North America Data Center Grid Infrastructure and Interconnection Market Trends and Insights
AI and Hyperscale Data Center Load Growth Drives Infrastructure Spending
AI workloads are changing the power requirements of grid interconnection infrastructure across North America. EPRI projects that data centers could consume 9%-17% of US electricity by 2030, and AI workloads account for 15%-25% of data center electricity use. The US Department of Energy reported that data centers used 4.7% of US electricity in 2024 and could use 9.5%-15.3% by 2030. The North America data center grid infrastructure and interconnection market, therefore, requires more high-capacity substations, dedicated transmission spurs, and protection equipment. FERC reported that the average connected capacity of data centers entering service in 2025 approached 80 MW, compared with 25 MW in 2020. These larger connections place extra-high-voltage designs and real-time grid visibility at the center of supplier and utility planning.Dedicated Interconnection Asset Investment Reshapes Capital Flows
The North America data center grid infrastructure and interconnection market is increasingly supported by direct investment from hyperscalers and large colocation operators. These customers are funding substations, transmission lines, and grid upgrades rather than relying solely on utility-funded network expansion. American Electric Power announced a USD 72 billion capital plan through 2030 and a strategic relationship with Quanta Services for 765-kV transmission work and the expansion of domestic equipment manufacturing. PJM approved USD 5.9 billion in transmission projects that support large-load interconnections. This funding model shifts procurement, equipment scheduling, construction, and cost risk more directly to the data center customer. It also favors providers that can deliver integrated engineering, procurement, construction, and equipment coordination for the North America data center grid infrastructure and interconnection market.Multi-Year Utility Study and Construction Timelines Constrain Time to Power
The interval between an interconnection request and energization is a major conversion risk for the North America data center grid infrastructure and interconnection market. Lawrence Berkeley National Laboratory reported that only 13% of the capacity requesting interconnection from 2000 to 2020 had reached commercial operation by the end of 2025. The same analysis found that 75% of that capacity had been withdrawn. Data center construction typically takes 12-24 months, while studies, substations, and transmission upgrades can take 3-7 years. FERC's large-load rulemaking seeks to address such delays, but implementation by ISOs and RTOs remains a multiyear process. The gap between construction and power delivery increases the value of flexible-load commitments, phased energization, and early engagement with utilities.Other drivers and restraints analyzed in the detailed report include:
- Grid Modernization and Aging Infrastructure Replacement Expands Interconnection Work
- Renewable Energy and Storage Integration Adds Interconnection Requirements
- Transformer, Switchgear, and Cable Supply Constraints Reduce Schedule Certainty
Segment Analysis
New grid connections accounted for 38.03% of regional revenue in 2026. This position reflects the continued importance of standard utility-mediated service for enterprise and colocation facilities. Dedicated transmission infrastructure is projected to record a 14.39% CAGR from 2027 to 2032. Hyperscale operators are using private 500 kV and 765 kV spurs when conventional queues cannot meet project schedules. Lawrence Berkeley National Laboratory found that interconnection development can take more than 5 years from request to commercial operation. Substation and grid interconnection upgrades form the second-largest project type as utilities raise hosting capacity in established data center corridors. Existing connection upgrades remain relevant for operators adding load to energized campuses. These projects generally have lower unit values than new dedicated transmission systems. Together, the categories show that the North America data center grid infrastructure and interconnection market covers both new large-load entry points and upgrades to existing service.FERC's June 2026 tailored orders require RTOs to address transmission services for flexible large loads and to allocate costs. The orders support a move from standard service requests toward customized interconnection arrangements. The Department of Energy's large-load proposal links curtailment commitments with faster study treatment. This approach encourages investment in storage and co-located generation that can reduce grid draw during constrained periods. Dedicated assets can also make the timing, scope, and sequencing of a project more transparent for the customer. They transfer more scheduling and procurement responsibility to the developer. EPC contractors must therefore manage construction sequencing and equipment lead times more closely. The North America data center grid infrastructure and interconnection industry benefits where providers can coordinate utility requirements with customer-funded assets.
Substations and switchyards held 28.04% of the North America data center grid infrastructure and interconnection market size in 2026. Each large campus needs a dedicated or utility-owned substation at its primary grid interface. Grid connection, control, and monitoring systems are projected to expand at a 14.57% CAGR from 2027 to 2032. Data center operators need real-time visibility and automated protection at the interconnection point. Schweitzer Engineering Laboratories identified grid stability concerns related to AI load patterns during its September 2026 technical session. Power transformers remain an important component because large campuses need high-capacity conversion and connection equipment. Transmission lines and cables also benefit from private utility spurs and network upgrades. Prysmian's Texas investment reflects demand for medium-voltage cable production supporting these connections
Switchgear and protection systems complete the core equipment mix for the North America data center grid infrastructure and interconnection market. Gas-insulated switchgear is well-suited to space-constrained urban and suburban locations, where a smaller footprint supports project design. Suppliers are also developing equipment for higher-density computing loads and more compact power architectures. Siemens and Reinhausen announced in August 2026 a solid-state transformer designed to provide a stable 800 VDC output. The equipment is modular and scalable to 36 kV AC. Such development targets both physical footprint and interconnection infrastructure requirements. Digital control products must also work with conventional utility protection and communications systems. As a result, component suppliers compete on technical compliance, equipment availability, and integration capability rather than hardware capacity alone.
Complete Report Scope:
- By Interconnection Project Type
- New Grid Connections
- Existing Connection Upgrades
- Dedicated Transmission Infrastructure
- Substation and Grid Interconnection Upgrades
- By Infrastructure Component
- Substations and Switchyards
- Power Transformers
- Transmission Lines and Cables
- Switchgear and Protection Systems
- Grid Connection, Control, and Monitoring Systems
- By Voltage Level
- Low and Medium Voltage
- High Voltage
- Extra-High Voltage
- By Data Center Size
- Small
- Medium
- Large
- Hyperscale
- By Data Center Type
- Colocation
- Cloud Service Providers (CSPs)
- Enterprise and Edge
- By Geography
- United States
- Canada
- Mexico
List of Companies Covered in this Report:
- Quanta Services, Inc.
- GE Vernova Inc.
- Hitachi Energy Ltd.
- Siemens Energy AG
- MYR Group Inc.
- Primoris Services Corporation
- Prysmian S.p.A.
- Nexans S.A.
- Eaton Corporation plc
- ABB Ltd
- Schneider Electric SE
- Mitsubishi Electric Corporation
- Toshiba Energy Systems and Solutions Corporation
- Hyosung Heavy Industries Co., Ltd.
- HD Hyundai Electric Co., Ltd.
- LS ELECTRIC Co., Ltd.
- Hubbell Incorporated
- Vertiv Holdings Co
- Schweitzer Engineering Laboratories, Inc.
- Burns & McDonnell Engineering Company, Inc.
Additional Benefits:
- The market estimate (ME) sheet in Excel format
- 3 months of analyst support
Table of Contents
Companies Mentioned (Partial List)
A selection of companies mentioned in this report includes, but is not limited to:
- Quanta Services, Inc.
- GE Vernova Inc.
- Hitachi Energy Ltd.
- Siemens Energy AG
- MYR Group Inc.
- Primoris Services Corporation
- Prysmian S.p.A.
- Nexans S.A.
- Eaton Corporation plc
- ABB Ltd
- Schneider Electric SE
- Mitsubishi Electric Corporation
- Toshiba Energy Systems and Solutions Corporation
- Hyosung Heavy Industries Co., Ltd.
- HD Hyundai Electric Co., Ltd.
- LS ELECTRIC Co., Ltd.
- Hubbell Incorporated
- Vertiv Holdings Co
- Schweitzer Engineering Laboratories, Inc.
- Burns & McDonnell Engineering Company, Inc.