In 2025, the market is valued at USD 540.00 million and is forecast to grow at a CAGR of 10.8%, reaching USD 1.50 billion by 2035. Growth is driven by a pipeline that now includes a 280 MW campus with full resource consent in Southland, more than 130 MW of land-banked capacity at TenPeaks and a cloud region from Amazon Web Services backed by NZ$7.5 billion of planned investment.
Market Overview
The New Zealand data center construction market has moved from a handful of Auckland halls to a national build programme. Cloud regions, sovereign data rules and artificial intelligence workloads are pulling capital into new campuses, while a renewable-heavy grid gives New Zealand an unusual selling point.
Three forces shape the market: hyperscale and AI demand, which has produced the largest consented project in the country; operator carve-outs and equity raises that fund steady colocation expansion; and power policy, as ministers push big users to add generation instead of drawing on the existing grid.
In February 2026 TenPeaks launched as a stand-alone operator with more than NZ$3 billion of projects tied to its pipeline. In March 2026 Datagrid secured consent for its Southland campus, and in July 2026 the Prime Minister proposed a compact for hyperscale operators.
Key Market Trends and Insights
- Consented AI campus: Datagrid holds full resource consent for a 78,000 square metre, 280 MW campus at Makarewa, which the Prime Minister described in July 2026 as a NZ$3.5 billion project.
- Operator pipelines: TenPeaks said in February 2026 that it has more than 130 MW of development pipeline on land it owns, across three planned Auckland campuses and 11 operating facilities.
- Cloud region investment: Amazon Web Services launched its New Zealand region in September 2025 with three availability zones and expects to invest more than NZ$7.5 billion over the coming years.
- Grid conditions: Contact Energy brought a 100 MW battery online at Glenbrook in March 2026 and began a 200 MW second stage, adding firming capacity that large campuses will rely on.
The market is shifting from enterprise and colocation halls towards campuses designed for artificial intelligence, with higher rack densities, closed-loop cooling and on-site or contracted renewable supply. Colocation facilities lead in value because Auckland operators keep adding halls, while hyperscale and AI campuses advance fastest as Southland and other regional sites move from consent to construction. Cooling and mechanical packages gain share as liquid cooling becomes standard, and build-to-suit and lease structures grow as cloud providers place capacity inside third-party buildings. Auckland remains the largest region, and the Others group grows quickest on Southland and Taranaki projects. Government rules on additional generation, grid connection terms and supply chain capacity will set the pace, but the direction points to a durable step up in construction activity rather than a one-off cycle.
Key Metrics
- Market Size 2025: USD 540.00 million
- Projected Market Size 2035: USD 1.50 billion
- CAGR 2026 to 2035: 10.8%
- Fastest-Growing Facility Type: Hyperscale and AI Campuses: 14.2% CAGR
- Fastest-Growing Work Package: Cooling and Mechanical Systems: 12.6% CAGR
- Largest Revenue Segment 2025: Colocation Facilities
- Dominant Region: Auckland
- Highest CAGR by Region: Others (incl. Southland and Taranaki): 16.4%
- Datagrid Southland campus capacity: 280 MW
- Base Market Amount 2025: USD 540.00 million
Consented Projects Underpin a Decade of Growth
Construction spend is on course to nearly triple, from USD 540.00 million in 2025 to USD 1.50 billion in 2035 at a 10.8% CAGR. A consented 280 MW campus, TenPeaks pipeline land and the AWS cloud region give builders a visible order book.
AI Campuses and Cooling Packages Lead the Mix
Colocation Facilities hold the largest share, but Hyperscale and AI Campuses grow at an estimated 14.2% CAGR and Cooling and Mechanical Systems at an estimated 12.6% CAGR through 2035. Schneider Electric said in November 2025 that its liquid cooling range is being deployed in several large New Zealand data centres.
Power Policy Now Shapes Project Timing
Ministers want large users to add generation, and developers are responding with power agreements and firming capacity. That shifts risk from land and consents towards energy supply, and it favours sites close to new renewable output.
- Prime Minister proposed a hyperscale compact on additionality in July 2026
- Mercury agreed a 140 MW, 15-year power option with Datagrid in March 2026
- Contact Energy and CDC began exploring a Taranaki site in August 2026
- Base Year: 2025
- Historical Period: 2019 to 2025
- Forecast Period: 2026 to 2035
- Market Size 2025 (USD million): 540.00
- Market Size 2035 (USD million): 1,505.88
- CAGR 2026 to 2035: 10.8 %
- CAGR by Facility Type: Hyperscale and AI Campuses: 14.2 %
- CAGR by Work Package: Cooling and Mechanical Systems: 12.6 %
- CAGR by Delivery Model: Build-to-Suit and Lease: 11.9 %
- CAGR by Region: Others: 16.4 %
- Datagrid Southland Campus Capacity (Megawatt): 280
- TenPeaks Development Pipeline (Megawatt): 130
- Market Share by Region 2025: Auckland (Dominant Share)
Demand is moving from colocation halls to large artificial intelligence campuses backed by renewable supply. Auckland leads today, while southern and Taranaki projects grow fastest as consents turn into construction.
Key Trends in the New Zealand Data Center Construction Market
The New Zealand data center construction market is being reshaped by new partnerships, government power rules, consented regional campuses and the move to liquid cooling.
1. August 2026 - Contact Energy and CDC Explore a Data Centre at Stratford, Taranaki
- Contact Energy said in its result of 10 August 2026 that it is working with CDC Data Centres to explore a development at Stratford.
- The company described data centre demand as exploratory, so no capacity or construction timetable has been confirmed.
- A Taranaki site would spread construction beyond Auckland and tie new halls to nearby generation, which fits the Others region.
- On 27 July 2026 Christopher Luxon asked Nicola Willis and the Department of the Prime Minister and Cabinet to draft principles for large operators.
- Large facilities would need to show additionality, meaning they add new generation instead of relying only on the existing grid.
- He rejected the Greens proposal for a one-year pause on consents, so approved projects are likely to continue to construction.
- Trade press reported on 11 March 2026 that Datagrid received full consent for a 78,000 square metre, 280 MW campus at Makarewa near Invercargill.
- On 19 March 2026 Mercury agreed a 140 MW, 15-year power purchase option, equal to about 1.2 TWh a year.
- Construction was expected to begin in June 2026 with full delivery targeted for 2028, and more than 1,200 construction jobs are forecast.
- Schneider Electric said on 14 November 2025 that its liquid cooling range is being deployed in several large New Zealand data centres.
- The range includes coolant distribution units from 105 kW to 2.5 MW and rear door heat exchangers rated up to 75 kW per rack.
- Closed-loop systems draw no water from public networks, which eases consenting and supports higher density halls.
Power policy, regional campuses and liquid cooling are the main structural forces, while grid access and the pace of consent conditions remain the biggest risks to build timing.
Recent Market Developments in the New Zealand Data Center Construction Market
Recent developments, presented from the most recent, show operator funding, grid firming, a new stand-alone operator and the arrival of a hyperscale cloud region.
1. March 2026 - Infratil and CDC Brief Investors on Auckland Campus Expansion
- At a briefing on 26 March 2026 Infratil and CDC said the building at Hobsonville known as HV2 had been completed.
- CDC's shareholders provided A$500 million of equity in February 2026 to speed construction across its Australian and New Zealand campuses.
- The company offers 100% renewable electricity by default and uses closed-loop cooling, which it says helps it fast-track development.
- Contact Energy reported that the first 100 MW battery at Glenbrook, near Auckland, came online in March 2026.
- Construction also started in March 2026 on a second 200 MW battery, due online in the first quarter of 2028.
- Firming capacity near Auckland helps colocation developers argue for new connections as power constraints tighten.
- TenPeaks launched on 25 February 2026 after Spark sold 75% to Pacific Equity Partners and kept 25%.
- It operates 23 MW across 11 facilities and holds a pipeline above 130 MW for three Auckland campuses.
- It linked more than NZ$3 billion of projects to that pipeline, rising to about NZ$6 billion with customer equipment.
- Trade press reported on 2 September 2025 that AWS launched the region with three availability zones.
- The zones sit in existing third-party data centres after the planned Westgate site stalled over stormwater consent issues.
- Amazon expects to invest more than NZ$7.5 billion and to support more than 1,000 full-time jobs a year.
Operator funding, grid firming and a new stand-alone operator show builders are lining up capacity for both leased cloud space and purpose-built campuses throughout the forecast period.
New Zealand Data Center Construction Industry Segmentation
The Expert Market Research’s report on the New Zealand Data Center Construction Market offers a detailed analysis of the market based on the following segments.
Market Breakup by Facility Type
- Hyperscale and AI Campuses
- Colocation Facilities
- Enterprise and Government Facilities
- Edge and Modular Facilities
- Others
Market Breakup by Work Package
- Civil and Structural Works
- Electrical Systems
- Cooling and Mechanical Systems
- Fit-Out, Security and Monitoring
- Others
Market Breakup by Delivery Model
- Design and Build
- Engineer-Procure-Construct
- Build-to-Suit and Lease
- Owner-Operator Self-Build
- Others
Market Breakup by Region
- Auckland
- Wellington
- Canterbury
- Waikato
- Others
CAGR 2026 to 2035, Market by Region
- Auckland: 9.6 %
- Wellington: 10.2 %
- Canterbury: 10.5 %
- Waikato: 11.1 %
- Others (incl. Southland, Taranaki and Otago): 16.4 %
Competition combines operator-developers that commission their own builds, hyperscale cloud providers that lease or build capacity, and the contractors and equipment makers that deliver halls. Entry barriers include power access, consents, skilled trades and balance sheet strength.
CDC Data Centres
CDC Data Centres, headquartered in Canberra, owns and operates hyperscale data centre campuses in Australia and New Zealand, including Silverdale and Hobsonville in Auckland. At a briefing on 26 March 2026, Infratil and CDC reported that the Hobsonville HV2 building was complete and that shareholders had provided A$500 million of equity in February 2026. In August 2026 Contact Energy said it was exploring a Stratford data centre with CDC.
TenPeaks Data Centres
TenPeaks Data Centres, headquartered in Auckland, is the data centre group carved out of Spark, which keeps 25% while Pacific Equity Partners holds 75%. It launched on 25 February 2026 with 23 MW operating across 11 facilities, including Takanini, which it says achieves a power usage effectiveness below 1.2. Its pipeline exceeds 130 MW on owned land, with more than NZ$3 billion of projects tied to it.
Datagrid
Datagrid New Zealand is developing an artificial intelligence data centre campus at Makarewa near Invercargill in Southland, led by chief executive Remi Galasso. In March 2026 it secured full resource consent for a 78,000 square metre, 280 MW site and a landing for its Tasman Ring cable at Oreti Beach. Mercury agreed a 140 MW, 15-year power option on 19 March 2026, and delivery is targeted for 2028.
Schneider Electric
Schneider Electric, headquartered in Rueil-Malmaison, France, supplies power distribution, cooling and software to New Zealand data centres. On 14 November 2025 it said its liquid cooling range, including coolant distribution units from 105 kW to 2.5 MW and rear door heat exchangers up to 75 kW per rack, is being deployed in several large sites. The closed-loop designs use no public water, supporting consents.
Other players operating in the New Zealand data center construction market include Amazon Web Services, Microsoft, Datacom, NEXTDC, and Contact Energy, alongside design consultancies, general contractors, electrical and mechanical subcontractors and equipment suppliers delivering halls, power and cooling for operators and cloud providers across New Zealand.
Key Insight
Competition rests on secured power, consented land, skilled trades and balance sheet strength rather than price alone, while partnerships between operators and energy companies could reshape positions.
Frequently Asked Questions: New Zealand Data Center Construction Market
What is the size of the New Zealand data center construction market in 2025?
The New Zealand data center construction market is valued at USD 540.00 million in 2025, supported by consented artificial intelligence campuses, operator pipelines on owned land and cloud region investment, with Auckland as the largest region.
What is the forecast for the New Zealand data center construction market by 2035?
The market is forecast to reach USD 1.50 billion by 2035, growing at a CAGR of 10.8 % over the 2026 to 2035 period, driven by hyperscale and AI demand, renewable power agreements, liquid cooling adoption and government rules on additional generation.
Which facility type has the highest CAGR in the New Zealand data center construction market?
Hyperscale and AI Campuses record the highest CAGR at an estimated 14.2% through 2035, led by Datagrid's consented 280 MW Southland campus and the 140 MW power option agreed with Mercury in March 2026.
Which region dominates the New Zealand data center construction market?
Auckland dominates, with CDC's Silverdale and Hobsonville campuses and TenPeaks' three planned campuses. Others, including Southland and Taranaki, is the fastest-growing region at an estimated 16.4% CAGR.
Who are the key players in the New Zealand data center construction market?
Key players include CDC Data Centres, TenPeaks Data Centres, Datagrid, Schneider Electric, Amazon Web Services, Microsoft, Datacom, NEXTDC, and Contact Energy.
What is TenPeaks?
TenPeaks is the Auckland-based data centre group carved out of Spark, launched on 25 February 2026. Pacific Equity Partners holds 75%, Spark keeps 25%, and its pipeline exceeds 130 MW.
Why does power policy matter for data centre builds in New Zealand?
Large campuses use substantial electricity, and in July 2026 the Prime Minister proposed that hyperscale operators show additionality by adding new generation. Developers are therefore securing power agreements before construction.
Table of Contents
Companies Mentioned
- CDC Data Centres
- TenPeaks Data Centres
- Datagrid
- Schneider Electric
- Amazon Web Services
- Microsoft
- Datacom
- NEXTDC
- Contact Energy