In 2025, the market is valued at USD 320.00 million and is forecast to grow at a CAGR of 11.5%, reaching USD 950.38 million by 2035. Growth is driven by Taipower grid connection requests for 4,523 MW of data center load by 31 July 2026, record 800G switch shipments and the move of AI clusters to 1.6T fabrics.
Market Overview
The Taiwan data center networking market is shifting from conventional leaf-spine fabrics towards AI back-end networks. Local manufacturers lead global switch supply, while domestic demand now rises with new AI facilities in Taoyuan, Taichung and Tainan.
Three forces are shaping the market: grid access, since Taipower holds data center connection requests of 4,523 MW; accelerating port speeds, as Edgecore launched 102.4T switches in February 2026; and operator investment, with Chunghwa Telecom opening a Taoyuan AI data center in August 2026.
In December 2025 the National Center for High-Performance Computing opened a 15 MW cloud computing center in Tainan, and in June 2026 Taiwan Mobile signed an AI data center memorandum with GMI Cloud at Computex.
Key Market Trends and Insights
- Grid-gated demand: Taipower reported 75 transmission-level data center requests totalling 4,523 MW on 31 July 2026, showing intent far above connected capacity of 303.5 MW.
- Record 800G supply: Accton reported record second-quarter 2026 revenue of NT$95.54 billion, driven by optical communications and 800G switches for data center customers.
- Operator build-out: Chunghwa Telecom began operating a Lunping AI data center in Taoyuan on 5 August 2026, which may add up to 36 MW at full build-out.
- Sovereign AI compute: The 15 MW National Center for High-Performance Computing facility opened in Tainan in December 2025 and houses 1,760 H200 GPUs plus 144 GB200 chips.
The market is moving from 100G and 400G leaf-spine designs towards 800G and 1.6T fabrics built for AI training clusters. Switches lead in value because every rack needs several tiers, while optical transport and transceivers grow quickest as links lengthen and speeds climb. Hyperscale cloud providers remain the largest buyers, and AI cloud and research computing advance fastest. Northern Taiwan stays the largest region, and Central Taiwan grows quickest as new capacity moves beyond the Taipei and Taoyuan corridor. Co-packaged optics, open networking and liquid-cooled racks point to a lasting change in product mix rather than a cyclical uplift, although power access remains the main brake on timing.
Key Metrics
- Market Size 2025: USD 320.00 million
- Projected Market Size 2035: USD 950.38 million
- CAGR 2026 to 2035: 11.5%
- Fastest-Growing Product Type: Optical Transport and Transceivers: 14.1% CAGR
- Fastest-Growing Data Rate: 1.6T and Above: 21.8% CAGR
- Largest Revenue Segment 2025: Switches
- Dominant Region: Northern Taiwan (Taipei, New Taipei, Taoyuan)
- Highest CAGR by Region: Central Taiwan (Taichung): 13.6%
- Taipower data center connection requests, 31 July 2026: 4,523 MW
- Base Market Amount 2025: USD 320.00 million
Grid Access Sets the Pace of Network Spending
Revenue is on course to nearly triple, from USD 320.00 million in 2025 to USD 950.38 million in 2035 at an 11.5% CAGR. Taipower has agreed to 3,331 MW of requests, yet only 303.5 MW is connected, so equipment orders follow each energization.
Optics and 1.6T Fabrics Lead Growth
Switches hold the largest share, but Optical Transport and Transceivers grow at an estimated 14.1% CAGR and 1.6T and Above at an estimated 21.8% CAGR through 2035. Edgecore's 102.4T platforms of February 2026 and Delta's 51.2T co-packaged optics switch of May 2025 show local suppliers ready.
Telecom and Sovereign Projects Widen the Buyer Base
Hyperscalers lead purchasing, yet local operators and public programmes now commission facilities of their own, adding demand for routing, interconnect and cabling beyond the cloud giants.
- Chunghwa Telecom opened its Lunping AI data center in August 2026
- Taiwan Mobile signed a GMI Cloud memorandum in June 2026
- Google received approval for NT$27 billion more investment in April 2026
- Base Year: 2025
- Historical Period: 2019 to 2025
- Forecast Period: 2026 to 2035
- Market Size 2025 (USD million): 320.00
- Market Size 2035 (USD million): 950.38
- CAGR 2026 to 2035: 11.5 %
- CAGR by Product Type: Optical Transport and Transceivers: 14.1 %
- CAGR by Data Rate: 1.6T and Above: 21.8 %
- CAGR by End User: AI Cloud and Research Computing: 16.9 %
- CAGR by Region: Central Taiwan (Taichung): 13.6 %
- Taipower Data Center Requests 31 July 2026 (Megawatts): 4523
- Contracted Data Center Capacity Receiving Power (Megawatts): 303.5
- Market Share by Region 2025: Northern Taiwan (Taipei, New Taipei, Taoyuan) (Dominant Share)
Demand is moving to faster port speeds and optical links as AI clusters replace conventional fabrics, while grid access gates timing. Northern Taiwan leads, and Central Taiwan grows fastest.
Key Trends in the Taiwan Data Center Networking Market
The Taiwan data center networking market is being reshaped by AI-ready switch launches, record supplier shipments, grid connection limits and new operator facilities.
1. August 2026 - Chunghwa Telecom Opens Lunping AI Data Center in Taoyuan
- Chunghwa Telecom said on 5 August 2026 that its newly built Lunping facility had begun operating, with up to 36 MW possible at full build-out.
- Its second-quarter 2026 internet data center revenue rose 14%, helped by installation projects for manufacturing customers.
- A telecom-owned AI facility adds demand for switching, routing and optical interconnect inside and between its sites.
- Taipower data cited in August 2026 showed it held 75 transmission-level requests totalling 4,523 MW as of 31 July 2026.
- Taipower agreed to 47 requests for 3,331 MW, but about 40% of those expired because applicants missed the formal application step.
- Only 303.5 MW is connected across four sites, so network equipment orders will follow energization rather than announcements.
- Accton reported on 7 July 2026 June revenue of NT$39.56 billion, up 61.16% from June 2025, its third straight monthly record.
- Second-quarter 2026 revenue reached NT$95.54 billion, with optical communications the strongest driver.
- Demand for 800G switches from data center customers was described as stable, supporting the shift to higher port speeds.
- Edgecore Networks announced on 23 February 2026 two switches built on Broadcom Tomahawk 6 silicon.
- The AIS1600-64O offers 64 ports of 1.6T and the AIS800-128O offers 128 ports of 800G.
- Open software options let operators avoid single-vendor lock-in when building AI back-end networks.
Faster port speeds, optical links and open networking are the main structural forces, while grid access and power approvals remain the main risk to the timing of purchases.
Recent Market Developments in the Taiwan Data Center Networking Market
Recent developments, presented from the most recent, show sovereign and operator facilities, a Computex partnership, regulatory approval for hyperscaler investment and co-packaged optics.
1. June 2026 - Taiwan Mobile Signs AI Data Center Memorandum with GMI Cloud
- Taiwan Mobile announced the memorandum at Computex 2026 on 7 June 2026, aimed at AI data center offerings in several overseas regions.
- GMI Cloud has described a USD 500 million Taiwan AI facility with 7,000 NVIDIA Blackwell GPUs, 96 racks and 16 MW of power.
- Dense GPU racks of that scale need large 800G scale-out fabrics, which supports switch and optics demand.
- Cisco senior vice president Jeremy Foster delivered the company's first Computex keynote on 1 June 2026, titled A Full Stack Approach to AI.
- The session focused on moving AI from proof of concept to mission-critical use in enterprises.
- Enterprise and campus buyers in Taiwan therefore remain a target for secure, managed data center networking.
- The Ministry of Economic Affairs approved two Google applications on 22 April 2026, allowing up to NT$27 billion of further investment.
- The expansion covers data processing and semiconductor-related business, according to the ministry announcement.
- Continued hyperscaler investment sustains demand for high-speed switching in Taiwan's existing cloud sites.
- The National Center for High-Performance Computing opened its Tainan facility on 12 December 2025 with 15 MW of installed power.
- It hosts the Nano 4 system with 1,760 NVIDIA H200 GPUs and 144 Blackwell chips in GB200 NVL72 racks.
- A public AI supercomputer anchors southern Taiwan demand for fabrics, optics and cabling.
Sovereign compute, operator facilities and continued hyperscaler approvals show buyers committing to AI-ready network fabrics, with demand spreading beyond the northern corridor over the forecast period.
Taiwan Data Center Networking Industry Segmentation
The Expert Market Research’s report on the Taiwan Data Center Networking Market offers a detailed analysis of the market based on the following segments.
Market Breakup by Product Type
- Switches
- Routers
- Optical Transport and Transceivers
- Structured Cabling
- Others
Market Breakup by Data Rate
- 100G and Below
- 200G and 400G
- 800G
- 1.6T and Above
- Others
Market Breakup by End User
- Hyperscale Cloud Providers
- Colocation and Telecom Operators
- Enterprise and Government
- AI Cloud and Research Computing
- Others
Market Breakup by Region
- Northern Taiwan (Taipei, New Taipei, Taoyuan)
- Hsinchu
- Central Taiwan (Taichung)
- Southern Taiwan (Tainan, Kaohsiung)
- Others
CAGR 2026 to 2035, Market by Region
- Northern Taiwan (Taipei, New Taipei, Taoyuan): 10.4 %
- Hsinchu: 11.8 %
- Central Taiwan (Taichung): 13.6 %
- Southern Taiwan (Tainan, Kaohsiung): 12.7 %
- Others (incl. Eastern Taiwan and offshore islands): 8.9 %
Competition combines Taiwanese contract manufacturers and open-networking specialists, global switching and routing brands, and local telecom operators that also run facilities. Entry barriers include silicon access, hyperscaler qualification, optical expertise and the ability to ship under tight grid-driven schedules.
Accton Technology Corporation
Accton Technology Corporation, headquartered in Hsinchu, makes network switches, optical communications products and integrated rack solutions, and owns Edgecore Networks. In February 2026 Edgecore launched 102.4T open switches on Broadcom Tomahawk 6 silicon. Accton reported record second-quarter 2026 revenue of NT$95.54 billion and first-half 2026 revenue of NT$165.66 billion, driven by hyperscale demand, 800G switches and optical products.
Delta Electronics
Delta Electronics, headquartered in Taipei, supplies power and thermal systems as well as networking products through its Delta Networks unit. In May 2025 it showed a 51.2T co-packaged optics Ethernet switch built on Broadcom Tomahawk 5 silicon, with more than 30% power savings versus pluggable designs, offered in air-cooled and liquid-cooled forms and ready for deployment.
Chunghwa Telecom
Chunghwa Telecom, Taiwan's largest telecom operator, headquartered in Taipei, runs internet data centers, cloud services and optical networks. On 5 August 2026 it began operating its Lunping AI data center in Taoyuan, with up to 36 MW at full build-out, and in July 2026 it signed a colocation memorandum with the Taiwan Stock Exchange for a Taichung AI data center. Its second-quarter 2026 internet data center revenue rose 14%.
Cisco Systems
Cisco Systems, headquartered in San Jose, United States, sells data center switching, routing, optical and security products and has a Taiwan subsidiary serving enterprise, operator and cloud customers. Its senior vice president Jeremy Foster gave the company's first Computex keynote in Taipei on 1 June 2026, titled A Full Stack Approach to AI, positioning Cisco around moving enterprise AI workloads into production.
Other players operating in the Taiwan data center networking market include Arista Networks, NVIDIA, Juniper Networks, Nokia, and Dell Technologies, alongside local optical module makers, cabling suppliers, system integrators and distributors supplying switching, interconnect and structured cabling to hyperscale, telecom, enterprise and research data centers across Taiwan.
Key Insight
Competition rests on silicon access, hyperscaler qualification, optical know-how and delivery speed rather than price alone, while open networking lets local makers challenge established global brands.
Frequently Asked Questions: Taiwan Data Center Networking Market
What is the size of the Taiwan data center networking market in 2025?
The Taiwan data center networking market is valued at USD 320.00 million in 2025, supported by hyperscale and sovereign AI investment, the shift from 400G to 800G and 1.6T fabrics, and strong local switch and optics manufacturing, with Northern Taiwan as the largest region.
What is the forecast for the Taiwan data center networking market by 2035?
The market is forecast to reach USD 950.38 million by 2035, growing at a CAGR of 11.5 % over the 2026 to 2035 period, driven by grid connection requests for new data centers, AI cluster back-end networks and the spread of co-packaged optics.
Which data rate has the highest CAGR in the Taiwan data center networking market?
1.6T and Above records the highest CAGR at an estimated 21.8% through 2035, as AI clusters adopt 102.4T switches such as Edgecore's February 2026 launch with 64 ports of 1.6T.
Which region dominates the Taiwan data center networking market?
Northern Taiwan (Taipei, New Taipei, Taoyuan) dominates, helped by Chunghwa Telecom's Lunping AI data center opened in August 2026. Central Taiwan (Taichung) is the fastest-growing region at an estimated 13.6% CAGR.
Who are the key players in the Taiwan data center networking market?
Key players include Accton Technology Corporation, Delta Electronics, Chunghwa Telecom, Cisco Systems, Arista Networks, NVIDIA, Juniper Networks, Nokia, and Dell Technologies.
What is Edgecore Networks?
Edgecore Networks, based in Hsinchu, is a wholly owned subsidiary of Accton Technology Corporation that makes open networking switches. In February 2026 it launched 102.4T switches with 1.6T and 800G ports.
Why does grid access matter for Taiwan data center networking?
Network equipment is ordered as halls are energized. Taipower held 75 data center requests totalling 4,523 MW on 31 July 2026, yet only 303.5 MW was connected, so orders follow approvals.
Table of Contents
Companies Mentioned
- Accton Technology Corporation
- Delta Electronics
- Chunghwa Telecom
- Cisco Systems
- Arista Networks
- NVIDIA
- Juniper Networks
- Nokia
- Dell Technologies
Table Information
| Report Attribute | Details |
|---|---|
| No. of Pages | 112 |
| Published | November 2026 |
| Forecast Period | 2025 - 2035 |
| Estimated Market Value ( USD | $ 320 Million |
| Forecasted Market Value ( USD | $ 950.38 Million |
| Compound Annual Growth Rate | 11.5% |
| Regions Covered | Taiwan |
| No. of Companies Mentioned | 9 |