In 2025, the market is valued at USD 2.40 billion and is forecast to grow at a CAGR of 14.0%, reaching USD 8.90 billion by 2035. Growth is driven by Microsoft's CAD 19 billion Canadian programme, the federal sovereign compute program opened in April 2026, and a power-connection queue in Alberta that reached 19,565 MW in July 2026.
Market Overview
The Canada hyperscale data center market is shifting from cloud regions in a few metropolitan areas to gigawatt-scale artificial intelligence campuses. Power, not land or capital, now decides who builds, and provincial regulators are rewriting the rules for how large loads connect and what they pay.
Three forces are shaping the market: sovereign AI demand, with federal calls for proposals running from January to April 2026; power scarcity, as Alberta's 1,200 MW interim limit is fully allocated and Quebec proposes a data centre rate near 13 cents per kWh; and carrier and colocation investment led by Telus, Bell and eStruxture.
In May 2026 eStruxture named CoreWeave anchor tenant of its 90 MW CAL-3 campus near Calgary, and in June 2026 Bell signed Cohere to run models on Bell AI Fabric at Merritt, British Columbia. In October 2026 Quebec's energy regulator began hearing Hydro-Quebec's rate proposal.
Key Market Trends and Insights
- Alberta connection queue: Alberta's grid operator listed about 19,565 MW of requested data centre load in July 2026, against an interim connection limit of 1,200 MW.
- Sovereign carrier campuses: Telus targets more than 60,000 GPUs and 150 MW in British Columbia by 2032, while Bell plans about 500 MW of AI compute across six British Columbia sites.
- Quebec power repricing: Hydro-Quebec asked the regulator in 2026 for an average of 13 cents per kWh for data centres above 5 MW, nearly double the 6.82 cents paid today.
- Hyperscaler capital: Microsoft's CAD 19 billion programme includes more than CAD 7.5 billion over two years, with new Canadian capacity coming online from the second half of 2026.
The market is moving from cloud regions built in Toronto and Quebec towards large AI campuses that sit near cheap or dedicated power. Wholesale and hyperscale colocation leads in value, while AI and GPU campuses expand fastest as sovereign compute programmes and GPU cloud tenants sign multi-year leases. Campuses above 100 MW and AI and technology companies as tenants gain share, and telecom operators use their land, fibre and power access to enter hyperscale. Ontario remains the largest region, and Alberta grows quickest as developers bring their own generation to escape queue limits. Rate reform in Quebec, a connection framework in Ontario and a bring-your-own-power rule in Alberta point to a market where energy strategy determines winners more than building cost.
Key Metrics
- Market Size 2025: USD 2.40 billion
- Projected Market Size 2035: USD 8.90 billion
- CAGR 2026 to 2035: 14.0%
- Fastest-Growing Facility Type: AI and GPU Campuses: 21.5% CAGR
- Fastest-Growing Power Capacity: Above 100 MW: 19.0% CAGR
- Largest Revenue Segment 2025: Wholesale and Hyperscale Colocation
- Dominant Region: Ontario
- Highest CAGR by Region: Alberta: 19.8%
- Alberta data centre load requested, July 2026: 19,565 MW
- Base Market Amount 2025: USD 2.40 billion
Power Access Sets the Pace of Growth
Revenue is on course to expand by about 271% across the decade, from USD 2.40 billion in 2025 to USD 8.90 billion in 2035 at a 14.0% CAGR. Alberta's 1,200 MW interim cap is fully used and Quebec expects data centre demand to rise to about 1,000 MW by 2035, so firm power decides timing.
AI Campuses and Large Sites Lead Expansion
Wholesale and Hyperscale Colocation holds the largest share, but AI and GPU Campuses grow at an estimated 21.5% CAGR and sites above 100 MW at 19.0% through 2035. CoreWeave's anchor lease at CAL-3 in May 2026 and Cohere's Bell AI Fabric deal in June 2026 show tenants committing to dedicated AI capacity.
Regulators Reprice and Ration Large Loads
Provinces moved in 2026 from open invitations to managed connection, with tariffs, approvals and own-generation rules that favour well-capitalised developers.
- Hydro-Quebec proposed an average 13 cents per kWh for data centres above 5 MW in February 2026
- Alberta's Data Centre Regulation, in force June 2026, prioritises projects paired with new generation or storage
- Ontario's IESO posted draft technical requirements for large computational loads in May 2026
- Base Year: 2025
- Historical Period: 2019 to 2025
- Forecast Period: 2026 to 2035
- Market Size 2025 (USD billion): 2.40
- Market Size 2035 (USD billion): 8.90
- CAGR 2026 to 2035: 14.0 %
- CAGR by Facility Type: AI and GPU Campuses: 21.5 %
- CAGR by Power Capacity: Above 100 MW: 19.0 %
- CAGR by End User: AI and Technology Companies: 18.2 %
- CAGR by Region: Alberta: 19.8 %
- Alberta Data Centre Load Requested, July 2026 (Megawatts): 19565
- Hydro-Quebec Proposed Data Centre Rate (Cents per kWh): 13.00
- Market Share by Region 2025: Ontario (Dominant Share)
Demand is shifting from metropolitan cloud regions to large AI campuses near secure power, as sovereign compute programmes scale. Ontario leads, and Alberta grows fastest.
Key Trends in the Canada Hyperscale Data Center Market
The Canada hyperscale data center market is being reshaped by power rationing, regulated data centre tariffs, sovereign AI programmes and carrier-led campus building.
1. October 2026 - Quebec Regulator Hears Hydro-Quebec's Data Centre Rate Case
- Hydro-Quebec made its first presentation to the Regie de l'energie on 1 October 2026, with the first phase closing on 9 October.
- It seeks an average of 13 cents per kWh for data centres above 5 MW, against 6.82 cents now, from 1 November 2026.
- Google asked the regulator to reject the rate or protect existing sites, and hearings resume in December 2026.
- A provincial consultation that closed on 12 September 2026 proposed that large new data centres could need government approval before connecting.
- It also floated a separate rate class for new data centres and exclusion from the Industrial Conservation Initiative.
- Results are expected in autumn 2026, which affects financing for Toronto-area campuses.
- The Alberta government reported about 19,565 MW of requested new data centre load on the grid operator's list at 30 July 2026.
- The 1,200 MW interim allocation is fully used, and a permanent Phase 2 framework is being finalised.
- The Data Centre Regulation, in force since June 2026, prioritises projects with dedicated new generation or storage.
- The IESO posted draft technical requirements for large computational loads on 14 May 2026, followed by a public webinar on 23 July 2026.
- The draft adds compliance and disclosure duties for loads that connect in large blocks over a short period.
- Data centres are expected to account for 13% of new provincial electricity demand by 2035.
Power rationing, regulated data centre tariffs and sovereign compute programmes are the main structural forces, while grid access and rate uncertainty remain the main risks to project timing.
Recent Market Developments in the Canada Hyperscale Data Center Market
Recent developments, presented from the most recent, show cloud and AI model hosting deals, federal sovereign compute steps, an anchor lease in Alberta and hyperscaler capital commitments.
1. June 2026 - Bell and Cohere Sign AI Infrastructure Deal on Bell AI Fabric
- On 18 June 2026 Bell and Cohere announced that Cohere will run its models on Bell AI Fabric for government and business customers.
- Capacity comes from Bell's Merritt, British Columbia site, with an AI cloud layer from Buzz High Performance Computing and a Hypertec cluster.
- The deal builds on a partnership first announced in July 2025 and adds a domestic model tenant.
- eStruxture said on 14 May 2026 that CoreWeave signed for part of Phase 1 of CAL-3 in Rocky View County near Calgary.
- The Tier III-designed facility offers 90 MW and is scheduled to come online in the second half of 2026.
- QScale also agreed in May 2026 to pass to an infrastructure investor, with management keeping a stake.
- On 15 April 2026 Innovation, Science and Economic Development Canada opened the AI Sovereign Compute Infrastructure Program call for applications.
- Applicants are invited to design, build and operate a large-scale AI-optimised computing system in Canada.
- On 11 May 2026 the government and Telus advanced work on a proposed British Columbia sovereign AI data centre.
- Microsoft said on 9 December 2025 that its programme runs through 2027, with more than CAD 7.5 billion over the next two years.
- It expands the Azure Canada Central and Canada East regions, with new capacity arriving from the second half of 2026.
- Planned 2026 offerings include in-country Copilot processing, Azure Local and confidential computing.
Model hosting agreements, an anchor lease for a new Alberta campus, federal compute calls and hyperscaler spending show capital moving towards dedicated AI capacity across several provinces.
Canada Hyperscale Data Center Industry Segmentation
The Expert Market Research’s report on the Canada Hyperscale Data Center Market offers a detailed analysis of the market based on the following segments.
Market Breakup by Facility Type
- Hyperscaler Self-Build Campuses
- Wholesale and Hyperscale Colocation
- AI and GPU Campuses
- Sovereign and Government Cloud Facilities
- Others
Market Breakup by Power Capacity
- Below 20 MW
- 20 to 50 MW
- 50 to 100 MW
- Above 100 MW
- Others
Market Breakup by End User
- Cloud Service Providers
- AI and Technology Companies
- Telecom Operators
- Government and Public Sector
- BFSI and Other Enterprises
- Others
Market Breakup by Region
- Ontario
- Quebec
- British Columbia
- Alberta
- Others
CAGR 2026 to 2035, Market by Region
- Ontario: 12.8 %
- Quebec: 11.9 %
- British Columbia: 17.6 %
- Alberta: 19.8 %
- Others (incl. Manitoba, Saskatchewan, Atlantic provinces and the territories): 13.4 %
Competition combines global cloud providers, Canadian carriers, domestic colocation operators and new AI campus developers. Entry barriers include secured grid power, long-term anchor tenants, capital, community and First Nations consultation, and the ability to deliver high-density cooling.
Microsoft
Microsoft, headquartered in Redmond, Washington, runs the Azure Canada Central and Canada East cloud regions in Toronto and Quebec City. On 9 December 2025 it announced a CAD 19 billion Canadian programme through 2027, with more than CAD 7.5 billion over the next two years and new capacity arriving from the second half of 2026. Planned 2026 offerings include in-country Copilot processing, Azure Local, confidential computing and a Sovereign AI Landing Zone.
TELUS
TELUS, headquartered in Vancouver, operates Sovereign AI Factories built with Nvidia GPUs and HPE. The first, at Rimouski, Quebec, was serving customers by September 2025, with Accenture and OpenText named as users. In May 2026 it said Kamloops would expand later in 2026 and a Vancouver site would open at the end of 2026, building a British Columbia cluster of more than 60,000 GPUs and 150 MW by 2032.
Bell Canada
Bell Canada, part of BCE and based in Montreal, markets Bell AI Fabric. In May 2025 it announced six British Columbia data centres totalling about 500 MW, starting with a 7 MW Kamloops site supplied to Groq. In June 2026 it signed Cohere to run models on the platform at Merritt, with Buzz High Performance Computing and Hypertec supplying the cloud layer and cluster, targeting government and business customers.
eStruxture Data Centers
eStruxture Data Centers, headquartered in Montreal, operates facilities in Montreal, Toronto, Vancouver and Calgary. On 14 May 2026 it named CoreWeave anchor tenant of CAL-3, a 90 MW Tier III-designed campus in Rocky View County due online in the second half of 2026. In October 2025 it launched a sovereign, AI-ready government cloud with ThinkOn, Hypertec and Aptum, and in March 2026 announced further financing.
Other players operating in the Canada hyperscale data center market include Cologix, QScale, Beacon AI Centers, Equinix, and Digital Realty, alongside Google, Amazon Web Services, Oracle, regional colocation operators and GPU cloud providers supplying capacity to cloud platforms, telecom operators, governments and AI developers across Canada.
Key Insight
Competition rests on secured power, anchor tenants, capital access and sovereign credentials rather than building cost, while ownership changes and carrier entry could reshape positions.
Frequently Asked Questions: Canada Hyperscale Data Center Market
What is the size of the Canada hyperscale data center market in 2025?
The Canada hyperscale data center market is valued at USD 2.40 billion in 2025, supported by sovereign AI programmes, hyperscaler capital commitments and carrier-built campuses, with Ontario as the largest region.
What is the forecast for the Canada hyperscale data center market by 2035?
The market is forecast to reach USD 8.90 billion by 2035, growing at a CAGR of 14.0 % over the 2026 to 2035 period, driven by AI compute demand, regulated power connection in Alberta, Ontario and Quebec, and large anchor leases at new campuses.
Which facility type has the highest CAGR in the Canada hyperscale data center market?
AI and GPU Campuses record the highest CAGR at an estimated 21.5% through 2035, as GPU cloud tenants such as CoreWeave and model developers such as Cohere sign dedicated capacity.
Which region dominates the Canada hyperscale data center market?
Ontario dominates, supported by Toronto-area campuses of Cologix, eStruxture and Microsoft. Alberta is the fastest-growing region at an estimated 19.8% CAGR, as developers seek power through the grid operator's connection list.
Who are the key players in the Canada hyperscale data center market?
Key players include Microsoft, TELUS, Bell Canada, eStruxture Data Centers, Cologix, QScale, Beacon AI Centers, Equinix, and Digital Realty.
What is Bell AI Fabric?
Bell AI Fabric is Bell Canada's platform of AI data centres, with about 500 MW planned across six British Columbia sites. In June 2026 Cohere agreed to run its models on it, using the Merritt site.
Why is power access limiting Canadian data centre growth?
Alberta's grid operator holds a request list of about 19,565 MW against a 1,200 MW interim limit, and Hydro-Quebec proposes about 13 cents per kWh for large data centres. Ontario is drafting large-load rules.
Table of Contents
Companies Mentioned
- Microsoft
- TELUS
- Bell Canada
- eStruxture Data Centers
- Cologix
- QScale
- Beacon AI Centers
- Equinix
- Digital Realty
Table Information
| Report Attribute | Details |
|---|---|
| No. of Pages | 120 |
| Published | November 2026 |
| Forecast Period | 2025 - 2035 |
| Estimated Market Value ( USD | $ 2.4 Billion |
| Forecasted Market Value ( USD | $ 8.9 Billion |
| Compound Annual Growth Rate | 14.0% |
| Regions Covered | Canada |
| No. of Companies Mentioned | 9 |


