In 2025, the market is valued at USD 145.00 million and is forecast to grow at a CAGR of 13.5%, reaching USD 514.43 million by 2035. Growth is driven by the launch of the Amazon Web Services New Zealand region in September 2025, the carve-out of Spark's data centers into TenPeaks Data Centres in January 2026 and consented artificial intelligence campuses in Southland and Taranaki.
Market Overview
The New Zealand data center power market is moving from a small enterprise base towards large cloud and AI campuses. Operators are ordering transformers, substations and backup systems years ahead, while the grid owner and government test how much new load the system can absorb.
Three forces are shaping the market: cloud region launches that pull in hyperscale tenants; AI projects led by Datagrid in Southland and by Contact Energy and CDC in Taranaki; and a stressed grid, with Transpower reporting in August 2026 that eight of the ten highest demand peaks on record came in the previous month.
In September 2025 Amazon launched its New Zealand region with a commitment of more than NZ$7.5 billion. In March 2026 Datagrid won consents for a 280 MW campus, and in August 2026 Elsewedy Electric was named supplier of four transformers for its substation.
Key Market Trends and Insights
- Cloud region investment: Amazon launched its Asia-Pacific (New Zealand) Region in September 2025 with three Availability Zones and committed more than NZ$7.5 billion to construction and operation of its data centers.
- Colocation recapitalized: Spark completed the sale of 75% of its data center business to Pacific Equity Partners in January 2026, creating a platform with more than 23 MW built and a pipeline above 130 MW.
- AI campus scale: Datagrid's Makarewa campus in Southland won consents for 280 MW in March 2026, and its dedicated substation is rated at 360 MVA, according to an August 2026 announcement.
- Grid scrutiny: Finance Minister Nicola Willis said in August 2026 that officials will study measures so new data centers add generation, as Datagrid could use about 4.25% of national electricity at full load.
The market is moving from small enterprise server rooms towards large colocation, cloud and AI campuses that need dedicated substations, high-capacity switchgear and high-density power architectures. Uninterruptible power supply systems lead in value today, while switchgear and power distribution grows fastest as grid exit points are specified ahead of construction. Colocation remains the largest customer group, but hyperscale and cloud demand advances quickest. Auckland stays the largest region, and southern and Taranaki sites drive the fastest regional growth. Sovereign cloud needs, renewable power purchase options and grid connection rules point to a durable build cycle, although approvals, generation supply and electricity price politics could slow the largest projects.
Key Metrics
- Market Size 2025: USD 145.00 million
- Projected Market Size 2035: USD 514.43 million
- CAGR 2026 to 2035: 13.5%
- Fastest-Growing Power Equipment: Switchgear and Power Distribution: 15.2% CAGR
- Fastest-Growing Data Center Type: Hyperscale and Cloud: 16.4% CAGR
- Largest Revenue Segment 2025: UPS Systems
- Dominant Region: Auckland
- Highest CAGR by Region: Others: 17.4%
- Amazon commitment to New Zealand data centers, September 2025: More than NZ$7.5 billion
- Base Market Amount 2025: USD 145.00 million
Cloud and AI Projects Turn a Niche Into a Build Cycle
Revenue is on course to more than triple, from USD 145.00 million in 2025 to USD 514.43 million in 2035 at a 13.5% CAGR, in our estimate. The Amazon region of September 2025 and the TenPeaks recapitalization of January 2026 bring the first large repeatable power system orders.
Switchgear and Hyperscale Demand Lead Growth
UPS Systems hold the largest share, but Switchgear and Power Distribution grows at an estimated 15.2% CAGR and Hyperscale and Cloud at an estimated 16.4% CAGR through 2035. Datagrid's order of four high-voltage transformers in August 2026 shows how early grid-side equipment is now committed.
Grid Capacity Becomes the Gating Factor
Transpower reported record winter demand in August 2026 while a growing pipeline of electricity-intensive projects awaits assessment, so generation and connection timing will decide which campuses proceed.
- Mercury signed a 140 MW power purchase option with Datagrid in March 2026
- Contact Energy and CDC explore 250 MW at Stratford in August 2026
- Government asked for further measures on electricity prices in August 2026
- Base Year: 2025
- Historical Period: 2019 to 2025
- Forecast Period: 2026 to 2035
- Market Size 2025 (USD million): 145.00
- Market Size 2035 (USD million): 514.43
- CAGR 2026 to 2035: 13.5 %
- CAGR by Power Equipment: Switchgear and Power Distribution: 15.2 %
- CAGR by Data Center Type: Hyperscale and Cloud: 16.4 %
- CAGR by Facility Capacity: Above 100 MW: 18.6 %
- CAGR by Region: Others: 17.4 %
- Datagrid Makarewa Consented Load (Megawatts): 280
- TenPeaks Built Capacity at Launch (Megawatts): 23
- Market Share by Region 2025: Auckland (Dominant Share)
Cloud regions, colocation recapitalization and AI campuses are lifting orders for power systems, while grid capacity limits timing. Auckland leads, and southern and Taranaki projects grow fastest.
Key Trends in the New Zealand Data Center Power Market
The New Zealand data center power market is being reshaped by grid-side equipment orders, generator-linked AI campus proposals, electricity price politics and large consented projects.
1. August 2026 - Datagrid Secures Four Transformers From Elsewedy Electric for Southland Substation
- Datagrid announced on 12 August 2026 that Elsewedy Electric will supply four high-voltage power transformers for its dedicated substation at Makarewa.
- The substation is rated at 360 MVA, roughly 340 MW, with one transformer held as backup, and is due to be commissioned in late 2027.
- Early orders show grid-side switchgear and transformers are now the longest lead items.
- Contact Energy and CDC said on 10 August 2026 that they are exploring a data center of up to 250 MW near the retired Taranaki Combined Cycle gas plant.
- The site has an existing grid connection, 500 MW of consented grid-scale batteries and a nearby 150 MWac solar project.
- Co-located storage would raise demand for batteries, switchgear and power quality equipment.
- Finance Minister Nicola Willis said on 3 August 2026 that officials advised near-term data center rollouts would not push prices up.
- She asked for more work so new data centers bring additional generation, with Australian rules as a reference.
- Any duty to fund generation or storage on site could lift demand for generators and batteries.
- Southland District Council, Environment Southland and Invercargill City Council approved the Makarewa campus and its dedicated grid exit substation in March 2026.
- The campus would draw 280 MW, making it the second-largest electricity user in New Zealand after the Tiwai Point aluminium smelter.
- Mercury signed a 140 MW power purchase option with Datagrid that month, tying supply to the project.
Early orders for transformers and switchgear, battery-backed generation sites and government scrutiny of electricity prices are the main forces, while grid timing remains the main risk.
Recent Market Developments in the New Zealand Data Center Power Market
Recent developments, presented from the most recent, show investment in Datagrid, an Auckland data center acquisition, the carve-out of Spark's facilities and new liquid cooling and power offers.
1. July 2026 - Mercury Takes 12.7% Stake in Datagrid for USD 30 Million
- Mercury NZ committed USD 30 million for a 12.7% minority stake in Datagrid NZ, announced on 28 July 2026.
- The stake builds on the 140 MW power purchase option signed in March 2026 for the 360 MW Makarewa development.
- A listed generator holding equity in a load customer shows how closely power supply and delivery are linked.
- Datacom completed the acquisition of T4's Auckland data center on 2 April 2026 for an undisclosed sum.
- The site has 5,200 square metres, including 1,500 square metres of column-free raised floor, and keeps existing customers.
- Planned upgrades for liquid cooling and high density imply new power distribution and backup spending.
- The sale completed in January 2026 at an enterprise value of up to NZ$705 million, creating TenPeaks Data Centres under chief executive Michael Stribling.
- TenPeaks launched with more than 23 MW built across 11 facilities and a pipeline above 130 MW, including a North Shore greenfield site.
- Spark kept 25% and two board seats, and the platform can now fund power upgrades at Takanini and new builds.
- Schneider Electric introduced coolant distribution units from 105 kW to 2.5 MW for New Zealand data centers on 14 November 2025.
- Rear door heat exchangers cool up to 75 kW per rack, and the company said the range is being deployed in several large facilities.
- Higher rack densities tie cooling to UPS and power distribution sizing in AI-ready halls.
Equity in an AI campus developer, a major Auckland acquisition and new liquid cooling offers show suppliers and operators positioning for dense, high-capacity power architectures.
New Zealand Data Center Power Industry Segmentation
The Expert Market Research’s report on the New Zealand Data Center Power Market offers a detailed analysis of the market based on the following segments.
Market Breakup by Power Equipment
- UPS Systems
- Generators
- Switchgear and Power Distribution
- Others
Market Breakup by Data Center Type
- Colocation
- Hyperscale and Cloud
- Enterprise and Government
- Edge and Others
- Others
Market Breakup by Facility Capacity
- Up to 5 MW
- 5 MW to 20 MW
- 20 MW to 100 MW
- Above 100 MW
- Others
Market Breakup by Region
- Auckland
- Wellington
- Canterbury
- Waikato
- Others
CAGR 2026 to 2035, Market by Region
- Auckland: 12.8 %
- Wellington: 12.0 %
- Canterbury: 13.0 %
- Waikato: 14.2 %
- Others (incl. Southland and Taranaki): 17.4 %
Competition combines global power equipment makers, data center developers and electricity suppliers that now take equity in load. Entry barriers include grid connection access, equipment lead times, local service coverage and relationships with operators.
Schneider Electric
Schneider Electric, headquartered in Rueil-Malmaison, France, supplies UPS systems, switchgear, power distribution and EcoStruxure software for data centers. On 14 November 2025 it launched its advanced liquid cooling portfolio in New Zealand, including coolant distribution units from 105 kW to 2.5 MW, and said the range is being deployed in several large facilities.
Vertiv
Vertiv, headquartered in Westerville, Ohio, United States, sells UPS systems, power distribution, thermal management and monitoring for data centers through a regional channel. On 28 July 2026 it outlined its partner strategy for Australia and New Zealand as customers move from AI trials to deployment. In August 2026 it launched a 1.8 MW UPS aimed at AI data centers in Asia.
CDC Data Centres
CDC Data Centres, headquartered in Canberra, Australia, and held within Infratil's portfolio, operates hyperscale campuses at Silverdale and Hobsonville in Auckland. At a briefing on 26 March 2026 it reported more than 2.7 GW of total capacity and A$500 million of equity raised in February 2026, with Hobsonville HV2 complete. In August 2026 it began exploring a 250 MW data center at Stratford with Contact Energy.
Datagrid New Zealand
Datagrid New Zealand, led by founder and chief executive Remi Galasso, is developing a carbon-neutral hyperscale AI campus at Makarewa near Invercargill. It won consents for 280 MW in March 2026, signed a 140 MW power purchase option with Mercury that month, and on 12 August 2026 agreed to buy four high-voltage transformers from Elsewedy Electric for a 360 MVA substation, with commissioning targeted for late 2027.
Other players operating in the New Zealand data center power market include Mercury NZ, Datacom, Contact Energy, TenPeaks Data Centres, and Elsewedy Electric, alongside Transpower as grid owner, regional electrical contractors, equipment distributors, battery integrators and service providers supplying colocation, cloud, enterprise and government sites across New Zealand.
Key Insight
Competition rests on grid connection access, equipment lead times, local service coverage and operator relationships rather than price, while electricity suppliers taking equity in load could reshape positions.
Frequently Asked Questions: New Zealand Data Center Power Market
What is the size of the New Zealand data center power market in 2025?
The New Zealand data center power market is valued at USD 145.00 million in 2025, supported by cloud region launches, the recapitalization of colocation platforms and consented AI campuses, with Auckland as the largest region.
What is the forecast for the New Zealand data center power market by 2035?
The market is forecast to reach USD 514.43 million by 2035, growing at a CAGR of 13.5 % over the 2026 to 2035 period, driven by hyperscale and AI demand, early grid-side equipment orders, renewable power purchase options and a government focus on keeping electricity affordable.
Which power equipment type has the highest CAGR in the New Zealand data center power market?
Switchgear and Power Distribution records the highest CAGR at an estimated 15.2% through 2035, as dedicated substations, transformers and medium-voltage assemblies are specified early for large campuses.
Which region dominates the New Zealand data center power market?
Auckland dominates, as it hosts the Amazon region, CDC's campuses and several colocation sites. Others, including Southland and Taranaki, is the fastest-growing group at an estimated 17.4% CAGR on AI campus projects.
Who are the key players in the New Zealand data center power market?
Key players include Schneider Electric, Vertiv, CDC Data Centres, Datagrid New Zealand, Mercury NZ, Datacom, Contact Energy, TenPeaks Data Centres, and Elsewedy Electric.
What is Datagrid's Makarewa campus?
It is a hyperscale AI data center in Southland. Datagrid won consents for 280 MW in March 2026, and its 360 MVA substation, with four Elsewedy Electric transformers, targets commissioning in late 2027.
What is TenPeaks Data Centres?
TenPeaks Data Centres is the standalone data center company created when Spark sold 75% to Pacific Equity Partners in January 2026. It launched with more than 23 MW built across 11 facilities and a pipeline above 130 MW.
Table of Contents
Companies Mentioned
- Schneider Electric
- Vertiv
- CDC Data Centres
- Datagrid New Zealand
- Mercury NZ
- Datacom
- Contact Energy
- TenPeaks Data Centres
- Elsewedy Electric
Table Information
| Report Attribute | Details |
|---|---|
| No. of Pages | 128 |
| Published | November 2026 |
| Forecast Period | 2025 - 2035 |
| Estimated Market Value ( USD | $ 145 Million |
| Forecasted Market Value ( USD | $ 514.43 Million |
| Compound Annual Growth Rate | 13.5% |
| Regions Covered | New Zealand |
| No. of Companies Mentioned | 9 |