In 2025, the market is valued at USD 410.00 million and is forecast to grow at a CAGR of 9.0%, reaching USD 970.62 million by 2035. Growth is driven by the arrival of AI workloads, a Warsaw pipeline of 156 MW of planned capacity at the end of the second quarter of 2026, and the move from 100G towards 400G and 800G links.
Market Overview
The Poland data center networking market is moving from steady refresh spending to build-out spending. New campuses near Warsaw, state backing for AI computing and operators upgrading national backbones are lifting orders for high-speed Ethernet fabrics, coherent optics and dense cabling.
Three forces are shaping demand: colocation expansion, with colocation holding 84% of operational Warsaw capacity in October 2026 trade press data; AI clusters that push rack power from single digits towards 100 kW and need lossless fabrics; and carrier upgrades, such as Orange Polska lighting its first 800 Gb/s channel in April 2025.
In September 2025 Atman put its first Duchnice building into service, and in April 2026 Data4 inaugurated its second Jawczyce data center. In July 2026 Poland signed the EU AI gigafactory procurement agreement, while UKE adopted a 2026 to 2030 strategy in May 2026.
Key Market Trends and Insights
- Warsaw pipeline: Trade press reported on 21 October 2026 that Warsaw had 159 MW of operational capacity at the end of the second quarter of 2026, with 156 MW planned.
- Atman Duchnice campus: Atman brought its first Duchnice building into service in September 2025 with 14.4 MW of IT capacity, within a campus target of 43 MW.
- AI computing: Poland joined the EU AI gigafactory initiative in July 2026, targeting at least 25,000 AI accelerators at the start and at least 75,000 later.
- Backbone upgrades: EXATEL reported in March 2026 that its backbone carried more than 150 links at 400G and 170 at 100G, while Orange Polska runs over 30 links at 400 Gb/s.
The market is shifting from 10G and 25G server access towards 100G and 400G leaf and spine fabrics designed for AI and cloud traffic. Ethernet switches lead in value because every new hall needs leaf and spine layers, while optical transport and transceivers advance fastest as campuses interconnect and carriers move to coherent pluggables. Cloud and hyperscale buyers grow quickest, and colocation providers remain the volume anchor. Masovia keeps the largest share on its concentration of campuses, and Greater Poland grows quickest on AI computing and a large Poznan campus. Power access, equipment lead times and skills will shape the pace of delivery, but the direction of travel is towards higher speeds, denser racks and more automation rather than a short investment cycle.
Key Metrics
- Market Size 2025: USD 410.00 million
- Projected Market Size 2035: USD 970.62 million
- CAGR 2026 to 2035: 9.0%
- Fastest-Growing Component: Optical Transport and Transceivers: 11.4% CAGR
- Fastest-Growing Data Rate: 400G and Above: 17.2% CAGR
- Largest Revenue Segment 2025: Ethernet Switches
- Dominant Region: Masovia (Warsaw)
- Highest CAGR by Region: Greater Poland (Poznan): 10.6%
- Operational Warsaw data center capacity, end of Q2 2026: 159 MW
- Base Market Amount 2025: USD 410.00 million
Campus Build-Out Lifts Network Spending
Revenue is on course to rise by about 137% across the decade, from USD 410.00 million in 2025 to USD 970.62 million in 2035 at a 9.0% CAGR. Data4 expects Polish capacity to grow from about 300 MW to about 500 MW by 2030, and every new megawatt needs switching, optics and cabling.
Optical Interconnect and 400G Lead Growth
Ethernet Switches hold the largest share, but Optical Transport and Transceivers grow at an estimated 11.4% CAGR and 400G and Above at an estimated 17.2% CAGR through 2035. EXATEL's backbone already carries more than 150 links at 400G, as reported in March 2026.
AI Computing Sets the Next Design Standard
State-backed AI computing is changing specifications, because training clusters need lossless fabrics and much denser racks. Poland has bid for a medium-scale gigafactory, and operators are preparing halls and networks ahead of the procurement.
- Poland signed the EU joint procurement agreement in July 2026
- The government committed over PLN 400 million to AI compute purchases
- Contracts are due in early 2027 and operations in 2028
- Base Year: 2025
- Historical Period: 2019 to 2025
- Forecast Period: 2026 to 2035
- Market Size 2025 (USD million): 410.00
- Market Size 2035 (USD million): 970.62
- CAGR 2026 to 2035: 9.0 %
- CAGR by Component: Optical Transport and Transceivers: 11.4 %
- CAGR by Data Rate: 400G and Above: 17.2 %
- CAGR by End User: Cloud and Hyperscale Providers: 12.8 %
- CAGR by Region: Greater Poland (Poznan): 10.6 %
- Atman Duchnice First Building IT Capacity (Megawatts): 14.40
- Data4 Jawczyce Campus Target IT Capacity (Megawatts): 60.00
- Market Share by Region 2025: Masovia (Warsaw) (Dominant Share)
Colocation growth and AI computing are pushing buyers from older access speeds to high-speed fabrics and optical links. Masovia leads, and Greater Poland grows fastest as new capacity spreads.
Key Trends in the Poland Data Center Networking Market
The Poland data center networking market is being reshaped by campus expansion around Warsaw, state backing for AI computing, rising rack densities and carrier backbone upgrades.
1. October 2026 - Warsaw Data Center Pipeline Reaches 156 MW Planned
- Trade press reported on 21 October 2026 that Warsaw had 159 MW operational at the end of the second quarter, 5 MW under construction and 156 MW planned.
- Colocation accounted for 84% of operational capacity, with 28 facilities run by 17 companies and a colocation vacancy rate of 11.49%.
- A planned pipeline close to current capacity points to a second wave of switch, optics and cabling orders as projects reach fit-out.
- Trade press reported on 28 July 2026 that deputy minister Dariusz Standerski signed the joint procurement agreement after a government resolution earlier in the month.
- Poland is bidding for a medium-scale site starting with at least 25,000 AI accelerators, with over PLN 400 million committed by the state.
- Bids open later in 2026, awards are due in early 2027 and operation is planned for 2028.
- Polcom said on 16 July 2026 that racks which once drew 3 to 8 kW now often need 30, 50 or more than 100 kW.
- It argued that AI demand could exhaust Polish data center capacity by the end of 2026, as computing needs outpace construction.
- Higher density means more optical links per hall and stricter demands on low-latency Ethernet fabrics.
- Trade press reported on 3 April 2025 that Orange brought up its first commercial 800 Gb/s intercity link on its optical backbone.
- It plans four more 800 Gb/s routes between large cities, and already runs over 30 links at 400 Gb/s among 14 cities.
- Router-to-router links were due to move to 800 Gb/s around the turn of 2025 and 2026, lifting demand for high-speed ports.
Rising rack densities, a growing Warsaw pipeline and faster carrier backbones are the main structural forces, while grid connection delays remain the main risk to delivery schedules.
Recent Market Developments in the Poland Data Center Networking Market
Recent developments, presented from the most recent, show a new network lab in Krakow, campus openings near Warsaw, open networking at the national backbone and a new colocation building.
1. October 2026 - Cisco Opens AI Network Lab in Krakow
- Trade press reported on 14 October 2026 that Cisco opened a networking lab in Krakow to design and test infrastructure for AI and machine learning workloads.
- The lab has nearly 400 server racks and 4 MW of initial IT capacity, with 100 racks in an isolated zone for confidential customer tests.
- It sits beside Cisco's Krakow customer experience center and also trains engineers.
- Data4 announced on 9 April 2026 that its second Jawczyce data center near Warsaw adds 10 MW, within a campus target of up to 60 MW.
- The company has invested nearly EUR 200 million in Poland and plans about EUR 600 million by 2030.
- The first building recorded a PUE of 1.27 over twelve months.
- IP Infusion announced on 26 March 2026 a partnership with EXAsystems, a subsidiary of EXATEL, to offer turnkey networks built on its OcNOS software.
- Targets include public administration, telecom providers and data center operators in Poland.
- EXATEL reported more than 300 nodes on OcNOS and over 23,000 km of fiber, showing open software is moving into production.
- Trade press reported on 18 September 2025 that Atman put its first Duchnice building into use with 14.4 MW of IT capacity and about 6,300 m2 of IT space.
- The campus has a budget of PLN 2.5 billion, with six financial institutions providing a PLN 1.35 billion loan.
- Powered by renewable energy and aimed partly at AI and hyperscale tenants, it adds a large new site needing leaf and spine networks.
A new AI network lab, campus openings near Warsaw and open networking at the national backbone show vendors and operators positioning for faster fabrics and denser deployments.
Poland Data Center Networking Industry Segmentation
The Expert Market Research’s report on the Poland Data Center Networking Market offers a detailed analysis of the market based on the following segments.
Market Breakup by Component
- Ethernet Switches
- Routers
- Optical Transport and Transceivers
- Network Interface Cards
- Structured Cabling and Others
- Others
Market Breakup by Data Rate
- Up to 10G
- 25G and 40G
- 100G
- 400G and Above
- Others
Market Breakup by End User
- Colocation Providers
- Cloud and Hyperscale Providers
- Enterprises
- Telecom and Government
- Others
Market Breakup by Region
- Masovia (Warsaw)
- Lesser Poland (Krakow)
- Silesia
- Greater Poland (Poznan)
- Others
CAGR 2026 to 2035, Market by Region
- Masovia (Warsaw): 8.8 %
- Lesser Poland (Krakow): 9.8 %
- Silesia: 8.4 %
- Greater Poland (Poznan): 10.6 %
- Others (incl. Lower Silesia, Pomerania and Lodz): 8.2 %
Competition combines global switching and optical vendors, open networking software providers and local carriers that also sell connectivity. Entry barriers include product certification, channel partners and integrators, support teams in Poland, and relationships with colocation operators, carriers and public buyers.
Cisco Systems
Cisco Systems, headquartered in San Jose, California, sells Nexus data center switches, Silicon One based Cisco 8000 routers, optics and the Nexus Dashboard management software. In October 2026 it opened a networking lab in Krakow with nearly 400 racks and 4 MW of IT capacity, for customers designing AI and machine learning networks. Its Polish general manager said the company has operated in Poland for more than 30 years.
Ciena
Ciena, headquartered in Hanover, Maryland, supplies optical transport systems and coherent pluggable optics. In May 2025 EXATEL selected its WaveLogic 5 Nano 400G ZR+ pluggables for what Ciena called the first open, disaggregated architecture of its kind in Poland. The pluggables work across several router vendors and support data center interconnect over EXATEL's 23,800 km fiber network.
IP Infusion
IP Infusion, headquartered in Santa Clara, California, develops the OcNOS network operating system for open, white-box switches and routers. In March 2026 it announced a partnership with EXAsystems, a subsidiary of EXATEL, to offer turnkey networks to Polish public administration, telecom providers and data center operators. EXATEL reported more than 300 nodes running OcNOS and 400G links using Open ZR+ optics.
EXATEL
EXATEL, a Warsaw-based carrier and network services provider, operates a nationwide EVPN-MPLS network with more than 150 links at 400G and 170 at 100G, reported in March 2026. Its optical network spans over 23,000 km and reaches interconnection hubs in Germany and the Czech Republic. It serves public administration, financial institutions and telecom providers.
Other players operating in the Poland data center networking market include Nokia, Arista Networks, Juniper Networks, NVIDIA, and Orange Polska, alongside system integrators, distributors, structured cabling installers and regional resellers supplying network equipment to colocation campuses, enterprises, carriers and public buyers across Poland.
Key Insight
Competition rests on certified products, integrator and carrier relationships, local support and open networking options rather than price alone, while AI projects could reshape vendor positions.
Frequently Asked Questions: Poland Data Center Networking Market
What is the size of the Poland data center networking market in 2025?
The Poland data center networking market is valued at USD 410.00 million in 2025, supported by new colocation campuses near Warsaw, state backing for AI computing and the move towards 400G and 800G links, with Masovia as the largest region.
What is the forecast for the Poland data center networking market by 2035?
The market is forecast to reach USD 970.62 million by 2035, growing at a CAGR of 9.0 % over the 2026 to 2035 period, driven by campus build-out, rising rack densities, carrier backbone upgrades and the spread of open networking software.
Which component has the highest CAGR in the Poland data center networking market?
Optical Transport and Transceivers records the highest CAGR at an estimated 11.4% through 2035, as campuses interconnect and carriers adopt 400G and 800G coherent optics for data center links.
Which region dominates the Poland data center networking market?
Masovia (Warsaw) dominates, as the Atman Duchnice and Data4 Jawczyce campuses are both near Warsaw. Greater Poland (Poznan) is the fastest-growing region at an estimated 10.6% CAGR, helped by AI computing plans.
Who are the key players in the Poland data center networking market?
Key players include Cisco Systems, Ciena, IP Infusion, EXATEL, Nokia, Arista Networks, Juniper Networks, NVIDIA, and Orange Polska.
What is the EU AI gigafactory initiative in Poland?
It is an EU-backed programme in which private consortia build large AI computing sites. Poland signed the joint procurement agreement in July 2026 and seeks a medium-scale site starting with at least 25,000 AI accelerators.
Why is 400G adoption growing in Polish data centers?
AI and cloud traffic needs faster links, and carriers are upgrading. Orange Polska lit its first 800 Gb/s channel in April 2025, and EXATEL reported more than 150 links at 400G in March 2026.
Table of Contents
Companies Mentioned
- Cisco Systems
- Ciena
- IP Infusion
- EXATEL
- Nokia
- Arista Networks
- Juniper Networks
- NVIDIA
- Orange Polska
Table Information
| Report Attribute | Details |
|---|---|
| No. of Pages | 129 |
| Published | November 2026 |
| Forecast Period | 2025 - 2035 |
| Estimated Market Value ( USD | $ 410 Million |
| Forecasted Market Value ( USD | $ 970.62 Million |
| Compound Annual Growth Rate | 9.0% |
| Regions Covered | Poland |
| No. of Companies Mentioned | 9 |