South America Data Center Grid Infrastructure and Interconnection Market Trends and Insights
Accelerating Hyperscale and Artificial Intelligence Data Center Load Growth
AI training and inference workloads are changing the scale of connections required by large facilities. Brazil's EPE reported 38 GW of grid-access assessment requests by mid-2026, with 7.1 GW linked to committed investment. Requests have clustered near high-voltage connection points in São Paulo and Rio Grande do Sul. This pattern makes access to individual nodes more important than a broad national capacity figure. Scala received authorization in May 2025 for a 5 GW ramp-up connection for its AI City project in Eldorado do Sul. The project targets 4.75 GW of IT capacity, which shows why early connection rights can shape the South America data center grid infrastructure and interconnection market.Expansion of Cloud and Colocation Capacity in Brazil and Chile
Cloud and colocation investments are adding new demand to the South America data center grid infrastructure and interconnection market. AWS is investing USD 4 billion in its first cloud region in Chile, with operations targeted for the second half of 2026. Microsoft committed USD 2.7 billion to expansion in Brazil, while AWS committed USD 1.8 billion in Brazil by 2027. These projects require new substations and high-voltage connections with different requirements than conventional commercial loads. Ascenty also planned USD 1 billion of 2026 capital expenditure across 13 development projects, including the 47 MW SPO05 campus in Greater São Paulo. Established sites are not always able to accommodate this demand, so new campuses are extending into areas with available transmission headroom.Limited Transmission Availability Around Established Data Center Clusters
Transmission availability near established clusters directly constrains the South America data center grid infrastructure and interconnection market. Brazil's data center electricity demand is expected to double between 2026 and 2031, rising from 2% to 4%-5% of national consumption. Transmission projects can take 7 years, while data center projects can be delivered within 18 months. Renewable plants in Brazil's northeast are distant from the main demand centers in São Paulo and Rio de Janeiro. The remaining capacity at key substation nodes is consequently under pressure from multiple operators simultaneously. The PNAST access season may improve allocation discipline, but its qualification requirements can be harder for mid-scale operators to meet.Other drivers and restraints analyzed in the detailed report include:
- Increasing Demand for Dedicated High-Voltage Grid Connections
- Renewable Energy Procurement and Green Data Center Commitments
- Long Approval Cycles for Grid Access, Environmental Licensing, and Network Reinforcement
Segment Analysis
New Grid Connections held 35.31% of the South America data center grid infrastructure and interconnection market share in 2026. The segment reflects greenfield hyperscale and cloud campuses that need new transmission access points. Large volumes of access applications filed in 2025 and 2026 support near-term demand for these projects. New connections often require voltage levels beyond what distribution systems can serve efficiently. Existing Connection Upgrades are also important as legacy facilities raise their load ceilings for AI workloads. Substation and Grid Interconnection Upgrades can be easier to advance because they build on already licensed sites.Dedicated Transmission Infrastructure is projected to expand at a 17.74% CAGR through 2032. The segment includes owned or long-term-leased corridors designed to reduce reliance on shared access points. Scala AI City's 525 kV arrangement shows the scale of infrastructure that can be required for a campus-level project. Conecta Infra committed USD 350 million to deploy more than 6,000 km of underground fiber-duct network across Argentina, Chile, and Brazil by 2028. The project illustrates how power and network connectivity must be planned together. At campuses above 100 MW, dedicated infrastructure can lower the per-MW access cost and reduce shared-access reliability exposure.
Substations and Switchyards accounted for 29.48% of the South America data center grid infrastructure and interconnection market size in 2026. They form the physical interface between a national transmission system and a data center campus. The Scala and ENGIE Brasil dedicated substation in Barueri involved USD 80 million of investment and 560 MVA of capacity. Siemens Energy also contracted to supply a 300 MW GIS substation and 2 150 MVA transformers for Terranova in Campinas. The contract exceeded BRL 100 million (USD 18.6 million) and used 440/34.5 kV equipment. Urban campuses are increasingly using gas-insulated switchgear because land limits can constrain conventional designs.
Grid Connection, Control, and Monitoring Systems are projected to expand at a 17.92% CAGR through 2032. Each new connection needs systems that support dispatch, visibility, and grid-operation requirements. Regulatory requirements increasingly make real-time operational data a condition of access. Hitachi Energy's January 2026 agreement with RT-One included grid automation, network integration, and SCADA architecture. The agreement also addressed interoperability with the national interconnected system. Power transformers, transmission lines, cables, and protection systems remain important, although they are frequently procured as part of larger substation packages.
Complete Report Scope:
- By Interconnection Project Type
- New Grid Connections
- Existing Connection Upgrades
- Dedicated Transmission Infrastructure
- Substation and Grid Interconnection Upgrades
- By Infrastructure Component
- Substations and Switchyards
- Power Transformers
- Transmission Lines and Cables
- Switchgear and Protection Systems
- Grid Connection, Control, and Monitoring Systems
- By Voltage Level
- Low and Medium Voltage
- High Voltage
- Extra-High Voltage
- By Data Center Size
- Small
- Medium
- Large
- Hyperscale
- By Data Center Type
- Colocation
- Cloud Service Providers (CSPs)
- Enterprise and Edge
- By Geography
- Brazil
- Chile
- Colombia
- Argentina
- Peru
- Rest of South America
List of Companies Covered in this Report:
- ISA Energia Brasil S.A.
- Axia Energia
- Scala Data Centers S.A.
- Ascenty Data Centers e Telecomunicacoes SA
- ODATA Data Centers S.A.
- Tecto Data Centers S.A.
- CloudHQ LLC
- Equinix, Inc.
- Digital Realty Trust, Inc.
- Cirion Technologies, LLC
- EdgeConneX Inc.
- SONDA S.A.
- Telefónica S.A.
- Claro S.A.
- Kyndryl, Inc.
- KIO Networks, S.A. de C.V.
- InterNexa S.A.
- Entel S.A.
- TIVIT Terceirização de Processos, Serviços e Tecnologia S.A.
- Google LLC
- Amazon Web Services, Inc.
- Microsoft Corporation
- Huawei Technologies Co., Ltd.
- Siemens Energy AG
- Schneider Electric SE
- Hitachi Energy Ltd.
Additional Benefits:
- The market estimate (ME) sheet in Excel format
- 3 months of analyst support
Table of Contents
Companies Mentioned (Partial List)
A selection of companies mentioned in this report includes, but is not limited to:
- ISA Energia Brasil S.A.
- Axia Energia
- Scala Data Centers S.A.
- Ascenty Data Centers e Telecomunicacoes SA
- ODATA Data Centers S.A.
- Tecto Data Centers S.A.
- CloudHQ LLC
- Equinix, Inc.
- Digital Realty Trust, Inc.
- Cirion Technologies, LLC
- EdgeConneX Inc.
- SONDA S.A.
- Telefónica S.A.
- Claro S.A.
- Kyndryl, Inc.
- KIO Networks, S.A. de C.V.
- InterNexa S.A.
- Entel S.A.
- TIVIT Terceirização de Processos, Serviços e Tecnologia S.A.
- Google LLC
- Amazon Web Services, Inc.
- Microsoft Corporation
- Huawei Technologies Co., Ltd.
- Siemens Energy AG
- Schneider Electric SE
- Hitachi Energy Ltd.