Data Center Grid Infrastructure and Interconnection - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2027-2032)

  • PDF Icon

    Report

  • 170 Pages
  • October 2026
  • Region: Global
  • Mordor Intelligence
  • ID: 6294097
The data center grid infrastructure and interconnection market size is projected to be USD 31.19 billion in 2026, USD 36.41 billion in 2027, and reach USD 68.09 billion by 2032, at a CAGR of 13.34% from 2027 to 2032. This report is Segmented by Interconnection Project Type (New Grid Connections, and More), Infrastructure Component (Substations and Switchyards, and More), Voltage Level (Low and Medium Voltage, and More), Data Center Size (Small, Medium, Large, and Hyperscale), Data Center Type (Colocation, and More), and Geography. The Market Forecasts are Provided in Terms of Value (USD).

Global Data Center Grid Infrastructure and Interconnection Market Trends and Insights

Expansion of Hyperscale, Colocation, and AI Data Center Capacity

The data center grid infrastructure and interconnection market benefits when operators develop campuses exceeding 300 MW, as these sites generally require dedicated high-voltage substations and transmission assets. In 2025, data centers increased electricity demand by 17%, compared with 3% growth in global electricity demand, highlighting the mismatch between digital load and existing grid capacity. The International Energy Agency also reported that capital expenditure by 5 major technology companies exceeded USD 400 billion in 2025 and was set to rise by 75% in 2026. This spending supports demand for transformers, switchgear, protection systems, and cables well before a new facility becomes operational. Campuses planned at 1 GW or more need extra-high-voltage equipment and dedicated lines, which can require 5 to 8 years to plan and deliver.

Grid Connection Delays and Interconnection Queue Backlogs

Connection delays are increasing the value of early equipment procurement in the data center grid infrastructure and interconnection market. The US Department of Energy asked the Federal Energy Regulatory Commission in October 2025 to address large-load interconnections, reflecting concern that existing processes were not keeping pace with demand. Developers are responding by beginning interconnection studies and reserving long-lead equipment before site construction starts. This change favors buyers who can commit to equipment and connection costs early in the development process. It also favors suppliers with capacity reservation agreements and utilities with transparent queue management.

Lengthy Grid Interconnection and Approval Processes

Lengthy review processes constrain how quickly the data center grid infrastructure and interconnection market can translate planned projects into completed revenue. The Federal Energy Regulatory Commission opened its large-load interconnection proceeding in June 2026, which confirms that the federal framework for computational loads remains under development. Rules related to interconnection studies, reliability, and cost allocation can change during the development of a multi-year project. Smaller 50 MW to 150 MW operators face particular difficulty because study deposits and connection costs require substantial funding before service is guaranteed. NERC standards, state public utility commission approvals, and FERC jurisdictional obligations can also create overlapping review periods.

Other drivers and restraints analyzed in the detailed report include:

  1. Rising Electricity Demand and Local Grid Capacity Constraints
  2. Investment in Transmission, Substations, and High-Voltage Infrastructure
  3. High Capital Requirements for Substations and Transmission Upgrades

Segment Analysis

New grid connections held 37.82% of the data center grid infrastructure and interconnection market share in 2026. This position reflects the number of greenfield campuses moving from planning into construction across North America, Europe, the Middle East, and Africa. Large hyperscale projects generally require new substations and line infrastructure rather than modifications to existing service points. That requirement makes new connections the principal route to revenue for equipment suppliers, grid operators, and EPC contractors. Existing connection upgrades remain important for operating facilities that need larger transformers or higher-voltage configurations. These upgrades can also support new IT loads and onsite renewable integration without the full cost of a new transmission connection.

Transmission lines and cables are projected to expand at a 14.14% CAGR through 2032, the highest rate among the stated project-type categories. Their demand follows the growing length and voltage rating of dedicated links serving campuses at the gigawatt scale. Dedicated transmission infrastructure remains the smallest category, but it is necessary for campuses above 500 MW where conventional distribution links cannot provide the required capacity and redundancy. Quanta Services and NiSource announced in 2025 that Quanta would design, procure, and construct 3 GW of power generation and grid infrastructure for a large data center customer in Indiana, with completion expected by 2032. This type of arrangement extends the contractor's responsibility beyond a single substation to the wider campus power system. It also narrows the pool of firms capable of taking on complex transmission and interconnection work.

Substations and switchyards accounted for 31.09% of the data center grid infrastructure and interconnection market size in 2026. They form the physical interface between the transmission network and a campus, especially for direct connections at 345 kV or higher. Each large campus requires a substation designed for its connection voltage, redundancy, and expected load profile. Power transformers are central to this equipment set and are often the most difficult items to obtain. Reuters reported in August 2025 that large power transformers had an average delivery time of 128 weeks and generator step-up units had an average delivery time of 144 weeks in the second quarter of 2025. Switchgear, protection systems, and transmission cables also benefit from increased starts at 345 kV to 765 kV.

Grid connection, control, and monitoring systems are projected to expand at a 14.33% CAGR through 2032. Their role is increasing because grid operators need accurate, real-time information on the changing load of data center facilities. The Federal Energy Regulatory Commission's July 2026 direction for NERC to consider reliability standards for computational loads highlights the importance of assessing large-load behavior. This requirement supports demand for upgrades to phasor measurement, supervisory control, and data acquisition, as well as automated demand response interfaces. VIRTUS installed 2,185 MVA super-grid transformers at Wustermark in June 2026, an example of equipment being used to match higher campus power densities. Control systems become more valuable as these connections increase in voltage and operational complexity.

Complete Report Scope:

  • By Interconnection Project Type
    • New Grid Connections
    • Existing Connection Upgrades
    • Dedicated Transmission Infrastructure
    • Substation and Grid Interconnection Upgrades
  • By Infrastructure Component
    • Substations and Switchyards
    • Power Transformers
    • Transmission Lines and Cables
    • Switchgear and Protection Systems
    • Grid Connection, Control, and Monitoring Systems
  • By Voltage Level
    • Low and Medium Voltage
    • High Voltage
    • Extra-High Voltage
  • By Data Center Size
    • Small
    • Medium
    • Large
    • Hyperscale
  • By Data Center Type
    • Colocation
    • Cloud Service Providers (CSPs)
    • Enterprise and Edge
  • By Geography
    • North America
      • United States
      • Canada
      • Mexico
    • South America
      • Brazil
      • Chile
      • Colombia
      • Argentina
      • Peru
      • Rest of South America
    • Europe
      • United Kingdom
      • Germany
      • France
      • Netherlands
      • Ireland
      • Spain
      • Italy
      • Nordics
      • Rest of Europe
    • Middle East and Africa
      • Saudi Arabia
      • United Arab Emirates
      • South Africa
      • Israel
      • Egypt
      • Qatar
      • Rest of Middle East and Africa
    • Asia-Pacific
      • China
      • India
      • Japan
      • Australia
      • Singapore
      • South Korea
      • Malaysia
      • Indonesia
      • Rest of Asia-Pacific

Geography Analysis

North America held 45.51% of the data center grid infrastructure and interconnection market share in 2026. The United States accounts for most of this demand because it has the largest concentration of hyperscale campuses and a growing requirement for transmission upgrades. PJM approved a USD 11.8 billion Regional Transmission Expansion Plan in February 2026, including a USD 2.3 billion, 185-mile, 525 kV underground backbone proposed by Dominion Energy Virginia to deliver 3 GW into Northern Virginia by June 2032. Canada is directing utility investment toward higher-capacity substation upgrades, while Mexico is gaining direct high-voltage connection projects.

Europe is the second-largest regional market and is supported by regulated transmission operators and EU network codes. In July 2025, 50Hertz signed a connection construction contract with VIRTUS Data Centers for a 300-MW, 380-kV connection in Berlin-Brandenburg. In December 2025, 50Hertz also signed a 380 kV underground cable connection contract for VANTAGE's BER1 campus expansion, with a contracted load of 300 MW and a planned expansion to 500 MW. The data center grid infrastructure and interconnection market has strong prospects in the Berlin-Brandenburg corridor, as 50Hertz plans to add 2 GW of total data center connections in the region by 2029. The United Kingdom has a substantial pipeline, with parliamentary evidence in 2026 reporting nearly 59 GW of data center projects seeking transmission-level connections.

The Middle East and Africa are projected to expand at a 14.36% CAGR through 2032, the highest regional rate. Saudi Arabia's National Data Center Strategy, launched in June 2025, targets up to 1.5 GW of installed data center capacity by 2030. NEOM and DataVolt announced a USD 5 billion agreement in February 2025 for a 1.5 GW net-zero AI campus in Oxagon, with the first phase expected to become operational by 2028. Asia-Pacific demand reflects China's nationally governed grid programs and rising load in the Mumbai, Chennai, and Hyderabad hubs in India. Singapore remains tightly capacity managed, while Australia and South Korea are emerging as secondary hubs.



List of Companies Covered in this Report:

  1. Hitachi Energy
  2. Siemens Energy AG
  3. GE Vernova Inc.
  4. Schneider Electric SE
  5. ABB Ltd.
  6. Eaton Corporation plc
  7. Mitsubishi Electric Corporation
  8. Toshiba Energy Systems & Solutions Corporation
  9. HD Hyundai Electric Co., Ltd.
  10. CG Power and Industrial Solutions Limited
  11. Powell Industries, Inc.
  12. Virginia Transformer Corp.
  13. Schweitzer Engineering Laboratories, Inc.
  14. S&C Electric Company
  15. Efacec Power Solutions SGPS, S.A.
  16. NKT A/S
  17. Prysmian S.p.A.
  18. Nexans S.A.
  19. LS ELECTRIC Co., Ltd.
  20. Quanta Services, Inc.

Additional Benefits:

  • The market estimate (ME) sheet in Excel format
  • 3 months of analyst support

Table of Contents

1 INTRODUCTION
1.1 Study Assumptions and Market Definition
1.2 Scope of Study
2 RESEARCH METHODOLOGY3 EXECUTIVE SUMMARY
4 MARKET LANDSCAPE
4.1 Market Overview
4.2 Impact of Macroeconomic Factors on the Market
4.3 Market Drivers
4.3.1 Expansion of hyperscale, colocation, and AI data center capacity
4.3.2 Grid connection delays and interconnection queue backlogs
4.3.3 Rising electricity demand and constraints on local grid capacity
4.3.4 Investment in transmission, substations, and high-voltage infrastructure
4.3.5 Growth of large data center campuses requiring dedicated grid connections
4.3.6 Grid modernization and reliability investment initiatives
4.4 Market Restraints
4.4.1 Lengthy grid interconnection and approval processes
4.4.2 High capital requirements for substations and transmission upgrades
4.4.3 Long lead times for transformers and high-voltage equipment
4.4.4 Land acquisition, right-of-way, and permitting constraints
4.4.5 Uncertainty over available utility capacity and upgrade costs
4.4.6 Regulatory complexity and coordination across utilities and authorities
4.5 Industry Value Chain Analysis
4.6 Grid Infrastructure and Interconnection Technology Trends
4.7 Utility Investment and Data Center Grid Expansion Trends
4.8 Regulatory and Policy Landscape
4.9 Porter’s Five Forces Analysis
4.9.1 Bargaining Power of Suppliers
4.9.2 Bargaining Power of Buyers
4.9.3 Threat of New Entrants
4.9.4 Threat of Substitutes
4.9.5 Competitive Rivalry
5 MARKET SIZE AND GROWTH FORECASTS (VALUE)
5.1 By Interconnection Project Type
5.1.1 New Grid Connections
5.1.2 Existing Connection Upgrades
5.1.3 Dedicated Transmission Infrastructure
5.1.4 Substation and Grid Interconnection Upgrades
5.2 By Infrastructure Component
5.2.1 Substations and Switchyards
5.2.2 Power Transformers
5.2.3 Transmission Lines and Cables
5.2.4 Switchgear and Protection Systems
5.2.5 Grid Connection, Control, and Monitoring Systems
5.3 By Voltage Level
5.3.1 Low and Medium Voltage
5.3.2 High Voltage
5.3.3 Extra-High Voltage
5.4 By Data Center Size
5.4.1 Small
5.4.2 Medium
5.4.3 Large
5.4.4 Hyperscale
5.5 By Data Center Type
5.5.1 Colocation
5.5.2 Cloud Service Providers (CSPs)
5.5.3 Enterprise and Edge
5.6 By Geography
5.6.1 North America
5.6.1.1 United States
5.6.1.2 Canada
5.6.1.3 Mexico
5.6.2 South America
5.6.2.1 Brazil
5.6.2.2 Chile
5.6.2.3 Colombia
5.6.2.4 Argentina
5.6.2.5 Peru
5.6.2.6 Rest of South America
5.6.3 Europe
5.6.3.1 United Kingdom
5.6.3.2 Germany
5.6.3.3 France
5.6.3.4 Netherlands
5.6.3.5 Ireland
5.6.3.6 Spain
5.6.3.7 Italy
5.6.3.8 Nordics
5.6.3.9 Rest of Europe
5.6.4 Middle East and Africa
5.6.4.1 Saudi Arabia
5.6.4.2 United Arab Emirates
5.6.4.3 South Africa
5.6.4.4 Israel
5.6.4.5 Egypt
5.6.4.6 Qatar
5.6.4.7 Rest of Middle East and Africa
5.6.5 Asia-Pacific
5.6.5.1 China
5.6.5.2 India
5.6.5.3 Japan
5.6.5.4 Australia
5.6.5.5 Singapore
5.6.5.6 South Korea
5.6.5.7 Malaysia
5.6.5.8 Indonesia
5.6.5.9 Rest of Asia-Pacific
6 COMPETITIVE LANDSCAPE
6.1 Market Concentration Analysis
6.2 Market Share Analysis
6.3 Strategic Partnerships and Utility Collaborations
6.4 Mergers, Acquisitions, and Capacity Expansion
6.5 Competitive Positioning of Key Suppliers
6.6 Company Profiles (includes Global Level Overview, Market Level Overview, Core Segments, Financials as available, Strategic Information, Market Rank/Share, Products and Services, Recent Developments)
6.6.1 Hitachi Energy
6.6.2 Siemens Energy AG
6.6.3 GE Vernova Inc.
6.6.4 Schneider Electric SE
6.6.5 ABB Ltd.
6.6.6 Eaton Corporation plc
6.6.7 Mitsubishi Electric Corporation
6.6.8 Toshiba Energy Systems & Solutions Corporation
6.6.9 HD Hyundai Electric Co., Ltd.
6.6.10 CG Power and Industrial Solutions Limited
6.6.11 Powell Industries, Inc.
6.6.12 Virginia Transformer Corp.
6.6.13 Schweitzer Engineering Laboratories, Inc.
6.6.14 S&C Electric Company
6.6.15 Efacec Power Solutions SGPS, S.A.
6.6.16 NKT A/S
6.6.17 Prysmian S.p.A.
6.6.18 Nexans S.A.
6.6.19 LS ELECTRIC Co., Ltd.
6.6.20 Quanta Services, Inc.
7 MARKET OUTLOOK AND FUTURE TRENDS
7.1 Expansion of Dedicated Grid Connections for Data Centers
7.2 Investment in High-Voltage Substations and Transmission Infrastructure
7.3 Utility and Data Center Operator Partnerships
7.4 Grid Interconnection Strategies for Hyperscale Campuses
7.5 Adoption of Advanced Grid Monitoring and Control Technologies
7.6 Emerging Grid Infrastructure Opportunities in New Data Center Markets

Companies Mentioned (Partial List)

A selection of companies mentioned in this report includes, but is not limited to:

  • Hitachi Energy
  • Siemens Energy AG
  • GE Vernova Inc.
  • Schneider Electric SE
  • ABB Ltd.
  • Eaton Corporation plc
  • Mitsubishi Electric Corporation
  • Toshiba Energy Systems & Solutions Corporation
  • HD Hyundai Electric Co., Ltd.
  • CG Power and Industrial Solutions Limited
  • Powell Industries, Inc.
  • Virginia Transformer Corp.
  • Schweitzer Engineering Laboratories, Inc.
  • S&C Electric Company
  • Efacec Power Solutions SGPS, S.A.
  • NKT A/S
  • Prysmian S.p.A.
  • Nexans S.A.
  • LS ELECTRIC Co., Ltd.
  • Quanta Services, Inc.