In 2025, the market is valued at USD 380.00 million and is forecast to grow at a CAGR of 14.5%, reaching USD 1.47 billion by 2035. Growth is driven by cloud region expansion, demand for artificial intelligence computing and grid allocations for large campuses around Warsaw, Poznan and Silesia.
Market Overview
The Poland hyperscale data center market is moving from a handful of Warsaw buildings towards multi-building campuses sized in tens and hundreds of megawatts. Cloud providers, artificial intelligence operators and wholesale developers are competing for the same limited grid connections, so power access now decides where capacity is built.
Three forces shape the market: public cloud regions that keep adding capacity, artificial intelligence workloads that need rack densities far above conventional colocation, and grid planning that allows large new loads. In February 2026 the grid operator's draft plan pointed to about 3 GW of data center connection capacity by the middle of the next decade.
In February 2025 Microsoft committed PLN 2.8 billion to Polish cloud and AI infrastructure by June 2026, and in April 2026 Data4 opened a second Warsaw-area building. In August 2026 trade press reported that applications to the grid operator had fallen to about a dozen after new deposit rules, filtering out speculative filings.
Key Market Trends and Insights
- Grid plan opens headroom: The grid operator's draft development plan, reported in February 2026, assumes data centers could reach about 3 GW of connection capacity by 2036, against roughly 200 MW installed today.
- Speculation clears out: Trade press reported in August 2026 that connection applications fell from 150 GW to 200 GW to about a dozen, while conditions above 6 GW were already issued to serious projects.
- Campus scale rises: Atman opened the first 14.4 MW building of its 43 MW Warsaw-3 campus in October 2025, and Data4 added a 10 MW building at Jawczyce in April 2026.
- Economic weight grows: The Polish Data Centre Association reported in June 2026 that data centers generated PLN 10.6 billion of gross value added and PLN 4.3 billion of fiscal revenue in 2025.
The market is shifting from single Warsaw buildings towards campuses where wholesale operators, cloud providers and artificial intelligence specialists share large power allocations. Wholesale colocation still carries most revenue, while build-to-suit campuses advance fastest as hyperscalers prefer to pre-lease whole halls. Cloud service providers lead demand, and artificial intelligence and high-performance computing operators grow quickest as dense GPU clusters need liquid cooling and high-density racks. Campuses above 100 MW expand fastest, although grid timing remains the main constraint. Masovia remains the largest region because of fibre density and existing cloud regions, while Silesia gains share as new developers target industrial land with available connections. Heat recovery, renewable supply and district heating links point to a durable infrastructure build-out rather than a short cycle.
Key Metrics
- Market Size 2025: USD 380.00 million
- Projected Market Size 2035: USD 1.47 billion
- CAGR 2026 to 2035: 14.5%
- Fastest-Growing Deployment Model: Build-to-Suit Campuses: 17.8% CAGR
- Fastest-Growing End User: AI and HPC Operators: 19.6% CAGR
- Largest Revenue Segment 2025: Wholesale Colocation
- Dominant Region: Masovia (Warsaw)
- Highest CAGR by Region: Silesia: 18.1%
- Data center economic output in Poland, 2025: PLN 10.6 billion gross value added
- Base Market Amount 2025: USD 380.00 million
Grid Allocations Unlock a Larger Market
Revenue is on course to rise nearly fourfold, from USD 380.00 million in 2025 to USD 1.47 billion in 2035 at a 14.5% CAGR. The grid operator's February 2026 draft plan assumes about 3 GW of data center capacity by 2036, far above the roughly 200 MW installed today.
AI Workloads and Large Campuses Lead Growth
Cloud service providers hold the largest demand, but AI and HPC Operators grow at an estimated 19.6% CAGR and campuses above 100 MW at an estimated 21.5% CAGR through 2035. Beyond.pl set a 150 MW target for its Poznan AI Factory in May 2025, and WBS Power outlined a 3.2 GW Baltic campus in March 2026.
Power Access Decides Where Capacity Lands
Warsaw remains the largest hub, yet limited grid headroom around the capital is pushing developers to Poznan, Silesia and the north. Deposit rules introduced for connection requests removed most speculative filings, leaving a smaller group of funded projects.
- Conditions above 6 GW were issued to about a dozen projects by August 2026
- Recovered heat could exceed 7% of district heating supply by 2030
- Poland signed the AI gigafactory procurement agreement in July 2026
- Base Year: 2025
- Historical Period: 2019 to 2025
- Forecast Period: 2026 to 2035
- Market Size 2025 (USD million): 380.00
- Market Size 2035 (USD million): 1,471.76
- CAGR 2026 to 2035: 14.5 %
- CAGR by Deployment Model: Build-to-Suit Campuses: 17.8 %
- CAGR by End User: AI and HPC Operators: 19.6 %
- CAGR by Campus Capacity: Above 100 MW: 21.5 %
- CAGR by Region: Silesia: 18.1 %
- Data Center Gross Value Added 2025 (PLN Billion): 10.60
- Data4 Jawczyce Campus Planned Capacity (MW): 60.00
- Market Share by Region 2025: Masovia (Warsaw) (Dominant Share)
Demand is shifting towards large campuses and artificial intelligence capacity as grid planning opens headroom. Masovia leads on fibre and cloud density, while Silesia grows fastest.
Key Trends in the Poland Hyperscale Data Center Market
The Poland hyperscale data center market is being reshaped by grid reform, artificial intelligence campuses, cloud region investment and the growing value of recovered heat.
1. September 2026 - Hillwood Redesigns Planned Reguly Data Center Campus After Local Objections
- Trade press reported on 15 September 2026 that Hillwood Polska moved the planned buildings away from homes and reduced their scale.
- The revised plan adds a wider green buffer at the site in Michalowice municipality near Warsaw.
- Local acceptance is becoming a gating item for campuses near the capital, which favours sites with industrial zoning.
- Trade press reported on 24 August 2026 that new deposit and application fees cut earlier requests of 150 GW to 200 GW to about a dozen.
- PSE has issued roughly a dozen connection conditions for data centers, totalling over 6 GW across the country.
- A smaller, funded pipeline improves planning certainty for operators that already hold connection conditions.
- Poland signed the joint procurement agreement on 28 July 2026, a key step towards hosting an EU-backed medium-scale facility.
- The facility would start with at least 25,000 accelerators and expand to at least 75,000, with operation scheduled for 2028.
- Potential investment above PLN 10 billion could anchor a large new campus, with the site chosen by the winning consortium.
- The draft Transmission Network Development Plan for 2027 to 2036, reported on 10 February 2026, forecasts about 3 GW for data centers.
- Data center electricity use is projected to reach 17 TWh to 18 TWh a year by the mid-2030s, from about 1.7 TWh to 1.8 TWh.
- The plan includes about 140 substations and HVDC lines, so delivery of grid works will set the pace.
Grid reform, artificial intelligence campuses and community scrutiny are the main structural forces, while connection timing and local acceptance remain the main risks to the build-out.
Recent Market Developments in the Poland Hyperscale Data Center Market
Recent developments, presented from the most recent, show new campus phases, large artificial intelligence projects, a Silesian development and cloud investment commitments.
1. April 2026 - Data4 Opens Second Building at Jawczyce Campus Near Warsaw
- Data4 announced on 9 April 2026 a new 10 MW IT building at Jawczyce in Ozarow Mazowiecki municipality, within a campus planned at 60 MW.
- It has invested EUR 200 million in Poland and plans about EUR 600 million by 2030.
- The building is its first in Europe designed to BREEAM Excellent, and the first Jawczyce building reported a PUE of 1.27.
- WBS Power said on 23 March 2026 it is advancing a 3.2 GW campus at Lublewo, in Choczewo municipality, in four phases of 800 MW.
- The project says it holds grid connection conditions for the entire capacity, with the first centre expected between 2028 and 2029.
- Energy supply is planned to start conventional, add renewables and storage, and later include nuclear power.
- Trade press reported on 2 February 2026 that DL Invest, with partner Boosteroid, plans a Silesian project of over 50 MW.
- Long-term potential reaches 200 MW, with capital expenditure of about USD 1 billion.
- The plan places a large artificial intelligence and cloud campus in an industrial region rather than in Warsaw.
- Atman opened the first building of WAW-3 in October 2025, offering 14.4 MW of IT power across 12 data halls.
- The three-building campus is planned at 43 MW with a target investment of PLN 2.5 billion and a PLN 1.35 billion loan.
- Each building has two 20 MW power lines, closed-loop cooling and renewable electricity backed by guarantees of origin.
New campus phases, a very large Baltic proposal and a Silesian project show developers securing power early and spreading capacity beyond the capital through the forecast period.
Poland Hyperscale Data Center Industry Segmentation
The Expert Market Research’s report on the Poland Hyperscale Data Center Market offers a detailed analysis of the market based on the following segments.
Market Breakup by Deployment Model
- Wholesale Colocation
- Build-to-Suit Campuses
- Hyperscaler Self-Build
- Others
Market Breakup by End User
- Cloud Service Providers
- AI and HPC Operators
- Financial Services and Insurance
- Government, Telecom and Others
- Others
Market Breakup by Campus Capacity
- Up to 20 MW
- 20 MW to 50 MW
- 50 MW to 100 MW
- Above 100 MW
- Others
Market Breakup by Region
- Masovia (Warsaw)
- Lesser Poland (Krakow)
- Silesia
- Greater Poland (Poznan)
- Others
CAGR 2026 to 2035, Market by Region
- Masovia (Warsaw): 12.9 %
- Lesser Poland (Krakow): 15.2 %
- Silesia: 18.1 %
- Greater Poland (Poznan): 16.4 %
- Others (incl. Pomerania and Lower Silesia): 15.8 %
Competition combines Polish colocation specialists, European and global campus developers and hyperscale cloud providers. Entry barriers include grid connection conditions, land with industrial zoning, financing, cooling design for dense racks and long-term leases with cloud tenants.
Atman
Atman, headquartered in Warsaw, operates carrier-neutral data centers and cloud services in Poland. In October 2025 it opened the first building of its Warsaw-3 campus at Duchnice near Ozarow Mazowiecki, offering 14.4 MW of IT power, with 43 MW planned across three buildings. The project carries a target investment of PLN 2.5 billion, financed partly by a PLN 1.35 billion loan, and runs on renewable electricity.
Data4
Data4, headquartered in Paris, develops and operates data center campuses across Europe, including two buildings near Warsaw. On 9 April 2026 it announced a second 10 MW building at Jawczyce in Ozarow Mazowiecki municipality, within a campus planned at 60 MW. The company has invested EUR 200 million in Poland and plans about EUR 600 million by 2030, with the new building designed to BREEAM Excellent.
Beyond.pl
Beyond.pl, headquartered in Poznan and owned by Kulczyk Investments, runs colocation and cloud data centers in Greater Poland. In May 2025 it launched its AI Factory, offering GPU colocation of up to 140 kW per rack, as the first stage of a campus with a 150 MW target. The facility is planned to host Nvidia computing platforms and to use renewable energy.
Microsoft
Microsoft, headquartered in Redmond, Washington, operates hyperscale cloud capacity in Poland. In February 2025 it announced about PLN 2.8 billion of investment, about USD 704 million, to expand cloud and AI infrastructure in the country by June 2026. It is also working with the Polish defence ministry on a cybersecurity framework and switching backup generators from diesel to renewable biofuels.
Other players operating in the Poland hyperscale data center market include Google Cloud, Vantage Data Centers, Equinix, Exea Data Center, and Polcom, alongside regional colocation providers, telecom operators, enterprise-owned halls and new campus developers supplying capacity to cloud, finance, government and artificial intelligence tenants across Poland.
Key Insight
Competition rests on secured grid connections, financing strength and tenant relationships rather than price alone, while new entrants with large power allocations could reshape positions.
Frequently Asked Questions: Poland Hyperscale Data Center Market
What is the size of the Poland hyperscale data center market in 2025?
The Poland hyperscale data center market is valued at USD 380.00 million in 2025, supported by cloud region expansion, demand for artificial intelligence computing and grid allocations for large campuses, with Masovia as the largest region.
What is the forecast for the Poland hyperscale data center market by 2035?
The market is forecast to reach USD 1.47 billion by 2035, growing at a CAGR of 14.5 % over the 2026 to 2035 period, driven by hyperscale cloud investment, artificial intelligence workloads, heat recovery opportunities and a draft grid plan that allows several gigawatts of new load.
Which campus capacity band has the highest CAGR in the Poland hyperscale data center market?
Campuses Above 100 MW record the highest CAGR at an estimated 21.5% through 2035, as artificial intelligence clusters and build-to-suit leases favour very large, pre-permitted power allocations.
Which region dominates the Poland hyperscale data center market?
Masovia, centred on Warsaw, dominates thanks to fibre density, cloud regions and the Atman and Data4 campuses. Silesia is the fastest-growing region at an estimated 18.1% CAGR, helped by new industrial-site projects.
Who are the key players in the Poland hyperscale data center market?
Key players include Atman, Data4, Beyond.pl, Microsoft, Google Cloud, Vantage Data Centers, Equinix, Exea Data Center, and Polcom.
What is the Poland AI gigafactory initiative?
It is an EU-backed programme for large artificial intelligence computing sites. Poland signed the joint procurement agreement in July 2026 and bids for a medium-scale facility of at least 25,000 accelerators, scheduled for operation in 2028.
Why are data center connection requests in Poland falling?
New deposit and application fees removed speculative filings. Trade press reported in August 2026 that requests fell from 150 GW to 200 GW to about a dozen, while conditions above 6 GW had been issued.