In 2025, the market is valued at USD 430.00 million and is forecast to grow at a CAGR of 14.0%, reaching USD 1.59 billion by 2035. Growth is driven by the arrival of local hyperscale cloud regions, demand for sovereign and artificial intelligence capacity, and a large pipeline of renewable-backed campuses in Auckland, Taranaki and Southland.
Market Overview
The New Zealand data center market is moving from a small enterprise hosting sector to a capacity-led infrastructure class. Local cloud regions, sovereign data rules and artificial intelligence workloads are pulling investors towards Auckland and, increasingly, regions with spare renewable power.
Three forces shape the market: public cloud regions that keep data onshore, government and enterprise preference for locally controlled facilities, and electricity access, because several proposed campuses are sized against national power demand and must show new generation to proceed.
In September 2025 Amazon Web Services opened its Auckland region, and in January 2026 Spark completed the sale of 75% of its data center business to Pacific Equity Partners. In July 2026 the Prime Minister said hyperscale operators must add new generation.
Key Market Trends and Insights
- Hyperscale regions arrive: Amazon Web Services committed NZ$7.5 billion to its Auckland region, which reached general availability in September 2025 with three availability zones.
- Carve-out creates a new operator: TenPeaks Data Centres began with 23 MW of operating capacity across 11 facilities and a development pipeline above 130 MW after the January 2026 Spark carve-out.
- Regional power-led campuses: Datagrid secured full resource consent in March 2026 for a campus of up to 280 MW at Makarewa near Invercargill, backed by a 140 MW power option.
- Sovereign capacity consolidates: Datacom bought T4's Tihi data center in Auckland in April 2026, adding roughly 500 rack spaces and bringing its New Zealand network to five data centers.
The market is shifting from small enterprise server rooms towards purpose-built colocation and hyperscale campuses designed for dense artificial intelligence loads. Retail colocation still serves most local enterprises, while wholesale capacity advances fastest as cloud providers and large tenants contract in bulk. Cloud and hyperscale providers become the most dynamic customer group, and facilities above 100 MW emerge from a small base as proposals move through consenting. Auckland remains the dominant region because of cable landings and customer density, while regions with generation capacity grow quickest. Government compacts on additional electricity supply, sovereign hosting requirements and liquid cooling retrofits point to a durable structural build-out rather than a short cycle.
Key Metrics
- Market Size 2025: USD 430.00 million
- Projected Market Size 2035: USD 1.59 billion
- CAGR 2026 to 2035: 14.0%
- Fastest-Growing Service Type: Wholesale Colocation: 17.0% CAGR
- Fastest-Growing End User: Cloud and Hyperscale Providers: 16.0% CAGR
- Largest Revenue Segment 2025: Retail Colocation
- Dominant Region: Auckland
- Highest CAGR by Region: Rest of New Zealand: 16.4%
- AWS Auckland region investment, 2025: NZ$7.5 billion
- Base Market Amount 2025: USD 430.00 million
Cloud Regions and Sovereign Demand Lift Revenue
Revenue is on course to more than triple, from USD 430.00 million in 2025 to USD 1.59 billion in 2035 at a 14.0% CAGR. The Auckland regions of Amazon Web Services and Microsoft keep data onshore and pull enterprise, public sector and tenant demand into local facilities.
Wholesale Capacity and Large Campuses Lead Growth
Retail colocation holds the largest share, but Wholesale Colocation grows at an estimated 17.0% CAGR and facilities above 100 MW at an estimated 19.5% CAGR through 2035. TenPeaks, Datagrid and Contact Energy with CDC Data Centres each reported multi-site pipelines in 2026.
Power Access Becomes the Gating Factor
Government policy in 2026 ties large data centers to new electricity supply, so developers with generation partners hold the strongest position. Regions with spare renewable output grow fastest, while Auckland stays the largest base.
- Mercury signed a 15-year option for 140 MW with Datagrid in March 2026
- Contact Energy and CDC are studying 250 MW at Stratford, Taranaki
- The Prime Minister backed an additionality test in July 2026
- Base Year: 2025
- Historical Period: 2019 to 2025
- Forecast Period: 2026 to 2035
- Market Size 2025 (USD million): 430.00
- Market Size 2035 (USD million): 1,594.11
- CAGR 2026 to 2035: 14.0 %
- CAGR by Service Type: Wholesale Colocation: 17.0 %
- CAGR by End User: Cloud and Hyperscale Providers: 16.0 %
- CAGR by Facility Capacity: Above 100 MW: 19.5 %
- CAGR by Region: Rest of New Zealand: 16.4 %
- TenPeaks Operating Capacity 2026 (MW): 23
- Datagrid Planned Campus Capacity 2026 (MW): 280
- Market Share by Region 2025: Auckland (Dominant Share)
Local cloud regions, sovereign hosting needs and artificial intelligence workloads are expanding demand for capacity. Auckland leads today, while power-rich regions grow fastest as large campuses advance.
Key Trends in the New Zealand Data Center Market
The New Zealand data center market is being reshaped by operator carve-outs, power-backed regional campuses, sovereign hosting and new government expectations on electricity supply.
1. July 2026 - Prime Minister Backs Additionality Rules for Large Data Centers
- On 27 July 2026 Prime Minister Christopher Luxon said the government is drafting a compact with hyperscale operators and that large facilities must add new generation.
- He rejected a Green Party call for a one-year pause on consents for large artificial intelligence data centers, calling it a signal that the country is closed to investment.
- Developers with their own generation partners stand to benefit, while projects drawing only on the existing grid face more scrutiny.
- Datacom said in April 2026 that it had acquired T4 NZ Data Centres' Auckland facility, a 5,200 square metre site, bringing its network to five data centers.
- The Tier 3+ facility holds about 500 rack spaces and supports direct liquid cooling, and it is certified for New Zealand government use.
- Locally owned capacity suits agencies wanting direct control over data residency.
- Southland District Council, Environment Southland and Invercargill City Council granted resource consent on 11 March 2026 for a campus of up to 280 MW at Makarewa.
- On 19 March 2026 Datagrid signed a 15-year option with Mercury for 140 MW, with construction targeted from June 2026 and full delivery by 2028.
- Contracted renewable supply gives regional sites a clearer route through consenting.
- Microsoft said on 19 December 2025 that its New Zealand North region runs on renewable electricity from Contact Energy and uses closed-loop cooling that draws no water.
- Customers include the Accident Compensation Corporation, Spark, Techion and Christchurch City Council, which completed a major cloud migration during the year.
- Whakarongorau Aotearoa reported savings of around NZ$10,000 a month after moving.
Operator carve-outs, power-backed regional campuses and sovereign hosting define the main trends, while government expectations on new electricity supply now shape which large projects can proceed.
Recent Market Developments in the New Zealand Data Center Market
Recent developments, presented from the most recent, show a power-linked Taranaki proposal, an equity stake in a Southland developer, an operator launch and a hyperscale cloud region opening.
1. August 2026 - Contact Energy and CDC Explore a 250 MW Data Center in Taranaki
- Contact Energy said on 13 August 2026 that it is working with CDC Data Centres on a 250 MW IT load facility at Stratford, near its retired Taranaki gas plant.
- The site already has a grid connection, and power would come from a long-term contract backed by new geothermal, wind and solar generation.
- No construction is committed, and CDC said it would proceed only if the proposal met the required tests.
- Mercury announced on 22 July 2026 that it acquired a 12.7% minority stake in Datagrid NZ for NZ$53 million, funded from existing capital facilities.
- The stake follows a 140 MW power option for the planned Makarewa campus near Invercargill, which would be second only to the Tiwai Point smelter for industrial power use.
- A generator taking equity shows power supply becoming central to project finance.
- TenPeaks Data Centres launched on 4 March 2026 under chief executive Michael Stribling, with Rob Woodgate joining as chief financial officer.
- It operates 23 MW across 11 facilities and holds a development pipeline above 130 MW on owned land, including three major Auckland campuses.
- Spark is a key initial colocation customer and retains 25%, which gives the new operator anchor demand.
- Amazon Web Services announced general availability of its Auckland region on 1 September 2025, with three availability zones.
- The company is investing NZ$7.5 billion, which it expects to add NZ$10.8 billion to gross domestic product and support about 1,000 jobs a year.
- A second local hyperscale region lifts demand for interconnection services.
A power-linked Taranaki proposal, generator equity in a Southland developer, a new operator launch and a hyperscale region opening show capital moving towards onshore, renewable-backed capacity.
New Zealand Data Center Industry Segmentation
The Expert Market Research’s report on the New Zealand Data Center Market offers a detailed analysis of the market based on the following segments.
Market Breakup by Service Type
- Retail Colocation
- Wholesale Colocation
- Managed Hosting
- Interconnection and Others
- Others
Market Breakup by End User
- Cloud and Hyperscale Providers
- Telecommunications and IT Services
- Government and Public Sector
- Enterprises and Others
- Others
Market Breakup by Facility Capacity
- Below 5 MW
- 5 MW to 20 MW
- 20 MW to 100 MW
- Above 100 MW
- Others
Market Breakup by Region
- Auckland
- Wellington
- Canterbury
- Waikato
- Rest of New Zealand
- Others
CAGR 2026 to 2035, Market by Region
- Auckland: 14.6 %
- Wellington: 12.8 %
- Canterbury: 13.2 %
- Waikato: 15.1 %
- Rest of New Zealand (incl. Southland and Taranaki): 16.4 %
Competition combines specialist colocation operators, a locally owned technology services group, global cloud providers and new power-backed developers. Entry barriers include grid access, resource consents, cable connectivity, government certification, capital and the ability to secure anchor tenants.
CDC Data Centres
CDC Data Centres, headquartered in Canberra, Australia, builds hyperscale and government data center campuses in Australia and New Zealand, including the Silverdale and Hobsonville campuses in Auckland. It reported about 100 MW of new contracted capacity for cloud and artificial intelligence workloads in September 2025. In August 2026 it began exploring a 250 MW data center with Contact Energy at Stratford, Taranaki, which is not yet committed.
TenPeaks Data Centres
TenPeaks Data Centres is the New Zealand operator created when Spark sold 75% of its data center business to Pacific Equity Partners, completed in January 2026 at an enterprise value of up to NZ$705 million. It runs 11 facilities with 23 MW and plans over 130 MW on owned land. In February 2026 it said its pipeline represents more than NZ$3 billion of investment, including the new Takanini data center.
Microsoft
Microsoft, headquartered in Redmond, Washington, runs the New Zealand North cloud region, its first in the country, powered by renewable electricity from Contact Energy. In December 2025 it reported customers including the Accident Compensation Corporation, Spark, Techion and Christchurch City Council, and said it aims to upskill 100,000 New Zealanders for the digital economy by 2027.
Amazon Web Services
Amazon Web Services, headquartered in Seattle, Washington, launched its Asia-Pacific (New Zealand) region in Auckland with three availability zones on 1 September 2025. The company is investing NZ$7.5 billion in the region, which it expects to add NZ$10.8 billion to gross domestic product and support about 1,000 jobs each year.
Other players operating in the New Zealand data center market include Datacom, Datagrid New Zealand, Spark New Zealand, Vocus, and Contact Energy, alongside regional hosting providers, carrier-neutral interconnection operators, power developers and managed service firms supplying capacity to enterprises, agencies and cloud providers across New Zealand.
Key Insight
Competition rests on grid access, consenting, cable connectivity, government certification and anchor tenants rather than price alone, while power partnerships increasingly decide which developers can scale.
Frequently Asked Questions: New Zealand Data Center Market
What is the size of the New Zealand data center market in 2025?
The New Zealand data center market is valued at USD 430.00 million in 2025, supported by local hyperscale cloud regions, sovereign hosting needs and a growing pipeline of renewable-backed campuses, with Auckland as the largest region.
What is the forecast for the New Zealand data center market by 2035?
The market is forecast to reach USD 1.59 billion by 2035, growing at a CAGR of 14.0 % over the 2026 to 2035 period, driven by artificial intelligence workloads, wholesale capacity contracts, government expectations on new generation and the spread of campuses into power-rich regions.
Which service type has the highest CAGR in the New Zealand data center market?
Wholesale Colocation records the highest CAGR at an estimated 17.0% through 2035, as cloud providers and large tenants contract bulk capacity in Auckland and in regions with spare renewable power.
Which region dominates the New Zealand data center market?
Auckland dominates, helped by the Amazon Web Services region, submarine cable landings and operator campuses. Rest of New Zealand is the fastest-growing region at an estimated 16.4% CAGR, led by Southland and Taranaki proposals.
Who are the key players in the New Zealand data center market?
Key players include CDC Data Centres, TenPeaks Data Centres, Microsoft, Amazon Web Services, Datacom, Datagrid New Zealand, Spark New Zealand, Vocus, and Contact Energy.
What is TenPeaks Data Centres?
TenPeaks is the data center operator formed when Spark sold 75% of its data center business to Pacific Equity Partners in January 2026. It operates 11 facilities with 23 MW and plans more than 130 MW.
Why is power access important for New Zealand data centers?
Large campuses can rival major industrial users, and in July 2026 the Prime Minister said big facilities must add new generation. Projects such as Datagrid's 280 MW campus therefore pair with contracted renewable supply.
Table of Contents
Companies Mentioned
- CDC Data Centres
- TenPeaks Data Centres
- Microsoft
- Amazon Web Services
- Datacom
- Datagrid New Zealand
- Spark New Zealand
- Vocus
- Contact Energy