In 2025, the market is valued at USD 1.15 billion and is forecast to grow at a CAGR of 11.5%, reaching USD 3.42 billion by 2035. Growth is driven by AI-ready campuses such as Ascenty's 150 MW expansion announced in May 2026, the Redata tax regime signed into law on 15 September 2026 and the move towards 400 and 800 Gbps links.
Market Overview
The Brazil data center networking market is being rebuilt around artificial intelligence. Operators are moving from 100 Gbps leaf and spine fabrics to 400 and 800 Gbps links, liquid-cooled halls and fiber-only cabling, while a new federal tax regime promises cheaper imported and locally built equipment.
Three forces are shaping demand: campus-scale projects that need thousands of switch ports, with Elea targeting 1.5 GW at Rio AI City; a shift of capacity beyond São Paulo to Fortaleza, Rio de Janeiro and Rio Grande do Sul; and local manufacturing, with Cisco saying about 55% of its Brazil sales are equipment made in Brazil.
On 28 May 2026 Ascenty announced USD 1.2 billion for 150 MW of pre-leased AI capacity, and on 15 September 2026 President Lula signed Lei 15.504, creating Redata. In April 2026 Equinix opened its SP6 campus in Santana de Parnaíba, designed without copper cabling in active infrastructure.
Key Market Trends and Insights
- AI campus build-out: Ascenty said on 28 May 2026 that its 150 MW of new AI data centers are fully pre-leased, each hall needing dense, high-speed switching and optical links.
- Faster link speeds: Cisco Brasil said at its 1 April 2026 customer event that some Brazilian projects already run connections above 400 and 800 Gbps.
- Tax regime for equipment: Redata, signed on 15 September 2026, exempts data centers from import tax, PIS/Cofins and IPI, with an estimated fiscal cost of R$ 7.25 billion over three years.
- Capacity moves beyond São Paulo: Elea announced USD 550 million for Rio AI City on 8 June 2026, and ByteDance's Pecém project in Ceará began construction in January 2026.
The market is shifting from 100 Gbps fabrics towards 400 and 800 Gbps Ethernet and dense optical interconnect designed for GPU clusters. Ethernet switches lead in value because every rack, row and hall needs a fabric, while optical interconnect and transceivers advance fastest as link speeds rise. Colocation and wholesale operators remain the largest buyers, yet hyperscale and cloud projects grow quickest as large AI campuses reach construction. Southeast Brazil remains the largest region, and Northeast Brazil grows quickest on new submarine cable, power and campus projects around Fortaleza and Pecém. Local assembly, the Redata tax regime and liquid-cooled halls point to a durable change in procurement and design, not a short cycle of upgrades.
Key Metrics
- Market Size 2025: USD 1.15 billion
- Projected Market Size 2035: USD 3.42 billion
- CAGR 2026 to 2035: 11.5%
- Fastest-Growing Product Type: Optical Interconnect and Transceivers: 14.2% CAGR
- Fastest-Growing Port Speed: 800 GbE and Above: 22.8% CAGR
- Largest Revenue Segment 2025: Ethernet Switches
- Dominant Region: Southeast Brazil
- Highest CAGR by Region: Northeast Brazil: 16.4%
- Redata law signed: 15 September 2026
- Base Market Amount 2025: USD 1.15 billion
AI Campuses Turn Networking Into a Core Budget Line
Revenue is on course to expand almost threefold, from USD 1.15 billion in 2025 to USD 3.42 billion in 2035 at an 11.5% CAGR. Ascenty's 150 MW of pre-leased capacity, Elea's 1.5 GW plan and Scala's 5 GW authorization each require thousands of switch and optical ports.
Optical and Ultra-Fast Ports Lead Growth
Ethernet Switches hold the largest share, but Optical Interconnect and Transceivers grows at an estimated 14.2% CAGR and 800 GbE and Above at an estimated 22.8% CAGR through 2035. Cisco's 102.4 Tbps Silicon One G300, unveiled in February 2026, shows where switch silicon is heading.
Redata and Local Content Reshape Procurement
Redata exempts qualifying data centers from federal import and production taxes, but it still needs regulation, and vendors are positioning around local manufacturing and domestic processing quotas.
- Providers must direct at least 10% of processing to the domestic market
- Cisco says about 55% of its Brazil sales are locally made equipment
- Dell reports more than 90% of equipment it sells in Brazil is built locally
- Base Year: 2025
- Historical Period: 2019 to 2025
- Forecast Period: 2026 to 2035
- Market Size 2025 (USD billion): 1.15
- Market Size 2035 (USD billion): 3.42
- CAGR 2026 to 2035: 11.5 %
- CAGR by Product Type: Optical Interconnect and Transceivers: 14.2 %
- CAGR by Port Speed: 800 GbE and Above: 22.8 %
- CAGR by Facility Type: Hyperscale and Cloud Providers: 15.1 %
- CAGR by Region: Northeast Brazil: 16.4 %
- Ascenty AI Capacity Announced May 2026 (Megawatts): 150
- Equinix SP6 Investment, April 2026 (USD Million): 114
- Market Share by Region 2025: Southeast Brazil (Dominant Share)
Demand is shifting to faster Ethernet fabrics and optical links as AI halls are built. Southeast Brazil leads, while Northeast Brazil grows fastest on new campus and cable projects.
Key Trends in the Brazil Data Center Networking Market
The Brazil data center networking market is being reshaped by a new tax regime, AI campus pre-leasing, faster link speeds and local manufacturing of servers and network equipment.
1. September 2026 - Lula Signs Redata, Exempting Data Centers From Federal Import and Production Taxes
- Trade press reported that the president signed the regime on 15 September 2026 as Lei 15.504, covering import tax, PIS/Cofins and IPI.
- Participants must send at least 10% of data processing to the domestic market and use renewable or low-carbon power.
- The Senate report estimated a fiscal cost of R$ 7.25 billion over three years, and the regime still awaits regulation.
- Ascenty said on 28 May 2026 that Sumaré 3 starts at 90 MW, with Vinhedo 3 at 80 MW and Vinhedo 2 growing from 50 MW to 80 MW.
- Sumaré 3 uses direct liquid cooling, construction began in March 2026 and delivery is planned for the third quarter of 2027.
- The operator links 40 sites across four countries over a proprietary 4,000 km fiber network.
- At the 1 April 2026 event in São Paulo, president Ricardo Mucci said demand for data center renewal, backbone and interconnection upgrades was rising.
- Cisco said some Brazilian projects already use links above 400 and 800 Gbps, and about 55% of its Brazil sales are locally made equipment.
- Mucci supported Redata but asked that it cover local production inputs.
- Trade press reported on 21 January 2026 that Dell began local production of the PowerEdge XE7745, developed with AMD.
- Dell said more than 90% of the equipment it sells in Brazil is now built locally, which improves logistics and support.
- Local server output pulls through top-of-rack and leaf switch demand.
Tax relief, pre-leased AI halls, faster link speeds and local manufacturing are the main structural forces, while power access and regulation timing remain the main risks to rollout.
Recent Market Developments in the Brazil Data Center Networking Market
Recent developments, presented from the most recent, show new campuses in Rio de Janeiro and Ceará, an AI-ready Equinix facility and expanding submarine cable connectivity in Fortaleza.
1. June 2026 - Elea Announces USD 550 Million for Rio AI City in Rio de Janeiro
- Trade press reported on 8 June 2026 that the first phase follows I Squared Capital's acquisition of Elea Data Centers.
- The Parque Olímpico hub starts at 1.5 GW and aims for up to 3 GW by 2032.
- Operating site RJO1 already runs, and each new hall adds leaf, spine and optical equipment needs.
- Trade press reported on 18 May 2026 a R$ 10 billion, 20-year energy supply deal linked to the 630 MW Ibiapaba wind complex.
- Construction at the Pecém port complex in Ceará began in January 2026, with first operations expected in the third quarter of 2027.
- The project is described as the largest data center under development in Brazil, which brings hyperscale network demand to the Northeast.
- The USD 114 million campus opened in April 2026 with 12 server rooms, four operating at launch, and room for GPU racks of 200 kW to 500 kW.
- Copper cabling has largely been removed from active infrastructure, and dedicated fiber links SP6 to SP4 in Barueri.
- Fiber-first design raises transceiver content per rack.
- Trade press reported on 12 March 2026 that Angola Cables wants access to the state backbone run by Etice in Fortaleza.
- The aim is to reach strategic sites including the export processing zone at the Port of Pecém.
- Angola Cables already runs two submarine cable systems and the Angonap data center in Fortaleza.
New campuses in Rio de Janeiro and Ceará, a fiber-first Equinix site and expanding cable access in Fortaleza show buyers placing larger network orders outside the traditional São Paulo core.
Brazil Data Center Networking Industry Segmentation
The Expert Market Research’s report on the Brazil Data Center Networking Market offers a detailed analysis of the market based on the following segments.
Market Breakup by Product Type
- Ethernet Switches
- Routers
- Optical Interconnect and Transceivers
- Network Management Software and Services
- Others
Market Breakup by Port Speed
- Up to 25 GbE
- 100 GbE
- 200 and 400 GbE
- 800 GbE and Above
- Others
Market Breakup by Facility Type
- Colocation and Wholesale Operators
- Hyperscale and Cloud Providers
- Enterprise and Government
- Telecom Operators and Edge
- Others
Market Breakup by Region
- Southeast Brazil
- South Brazil
- Northeast Brazil
- Central-West and North Brazil
- Others
CAGR 2026 to 2035, Market by Region
- Southeast Brazil: 10.8 %
- South Brazil: 13.4 %
- Northeast Brazil: 16.4 %
- Central-West and North Brazil: 9.6 %
Competition combines global network vendors, optical and cabling specialists and server makers that bundle switching, sold directly and through integrators to colocation operators, cloud providers and enterprises. Entry barriers include 400 and 800 Gbps silicon, local production, integrator reach and operator qualification.
Cisco
Cisco Systems, headquartered in San Jose, California, sells Nexus data center switches, Silicon One routers and security software. At Cisco Connect Brasil on 1 April 2026 its Brazil president said some projects already run links above 400 and 800 Gbps, and that about 55% of local sales are equipment made in Brazil. In February 2026 Cisco unveiled the Silicon One G300, a 102.4 Tbps chip for its N9000 switches and 8000 routers.
Huawei
Huawei Technologies, headquartered in Shenzhen, China, supplies data center switches, optical transport and the UnifiedBus interconnect for its Atlas and TaiShan SuperPoD clusters, shown outside China for the first time at MWC Barcelona in March 2026. Trade press reported in July 2025 that Huawei Cloud runs a São Paulo region with three availability zones plus edge sites in Fortaleza and Rio de Janeiro, and calls Brazil its largest cloud market outside China.
Hewlett Packard Enterprise
Hewlett Packard Enterprise, headquartered in Houston, Texas, sells HPE Aruba Networking CX data center switches alongside Juniper routing and switching. It introduced the CX 10040 to Brazil at a client event in São Paulo on 5 June 2025, with an integrated firewall, inline encryption and telemetry. Brazilian customers have also deployed the earlier CX 10000 as a top-of-rack switch.
Lightera
Lightera is the optical fiber brand of the Furukawa Electric Group, launched globally on 3 April 2025 and run from Norcross, Georgia, while the group holding company remains in Japan. Its Curitiba factory can produce cables of up to 1,728 fibers, though Brazilian demand mostly calls for up to 288 fibers. The company said it is preparing for data center demand and studying hollow core fibers.
Other players operating in the Brazil data center networking market include Arista Networks, Nokia, Dell Technologies, Ascenty, and Equinix, alongside integrators, local assemblers, carrier-neutral interconnection providers and optical component suppliers serving colocation operators, cloud providers, telecom carriers and enterprises across Brazil.
Key Insight
Competition rests on high-speed silicon, local production, integrator reach and operator qualification rather than price alone, while tax rules and AI campus awards could reshape positions.
Frequently Asked Questions: Brazil Data Center Networking Market
What is the size of the Brazil data center networking market in 2025?
The Brazil data center networking market is valued at USD 1.15 billion in 2025, supported by AI-ready campuses, faster 400 and 800 Gbps links, local equipment production and the Redata tax regime, with Southeast Brazil as the largest region.
What is the forecast for the Brazil data center networking market by 2035?
The market is forecast to reach USD 3.42 billion by 2035, growing at a CAGR of 11.5 % over the 2026 to 2035 period, driven by pre-leased AI capacity, fiber-first facility design, capacity spreading beyond São Paulo and tax relief on equipment.
Which product type has the highest CAGR in the Brazil data center networking market?
Optical Interconnect and Transceivers records the highest CAGR at an estimated 14.2% through 2035, as fiber-only halls and 400 and 800 Gbps links raise optical content per rack.
Which region dominates the Brazil data center networking market?
Southeast Brazil dominates, through the São Paulo state corridors and Rio de Janeiro. Northeast Brazil is the fastest-growing region at an estimated 16.4% CAGR, helped by the Pecém project and Fortaleza cable landings.
Who are the key players in the Brazil data center networking market?
Key players include Cisco, Huawei, Hewlett Packard Enterprise, Lightera, Arista Networks, Nokia, Dell Technologies, Ascenty, and Equinix.
What is Redata?
Redata is Brazil's special tax regime for data centers, signed as Lei 15.504 on 15 September 2026. It exempts import tax, PIS/Cofins and IPI for participants who use clean power and send at least 10% of processing to the domestic market.
Why are Brazilian data centers moving to 400 and 800 Gbps networking?
AI clusters need very high bandwidth between accelerators. Cisco said on 1 April 2026 that some Brazilian projects already use links above 400 and 800 Gbps, and its G300 chip targets 102.4 Tbps switches.
Table of Contents
Companies Mentioned
- Cisco
- Huawei
- Hewlett Packard Enterprise
- Lightera
- Arista Networks
- Nokia
- Dell Technologies
- Ascenty
- Equinix
Table Information
| Report Attribute | Details |
|---|---|
| No. of Pages | 104 |
| Published | November 2026 |
| Forecast Period | 2025 - 2035 |
| Estimated Market Value ( USD | $ 1.15 Billion |
| Forecasted Market Value ( USD | $ 3.42 Billion |
| Compound Annual Growth Rate | 11.5% |
| Regions Covered | Brazil |
| No. of Companies Mentioned | 9 |