routes for organizations that cannot commit to a direct physical contract.
Storage and firming services are projected to expand at a 21.67% CAGR through 2032. They address the difference between when renewable power is generated and when a data center needs electricity. Chile is developing hybrid contract models that pair renewable energy supply with battery storage, while Brazil is establishing rules for storage procurement. These services are likely to become more common as operators pursue hourly rather than annual matching. Regulatory influence from ANEEL in Brazil and the Comisión Nacional de Energía in Chile will shape how batteries participate in power and ancillary-service arrangements.
Standalone renewable projects held 58.04% of the South America data center renewable energy market share in 2026. Their established financing structures and simpler development pathways make them attractive for initial renewable procurement. Dedicated wind and solar plants can provide substantial volumes under long-term supply agreements. Hybrid projects combine more than one renewable source, which can improve the shape of delivered generation. This model is relevant in Chile, where solar output in the north can complement wind resources from other areas. The configuration can also support more credible reporting of a facility’s power supply profile.
Renewable projects with battery storage are projected to expand at a 21.46% CAGR through 2032. Their adoption reflects higher curtailment risk, transmission limits, and customer expectations for cleaner electricity at all hours. Trina Storage secured 1,203 MWh of battery contracts in Chile and Argentina in January 2026, including a 722 MWh project in the Atacama region. These installations provide a practical path to shift solar output into later hours. Brazil’s storage consultations show that national rules are beginning to recognize batteries' system role. The South America data center renewable energy market will need more projects of this kind as high-load campuses expand.
Complete Report Scope:
- By Renewable Energy Source
- Solar Power
- Wind Power
- Hydropower
- Geothermal Power
- Biomass and Biogas Power
- Other Renewable Sources
- By Procurement Model
- On-Site Renewable Generation
- Off-Site Physical PPAs
- Virtual or Financial PPAs
- Utility Green Power Programs
- Renewable Energy Certificates and Guarantees of Origin
- By Project Configuration
- Standalone Renewable Projects
- Hybrid Renewable Projects
- Renewable Projects with Battery Storage
- Renewable Projects with Other Firming Solutions
- By Contract Duration
- Short-Term Contracts
- Medium-Term Contracts
- Long-Term Contracts
- By Primary Procurement Objective
- Electricity Cost Optimization
- Emissions Reduction
- Renewable Energy Matching
- Long-Term Supply Security
- By Data Center Size
- Small
- Medium
- Large
- Hyperscale
- By Data Center Type
- Colocation
- Cloud Service Providers (CSPs)
- Enterprise and Edge
- By Geography
- Brazil
- Chile
- Colombia
- Argentina
- Rest of South America
List of Companies Covered in this Report:
- Atlas Renewable Energy
- Enel Américas S.A.
- ENGIE Energía Chile S.A.
- ENGIE Brasil Energia S.A.
- AES Andes S.A.
- Auren Energia S.A.
- Casa dos Ventos Energias Renováveis S.A.
- Serena Energia S.A.
- Brookfield Asset Management Ltd.
- Digital Realty Trust, Inc.
- Equinix, Inc.
- Scala Data Centers S.A.
- Aligned Data Centers
- ODATA, an Aligned Data Centers Company
- V.tal S.A.
- Tecto Data Centers
- Microsoft Corporation
- Amazon Web Services, Inc.
- Google LLC
- Central Puerto S.A.
- Genneia S.A.
- Statkraft AS
- Matrix Renewables
Additional Benefits:
- The market estimate (ME) sheet in Excel format
- 3 months of analyst support
Table of Contents
Companies Mentioned (Partial List)
A selection of companies mentioned in this report includes, but is not limited to:
- Atlas Renewable Energy
- Enel Américas S.A.
- ENGIE Energía Chile S.A.
- ENGIE Brasil Energia S.A.
- AES Andes S.A.
- Auren Energia S.A.
- Casa dos Ventos Energias Renováveis S.A.
- Serena Energia S.A.
- Brookfield Asset Management Ltd.
- Digital Realty Trust, Inc.
- Equinix, Inc.
- Scala Data Centers S.A.
- Aligned Data Centers
- ODATA, an Aligned Data Centers Company
- V.tal S.A.
- Tecto Data Centers
- Microsoft Corporation
- Amazon Web Services, Inc.
- Google LLC
- Central Puerto S.A.
- Genneia S.A.
- Statkraft AS
- Matrix Renewables